Home
>
Toshiba
>
Communications System
>
Toshiba Voice Processing Vp100 Installation And Maintenance Manual
Toshiba Voice Processing Vp100 Installation And Maintenance Manual
Have a look at the manual Toshiba Voice Processing Vp100 Installation And Maintenance Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 566 Toshiba manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
1 3. Type ATX -1 4. Type ATD 5. Dial remote VP 100 6. Press 0 q q q 7. Press (1, hang up 8. Logon to the VP 100 - _ _ Terminating the Remote Connection The modem must respond w+rf: .-OK.” This command instructs the ni&sm to ignore dial tone detection. . Do not press [Enter - yet. When the VP 100 answers: (On the touchtone #tone.) The VP 100 modem tone should be heard- The modem and the VP 100 m&em should now connect and the VP 100 system header should appear_ (At maintenance level) Perform a remote configuration change or backup (IAltl B). When all activities with the VP 100 have been completed and the @ prompt is displayed, the remote connection may be terminateii The default escape sequence for a Hayes compatible modem is three + signs. Type the following: _ 1. Type +++ Wait approximately one secoti The modem responds with “OK” indicating the command mode has been entered. 2. Type ATH m Hangs up the modem and terminates the call. The modem is now ready 13 call another system. . l Using an External Modem The VP 100 may be connected to an external modem in place of a directly connected terminal to achieve greater speed than 1200 baud. The external modem must bc connected to the VP 100 via a normal RS-232C modem cable with pinouts as shown in Figure 4-4. The cable should be inserted into the DB-9 jack labelled “TERM 1:’ In addition, the external modem may hJve to be configured to properly handle the following. The modem should always be ready to answer a call, and should not depend upon the DTR signal from the VP 100. Failure to configure the modem in this way can result in the m&em never auto-ansuering calls. The modem should not assert the DCD signal into the VP 100 unless it is actually detezing carrier from the telephone line (or other DCE device). Failure to configure the modem ia this way can result in the VP 100 not detecting that a subsequent call has come in through ttc external modem. Toshiba VP Systems Release 6.1 Cs:+-cer 7992
4-16 Installation ard Maintenance Manual Although some modems have external switches to configure these options, most recently manufactured modems use “software sw?tches“ that can be changed by connecting a tsrrninal :’ into the modem through an RS-232C cable and [hen sending commands directly to the modem. _ Consult the user’s guide provided with the modem to determine thsmeans by which it may be configured. . Once the external modem is connected properly, use it to communicare with the VP 100 in the same way as if a directly-connected terminal is connected, except that the baHd rate may not be changed. w Ai external modem normally is not required, since the VP 100 contains an internal modem. . ._._ .-= Toshiba VP Systems E?.eESS 6.1 December. 1992
INSTALLATlOh f-17 4.6 VP 100 INSTALLATION ._ -. n Mounting the VP 100 _ . The L-P 100 is designed to be wall mounted. This optimizes air flow around and through the system, as well as making best use of floor and wall space in the switch room. .*- Ez For proper ventilation and to allow the plastic cover to swing open upwards, the \P 100 requires 14” horizontally and 32” vertically of wall space. The 32” vertical measurement shows enough space for the metal case to hang down when it is opened for system maintenance. The total spacing also allows for 6” on all four sides of the system u-hen the plastic cover is closed. - _ Use the template (enclosed with each unit) to transfer screw spacings to the wall. Four screws (or molly-bolts) are required to actually mount the VP 100 on the wall. These are not provided with the VP 100 as shipped. To mount the VP 100, follow these steps: 1. Locate the mounting template supplied with the VP 100. Position the template on the wall * and mark all four screti locations. 3 -. Remove the template and partially screw in the top two screws or molly-bolts (not supplied). 3. Remove the plastic cover and hang the VP 100 from the top two mounting screws. 1. Screw in the two lower mounting screws. 5. Tighten all four mounting screws. . The following i!lustration indicatks the mounting locations on the VP 100. Toshiba VP Svstems Release 6.1 C*Iamber. 1992
’ 4-18 InstallSion and Maintenance Manual . . _- .- Mounfing Locations Card Reset LEDs ______----------- \$?J 0 0 0 0) \____________------ Channel Status LEDs 01 03 05 07 0 (32 04 06 08 0 Locations Alarm LED Power LED Figure 4-4 The VP 100 Mounting Locations Toshiba VP Systems Release 6.1 December, 1992
INSTALLATION 4-19 1 n System Startup During the entire VP 100 physical installation process. it is highly rscommended that you . .c .,- observe the messages displayed by, the VP 100 during its startup process. To do this. use the CAT and log your session so it may be printed out later. or use an ASCII terminal equipped Lvith hardcopy printout. The previous section within this chapter, TERMINAL COMMUNICATION& describes how to connect an ASCII terminal to the VP 100. The rest of this section describes the manner in which the VP 100 starts up after input power is applied. Be sure to read and understand these two sections before powering up the system. - _ As a safety precaution, always make sure that the cover of the metal case is securely closed before powering up the system. The input power cable can then be safely plugged into the dedicated power source and the input power switch turned ON. After input power is applied, the VP 100 undergoes the following phases before the system software becomes fully operational: 0 Automatic baud rate detect. . Diagnostic tests. . -z > . 0 System software boot. . System initialization. Each of these phases are described in detail in the next few pages followed by an example of the full startup process. Automatic Baud Rate Detect The VP 100 can communicate with terminals at a variety of baud rates. Ruring the automatic baud rate detect phase, it automatically determines the terminal baud rate by looking at each of the available baud rates for an [ character. If the VP 100 does not detect an -1 character at any of the available baud rates, no messages are displayed during the entire startup process. . . The VP 100 starts performing automatic baud rate detect within a few seconds after input power is applied. During the automatic baud rate detect phase, the red alarm LED flashes ON and OFF at a slow rate. This phase lasts for approximately 16 seconds; then the red alarm LED is steady ON. (The alarm LED is visible in the upper right comer of the window in the plastic cover.) If the VP 100 detects an [F) character during this time. it adjusts to the terminal baud rate, and proceeds to the diagnostic tests phase. A startup message is displayed on the terminal. 3 Toshiba VP Systems Release 6.1 D*..errber. 1992
4-20 installation and Maintenance Manual _ If the VP 100 detects no (F( characters during this phse. messages are not displayed during the entire startup process: _ :: ) To get- t.he VP 100 to automatically adjust to the terminal baud rate : 1. Connect the RS-232C cable between your terminal and the \‘P 100. Be sure to insert the cable into the DB-9 jack labelled “TERM 1.” 2. Set the terminal baud rate to one of the following baud rates: 300,600,1200,2400,4800,9600, 19200, or 38400. 3. Turn ON power to the VP 100. - _ 4. Press the terminal F] key repeatedly at a fast rate until the VP 100 startup message is displayed. To be sure that the VP 100 does not miss detecting the (Enter] characters, it is recommended that the r-1 key is pressed at a rate of. at least, three times per second. *If the VP 100 does not seem to be detecting the )I characters, do the following: 0 Verify terminal cable wiring (Figure 4-4). / 0 Check that the terminal cable is securely plugged in at both ends. . Check the terminal setup. Refer to the Terminal Installation section in this chapter. . If everything appears to be setup properly and the startup message does not appear, turn the VP 100 OFF for several seconds and then back ON. Within a few seconds. the red alarm LED should fl-sh to indicate that the VP 100 is in the automatic’ baud rate detect phase. If the red alarm LED does not flash but stays on solid, or does not go on at all, the problem is with the VP 100. In this case, either the power supply or the Main Board must be replaced. First replace the power supply. If the problem persists, replace the Main Board. Diagnostic Tests After the automatic baud rate detect phase ends, the VP 100 kgins performing extensive diagnostic tests to verify that the hard\ are is working properly. These tests are designed to detect problemr with the processor, the system memory, the hard disk, and all of the related support circuitry located on the Main Board. The diagnostic test phase begins by displaying a startup mczczge: Toshiba VP Systems Release 5.1 December. 1992
INSTALLAT!X 4-21 DIAGXOSTIC (MWDDIYY) TESTING HARDW.‘&E... . If no err&s are derssted during the diagnostic test phase. the VP 100 displays the following message and then proceeds immediartly to the system software bcoot phase: l TEST COMPLETE If errors are detected, the VP 100 attempts to determine the Fobable cause of the error as being either the Main Board, the hard d&k, or the power supply. The VP 100 displays an error message and then resets itself, at which point the startup process begins all over again_ Refer to the MAINTENANCE chapter in this manual for complete procedures for replacing components in the VP 100. The error messages and the required actions are listed as follows. ‘ .) Table 4-3 BOOT ROM Diagnostic Error Message Error Message Required Action ERROR 1. PROBABLEC_%USE: MAIN BOARD Replace the Main Baud_ ERROR 2. PROBABLE C=\l_kSE: HARD DISK Replaced the Hard Disk_ ERROR 3. PROBABLEC?.CSE: DISKDATA Restore System S&Aware or restart the prcxedure that was aborted. . *** POWER FAIL *** Ignore if power w= mmed OFF. Otherwise. eplace the power supply. . . System Software Boot During the system software boot phase. the VP 100 loads the operating system software from the hard disk and then passe- ControI to the system software. The VP 100 begins this phase by di+aying the following message: BOOTLNG FROM I-L%RD DISK If no errors are detected during the system software boot phaZ1=. the VP 100 will have successfully booted itself, and will pass cor.rrol to the system software. Lvhich displays the following system heck: Toshtba VP Systems Release 6.1 c+::+-ow. 1992
4-22 lnstallarbn and N’intenance Manual * System Initialization . r ._ . . _ s - SYSTEM SOFTWARE RELEASE X.X.X.X (MMJDDNY) 7 :r DAY MMJDD HH:M&f:SS YYYY NAME ID:XXXXXX S/N:X.XXXXX PBX:XX :,$.:.‘/ , (MODEM ENABLED) LAST LOGON: MM/DD_ HH:MM 8.. * If errors are detected, the VP 100 attempts to demmine the probable cause of the error as being either the Main Board, the hard disk, or the power supply. The VP 100 displays an error message and then resets, at which point it begins the startup process all over again The error messages and the required actions are the same as those displayed from within the diagnostic test phase, as shown above. , Once the system software takes control of the VP 100, initialization begins. This includes making sure that the hard disk is ready for full system operation, reading in all of the system configuration tables, verifying that all of the mailboxes and messages are consistent with each other, and initializing the line ports. During the system initialization, the VP 100 displays messees as ’ follows: PREPARING DISK TO READ DATA DISK READY RUNNING DISK RECBUILD... DONE INITIALIZING PORTS... DONE After system initialization has completed, the VP 100 can begin accepting commands from the terminal. After the database is configured, the VP 100 can begin answering calls. If the VP 100 is unable to complete its initialization due to an unrecoverable error, it displays the following error message: FATAL ERROR DETECTED, SYSTEM INITIAL.IZATION SUSPENDED! At this point, list the Hardware Error Table to determine the cause of the fatal error. Refer to MAINTENANCE, Hardware Errors in this manual. tW There may be a considerable delay while the VP 100 ir running the DISK REBUILD program, which has the task of Lerifying the consistency of the mailboxes and messages, and also while it is initializing the line ports. Toshiba VP Systems Release 6.1 December. 1 t)92
INSTALLATION 4-23 n Full Startup Process, __ .- ._._ .-= The following provides an example of the full startup process. When the process is cbmplete, enter your password and then begin typing commands into the VP IQO. . Table 4-4 Full Startup Process Description Turn ON input power Messages displayed by the VP lOO,- Alarm LED turns ON Auot-baud-rate detect begins I Ah-m LED flashes Press IEnter repeatedly system detects baud rate Alarm LED stays on Diagnostic tests begin: A startup message is displayed: If OK, message is displayed: System software boot begins: .- .‘. _ s If OK, alarm relay closes, and system software takes over. Alar-m LED turns off System header is displayed: --- SYSTECMSOFlWARERELEASEA_XX_X @lM/DDlYY) --- DAYMMiDD HHMMSS YYYY NAME IDXXXX S/NXXXX PBXXi @tODEMENE.ULED) LASLOGON:MWDD HH&fM System prompt displayed, but the @PREPARING DISK TO READ DATA system has some more DISKREADY initialization to do: . RUNNINGDISKRELWILD...DONE System inititialization done: Il’iiG PORTS.. . DONE Press I] : I PASSWORD: . . Type password, press j7GG-l: I @ Toshiba VP Systems Release 6.1 December. 1992
4-24 Instalfar;cn and M&ntenance Manual SOFTWARE INSTALLATION .- .- System parameters and customer-provided information are entered into-system memory u-in: a -tuo-part configuration program. The INSTALL program is used to enter information for rev, installations. The UPDATE program is used for verification and to change the configumd~u database. This section is an overview of the configuration installation. Detailed directions for all the steps are in the Configururion manual. Using INSTALL Using INSTALL to Configure the Database After the operating system has been loaded and the system initialization has completed, the VP 100 is ready for you to enter the password_ Refer to MAINTENANCE, Miscellaneous Commands in this manual, on how to set passwords and the various password levels. After a valid pwword is entered, begin the INSTALL program. At the @ prompt type: When prompted by the colon, enter data as described in the Coqkpration manual - INSTALL, to define the database. To back up the data, refer to the PROCEDURES chapter in this nauual. Using UPDATE Entering UPDATE to Verify and Modify the Database After the system configuration is complete, the terminal again displays the @ prompt. To get a printout of the database, enter the UPDATE program. At the @ prompt type: . uP(l The terminal displays the dot (_) prompt. At the dot, type: L ALL Check the printout with the configuration forms and verify that the data is correct. If correct, to exit from the program, type: E If any of the data is incorrect, follow the instructions in the Conjig~~nrrion manual - UPDATE. When any changes are made in the configuration database. it is advisable to save the information to the hard disk oi the CAT. ../. . Toshiba VP Systems wease 6.1 !?ecember. 1992