Home > GE > Ultrasound System > GE Vivid 7 Service Manual

GE Vivid 7 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Vivid 7 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 858
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    Chapter 8 - Replacement Procedures 8 - 103
    Section 8-19
    Brake Pedal and Direct ion Lock Assembly Replacement Procedures
    8-19-1 Manpower
    One person, 1 hour
    8-19-2 Tools
    • Phillips screwdriver size 2
    • Hexagon key 5 mm
    • Torx screwdriver T-20
    • Wrench 11 and 13 mm
    8-19-3 Preparations
    1.) Remove Front Bumper, see  Front Bumper Removal Procedure on page 8-100 .
    2.) Remove footrests on both pedals by unscrewing 4 Torx screws on each.
    8-19-4 Brake Pedal and Direct ion Lock Removal Procedure
    1.) Unscrew 2 nuts on the two ball joints on the brak e rods, located over the middle of brake assembly. 
    Wrench 11 and 13.
    2.) Unscrew the 4 hexagon sc rews. Two of them located under the Brake Assembly.
    NOTE: The nuts may slide out of position.
    3.) Remove the Brake Pedal and Direction Lock Assembly.
     
    Figure 8-100   Brake Assembly
    Hexagon screws
    Ball joint nuts 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    8 - 104 Section 8-19 - Brake Pedal and Direction Lock Assembly Replacement Procedures
    8-19-5 Brake Pedal and Directi on Lock Installation Procedure
    1.) Put the Brake Pedal and Direction Lock Assembly  in position and fasten the 4 hexagon screws 
    loosely in the sliding nuts.
    2.) Fasten the ball joint nuts before tightening the 4 hexagon screws.
    3.) Install Front Bumper, see  Front Bumper Installation Procedure on page 8-100 .
    4.) Fasten footrests to Brake Pedal and Direction  Lock Assembly. Fasten the screws gently.
    8-19-6 Verification - Functional Checks
    • Please perform the tests specified in Section 8-20 Verification - Functional Checks on page 8-105 . 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    Chapter 8 - Replacement Procedures 8 - 105
    Section 8-20
    Verification - Functional Checks
    8-20-1 Functional Checks and Tests 
    The following table lists the required Function al Tests, based upon the FRU being replaced.
    Table 8-22    Functional Test Matrix   sheet 1 of 3
    SectionFRU Replacement Diagnostics
    Leakage  Current
    Functional Test
    Basic Functional Checks 3-6-6-1 Connect Mains Power to the Unit on page 3-23
    4-2-2 Power ON/ Boot UP on page 4-3
    3-6-5-1 Connect a Probe on page 3-21
    4-3-5 Performance Tests on page 4-31
    4-3-6 2D Mode (B mode) Checks on page 4-32
    4-3-7 M Mode Checks on page 4-39
    4-3-8 Color Mode Checks on page 4-43
    4-3-9 Doppler Mode Checks on page 4-49
    4-3-11 Tissue Velocity Imaging (TVI) Checks on page 4-57
    4-3-12 Contrast Checks on page 4-63
    4-3-13 Stress Echo on page 4-63
    4-3-14 Measurements and Multi Image Checks on page 4-64
    4-3-15 Multi Image Checks on page 4-66
    4-3-18 Cineloop Check on page 4-69
    3-6-5-2 Disconnect Probe on page 3-22
    4-2-3 Power Shut Down on page 4-7
    8-2 Side Covers (with Bumpers) 
    Replacement Procedure on 
    page 8-4 4-2-2 Power ON/ Boot UP on page 4-3
    4-2-3 Power Shut Down on page 4-7
    3-6-5-1 Connect a Probe on page 3-21
    4-3-5 Performance Tests on page 4-31
    4-3-6 2D Mode (B mode) Checks on page 4-32
    4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    8-3 Upper Rear Cover (Filter 
    Cover) Replacement 
    Procedure on page 8-6 4-2-2 Power ON/ Boot UP on page 4-3
    4-2-3 Power Shut Down on page 4-7
    3-6-5-1 Connect a Probe on page 3-21
    4-3-5 Performance Tests on page 4-31
    4-3-6 2D Mode (B mode) Checks on page 4-32
    4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    8-4Front Cover Replacement 
    Procedure on page 8-7
    4-2-2 Power ON/ Boot UP on page 4-3
    4-2-3 Power Shut Down on page 4-7
    3-6-5-1 Connect a Probe on page 3-21
    4-3-5 Performance Tests on page 4-31
    4-3-6 2D Mode (B mode) Checks on page 4-32
    4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    8-5Air Filter Replacement 
    Procedure on page 8-8
    4-2-2 Power ON/ Boot UP on page 4-3
    4-2-3 Power Shut Down on page 4-7
    3-6-5-1 Connect a Probe on page 3-21
    4-3-5 Performance Tests on page 4-31
    4-3-6 2D Mode (B mode) Checks on page 4-32
    4-3-21-3 Brakes and Direction Lock Checks on page 4-80 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    8 - 106 Section 8-20 - Verifi cation - Functional Checks
    8-6
    Lower Rear Cover 
    Replacements Procedure on 
    page 8-10
    4-2-2 Power ON/ Boot UP on page 4-3
    4-2-3 Power Shut Down on page 4-7
    3-6-5-1 Connect a Probe on page 3-21
    4-3-5 Performance Tests on page 4-31
    4-3-6 2D Mode (B mode) Checks on page 4-32
    4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    8-7 Software Loading Procedure - 
    Software Version v7.x, v6.x, 
    v5.x and v4.x on page 8-12 4-4-1 Software Configuration Checks on page 4-82
    Perform 
     Basic Functional  Checks on page 8-105
    3-7-1-4 Language Selection on page 3-30
    3-7-1-5 Online Manual Language Selection on page 3-31
    8-8 Software Loading Procedure - 
    Software Version v3.x on page 
    8-38 4-4-1 Software Configuration Checks on page 4-82
    Perform 
     Basic Functional  Checks on page 8-105
    3-7-1-4 Language Selection on page 3-30
    3-7-1-5 Online Manual Language Selection on page 3-31
    8-9 Software Loading Procedure - 
    Software Version v2.x on page 
    8-54 4-4-1 Software Configuration Checks on page 4-82
    Perform 
     Basic Functional  Checks on page 8-105
    3-7-1-4 Language Selection on page 3-30
    3-7-1-5 Online Manual Language Selection on page 3-31
    8-11AC Power Replacement 
    Procedure on page 8-82
    10-7-4
    10-7-5
    10-7-6
    10-7-7
    10-7-8
    10-7-9
    Perform   Basic Functional  Checks on page 8-105
    10-7-4 Grounding Continuity on page 10-14
    10-7-5 Chassis Leakage Current Test on page 10-16
    10-7-6 Isolated Patient Lead (Source) Leakage–Lead to 
    Ground on page 10-17
    10-7-7 Isolated Patient Lead (Source) Leakage–Lead to 
    Lead on page 10-18
    10-7-8 Isolated Patient Lead (Sink) Leakage-Isolation Test 
    on page 10-19
    10-7-9 Probe Leakage Current Test on page 10-21
    8-12DC Power Replacement 
    Procedure on page 8-86
    10-7-4
    10-7-5
    10-7-6
    10-7-7
    10-7-8
    10-7-9
    Perform   Basic Functional  Checks on page 8-105
    10-7-4 Grounding Continuity on page 10-14
    10-7-5 Chassis Leakage Current Test on page 10-16
    10-7-6 Isolated Patient Lead (Source) Leakage–Lead to 
    Ground on page 10-17
    10-7-7 Isolated Patient Lead (Source) Leakage–Lead to 
    Lead on page 10-18
    10-7-8 Isolated Patient Lead (Sink) Leakage-Isolation Test 
    on page 10-19
    10-7-9 Probe Leakage Current Test on page 10-21
    8-13TX Power Replacement 
    Procedure on page 8-89
    10-7-4
    10-7-5
    10-7-6
    10-7-7
    10-7-8
    10-7-9
    Perform   Basic Functional  Checks on page 8-105
    10-7-4 Grounding Continuity on page 10-14
    10-7-5 Chassis Leakage Current Test on page 10-16
    10-7-6 Isolated Patient Lead (Source) Leakage–Lead to 
    Ground on page 10-17
    10-7-7 Isolated Patient Lead (Source) Leakage–Lead to 
    Lead on page 10-18
    10-7-8 Isolated Patient Lead (Sink) Leakage-Isolation Test 
    on page 10-19
    10-7-9 Probe Leakage Current Test on page 10-21
    Table 8-22    Functional Test Matrix (cont’d) sheet 2 of 3
    SectionFRU Replacement Diagnostics
    Leakage  Current
    Functional Test 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    Chapter 8 - Replacement Procedures 8 - 107
    8-14 Rear Casters Replacement 
    Procedure on page 8-91 4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    Perform 
     Basic Functional  Checks on page 8-105
    8-15 Front Casters Replacement 
    Procedure on page 8-95 4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    Perform 
     Basic Functional  Checks on page 8-105
    8-16 Front Bumper Replacement 
    Procedure on page 8-100 4-3-21-3 Brakes and Direction Lock Checks on page 4-80
    Perform 
     Basic Functional  Checks on page 8-105
    8-17Brake Pedal Replacement 
    Procedure on page 8-1014-3-21-3 Brakes and Direction Lock Checks on page 4-80
    Perform  Basic Functional  Checks on page 8-105
    8-18
    Direction Lock Pedal 
    Replacement Procedure on 
    page 8-1024-3-21-3 Brakes and Direction Lock Checks on page 4-80
    Perform  Basic Functional  Checks on page 8-105
    8-19
    Brake Pedal and Direction 
    Lock Assembly Replacement 
    Procedures on page 8-1034-3-21-3 Brakes and Direction Lock Checks on page 4-80
    Perform  Basic Functional  Checks on page 8-105
    Table 8-22    Functional Test Matrix (cont’d) sheet 3 of 3
    SectionFRU Replacement Diagnostics
    Leakage 
    Current
    Functional Test 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    8 - 108 Section 8-20 - Verifi cation - Functional Checks
    This page was intentionally left blank. 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    Chapter 9 - Renewal Parts 9 - 1
    Chapter 9 
    Renewal Parts
    Section 9-1
    Overview
    9-1-1 Purpose of Chapter 9
    This chapter gives you an overview of Spare Parts for Vivid 7.
    9-1-2 Contents in Chapter 9
    Table 9-1    Contents in Chapter 9 
    SECTIONDESCRIPTION
    PAGE 
    NUMBER
    9-1 Overview 9-1
    9-2 Definitions of Left, Right, Front and Back 9-2
    9-3 List of Abbreviations 9-3
    9-4Parts List Groups9-4
    9-5Vivid 7 Models and Hardware/Software Compatibility9-7
    9-6Software9-10
    9-7 Plastic Parts, Console, Top and Front 9-17
    9-8 Plastic Parts, Airduct Cover and Cover Boxes 9-19
    9-9 Plastic Parts, External Covers and Bumpers, Left, Right and Rear 9-20
    9-10Frogleg and Swivel Arm9-21
    9-11Console Lock9-22
    9-12Gas Spring9-25
    9-13 Fan Assembly 9-26
    9-14 Operator Panel 9-27
    9-15 Monitor Assembly 9-34
    9-16Casters9-36
    9-17Brake Assembly9-37
    9-18Front-End Processor Card Cage9-38
    9-19 Back-End Processor 9-46
    9-20 AC Power Parts 9-61
    9-21 Input /Output Modules 9-62
    9-22Peripherals9-63 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    9 - 2  - 
    Section 9-2
    Definitions of Left, Right, Front and Back
    9-23Cables - Vivid 79-69
    9-24ECG Cables9-78
    9-25 Physio TX Parts 9-79
    9-26 Probes 9-80
    9-27 Probe Service Parts 9-90
    9-28Other Probe Part(s)9-90
    9-29Options9-91
    9-30Kits9-99
    9-31 Accessory Boxes, Vivid 7 / Vivid 7 PRO 9-105
    9-32 Product Manuals 9-108
    9-33 Packing Parts for Reshipment - Vivid 7 with LCD 9-120
    9-34Packing Parts for Reshipment - Vivid 7 with CRT9-121
    Figure 9-1   Definition of Left, Right, Front and Back of Vivid 7
    Table 9-1    Contents in Chapter 9 (cont’d)
    SECTIONDESCRIPTION
    PAGE 
    NUMBER
    RIGHT SIDE
    REAR / BACK
    LEFT SIDE FRONT 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    Chapter 9 - Renewal Parts 9 - 3
    Section 9-3
    List of Abbreviations
    Table 9-2    List of Abbreviations 
    ABBREVIATIONSDESCRIPTION
    3D THREE DIMENSIONAL (SEE  RT3D and 4D)
    4D  4 Dimensional is the same as  RT3D. 3D view in real time. The time is the 4th dimension.
    ACP AC CONTROLLER (AC POWER)
    ACTAC TRANSFORMER
    ASSY ASSEMBLY
    BEPBACK-END PROCESSOR
    CTRL CONTROL
    EXT. EXTERNAL
    F. O . B . FLOCK OF BIRDS—FOR 3D OPTION 
    NOTE: 
    “FLOCK OF BIRDS” IS NOT USED ON THE Vivid 7 SCANNER
    FEPFRONT-END PROCESSOR
    FRU YREPLACEMENT PART
    FRU NNON STOCK PART
    I/O INPUT/OUTPUT
    INT INTERNAL
    LCD LIQUID CRYSTAL DISPLAY
    OPOPERATOR PANEL
    PCPERSONAL COMPUTER (BACK-END PROCESSOR)
    PSPOWER SUPPLY
    PWA PRINTED WIRE ASSEMBLY
    QTY QUANTITY USED PER SCANNER
    RT3D REAL TIME THREE DIMENSIONAL (OPTION  TO Vivid 7–INTRODUCED 2004) Same as 4D.
    RXRECEIVER
    TXTRANSMITTER
    XFRMRTRANSFORMER 
    						
    							
    GE HEALTHCARE
    DIRECTION FC091194, REVISION 11    VIVID 7 SERVICE MANUAL 
    9 - 4 Section 9-4 - Parts List Groups
    Section 9-4
    Parts List Groups
    Table 9-3    Parts List Groups   sheet 1 of 3
    TABLE NO.DESCRIPTION
    PAGE 
    NUMBER
    Table 9-4 Vivid 7 Models and Hardware/Software Compatibility 9-7
    Table 9-5 Software used on BT’08 (Software Version v7.x) 9-10
    Table 9-6 Software used on BT’06 (Software Version v6.x) 9-11
    Table 9-7Software used on BT’05 (Software Version v5.x)9-12
    Table 9-8Software used on BT’04 (Software Version v4.x)9-13
    Table 9-9Software used on BT’03 (Software Version v3.x)9-14
    Table 9-10 Software used on BT’02 (Software Version v2.x) 9-15
    Table 9-11 Software used on BT’01 (Software Version v1.x) 9-15
    Table 9-12 Software Patches 9-16
    Table 9-13Printer Drivers9-16
    Table 9-14Parts, Front of Vivid 79-17
    Table 9-15Plastic Parts, Airduct Cover and Cover Boxes9-19
    Table 9-16 Plastic Parts, External Covers and Bumpers, Left, Right and Rear 9-20
    Table 9-17 Frogleg and Swivel Mechanism Parts 9-21
    Table 9-18 Top Console Lock - VIVID 7/VIVID 7 Dimension 9-23
    Table 9-19Top Console Lock - Vivid 7 PRO9-24
    Table 9-20Gas Spring9-25
    Table 9-21Fan Assembly9-26
    Table 9-22 OP–3 FRU Parts 9-28
    Table 9-23 OP–2 FRU Parts 9-30
    Table 9-24 OP–1 - FRU Parts 9-31
    Table 9-25OP–1 and OP–2 Common Parts9-33
    Table 9-26LCD Monitor Parts9-34
    Table 9-27CRT Monitor Parts9-35
    Table 9-28 Casters 9-36
    Table 9-29 Brake Assembly 9-37
    Table 9-30 Required Revisions for Cards and Modules, FEP2 9-38
    Table 9-31PCB Boards used in FEP- 29-41
    Table 9-32Required Revisions for Cards and Modules, Front-End Processor V1 (FEP1)9-42
    Table 9-33PCB Boards used in FEP19-45
    Table 9-34 BEP overview 9-46 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Vivid 7 Service Manual