    Have a look at the manual Mitel SX 200 DIGITAL Pabx Shipping, Receiving, And Installation Information Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 55 Mitel manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 618
    							Shipping, Receiving, and Installation Information
    PFT CABLE/
    MEFINAL TOOTHLOCKWASHERSGROUND WIRE
    /(CONNECTS TO
    CABINET GROUND
    STUD)
    I
    REAR CABLE
    PANEL 
    ASSEMBLV
    AOAPTEk PLATE
    (OPTIONAL)IPCM CABLES
    (BAYS 4.5.6.7),NTERdBlNETCABLE ASSEMBLV
    KA0683ElFigure 5-2 Installation of an Intercabinet Cable Assembly (672 port)
    Page 53 
    						
    							SECTION MITL9109-094-200-NACHART 5-8
    INSTALL AN ANALOG BAY 3 KIT INTO AN 
    SX-ZOO CABINET
    WARNING
    THESE INSTRUCTIONS MUST BE FOLLOWED EXPLICITLY SINCE THEY INVOLVE WORK WITH AND
    CHANGES TO THE PRIMARY POWER SUPPLY 
    TC THE UNIT.
    Only persons who have successfully completed a 
    MITEL Installation and Maintenance training
    course for the SX-200 DIGITAL PABX should perform this procedure.Step
    1.ActionUnpack kit and inspect contents for loose,
    damaged, or missing items.Comments
    2.Open Control cabinet doors, set power
    -switches to OFF, set main breaker on rear
    door to OFF, and remove line cord from wall
    outlet.
    3.Install the ground wire (between frame andBay 3 card file) to the frame.Refer to Figure 5-3.
    4.Remove rear door fan assembly
    - unplug fan supply cord, detach cord strain
    relief at stud
    - remove door ground wire at door stud
    - remove door
    - retain hardware
    5.Remove rear door
    - unplug AC distribution unit supply cord and
    unfasten cord strain relief
    - remove door ground wire at cabinet ground
    stud
    - loosen four screws securing rear door
    retaining bar
    - slide retaining bar up, releasing the rear
    door
    - replace lower right hand retaining barsecuring screw with 
    #lO x 7/8” screw from kit
    (to secure main power cable strain relief).
    6.Unpack the Interconnect and Power Fail
    Transfer (PFT) cards; inspect for loose,
    damaged, or missing items.The optional PFT card should be
    installed concurrently.
    7.Install the Interconnect card on the upper left
    side of the cabinet (from rear) with six sets
    (screws, lockwashers, and flat washers).
    8.If a PFT card is to be installed also, remove
    the eight securing screws from the front of
    the Control shelf and slide it forward.Page 54 
    						
    							Shipping, Receiving, and Installation InformationStepAction
    9.
    10.
    11.
    12.
    13.
    14.
    15.
    16.
    17.CHART 5-8 (CONT’D)
    INSTALL AN ANALOG BAY 3 KIT INTO AN SX-200 CABINET
    CommentsInstall the PFT card below the Interconnectcard with six sets (8-32 x 
    318” screws,
    lockwashers, flat washers).The PFT card is optional.
    Replace the Control shelf with its associated
    hardware.Be sure that the antistatic wrist
    strap is securely in its original
    location.
    Connect the wiring harness, 2nd
    D.C., (pn 103148501) between the
    Interconnect card and the PFT card.
    InterconnectColour
    PFT
    TB301-1BrownTB-3
    TB30 l-2
    BlueTB-5
    TB30 l-3
    ncTB30 l-4
    WhiteTB-6
    TB30 l-5
    RedTB-7
    TB30 l-6
    OrangeTB-4
    TB30 l-7
    YellowTB-2
    Install cutover monitor cable (pn 114905501)from P18 on Interconnect card to TB-7 on PFT
    card. Secure connector with a tie wrap.
    Connect ground strap (pn 105671501) from
    TB301-3 to Control shelf frame with 6-32 x
    5/16” screw, lockwasher and external tooth
    lockwasher.
    defer to Figure 5-4.
    Unpack shelf; check backplane and shelf for
    cracks, bent pins, loose or missing items, or
    other damage. Connect brown backplane wirenear 
    TBl to shelf frame with 6-32 x 3/8”
    screw, external tooth lockwasher, lockwasher,
    nut, if not already connected.
    Place shelf onto shelf guides and secure from
    Front with eight 
    lo-32 screws, lockwashers,
    and flat washers.
    Connect ground wire found attached to upper
    right corner of Control shelf frame to lower
    right corner of Peripheral shelf (Bay 
    3), using6-32 x 
    3/8” screw, external lock washer,
    lockwasher, and nut.
    Route the DC power cable (pn 114904501)
    within the cabinet. The cable is routed up from
    the power supply, across the top of the
    cabinet, and down to the terminal blocks on
    the backplane and interconnect card.
    Iefer to Figure 4-7 for cable
    ‘outing. Refer to Figure 5-5 for
    :able connections.
    Page 55 
    						
    							SECTION MITL9109-094-200-NACHART 5-8 (CONT’D)
    INSTALL AN ANALOG BAY 3 KIT INTO AN SX-200 CABINET
    StepActionComments
    18.Connect the DC power cable leads
    to the Bay 3 backplane, as follows:TBI-1 purple (-10 V)
    TBI-2 yellow (-5 V)
    TBI-3 brown (0 V)
    TBI-4 orange 
    (+8 V)
    TBI-5 nc
    TB2-1 nc
    TB2-2 gray (90 V)
    TB2-3 nc
    TB2-4 grn/yel (gnd to card file frame)
    TB2-5 blue (-48 V)
    19.Connect the DC power cable to the
    Interconnect card as follows:
    TB301-1 brown (0 V)
    TB301-2 blue (-48 V)
    TB301-3 braided gnd cable to Control shelf
    frame and green/yellow from cable
    TB301-4 nc
    TB301-5 nc
    TB301-6 orange (+8 V)
    TB301-7 yellow (-5 V)
    20.Route intershelf PCM Control cabinet cable
    into space between shelves; connect marked
    end to 
    J’l7A on the Control backplane.
    21.Install cables between Bay 3 and Interconnect
    card; 18 inch (pn 114909501) between P6 and
    P16, and 25 inch (pn 114910501) between P5
    and P17. Secure each cable with a cable tie
    and a connector screw.
    22.Install a surge clamp onto the Bay 3 backplaneat slot 16, pins 9 to 32; ensure that surge
    clamp is installed right side up (see label on
    clamp).
    23.Install cables between Bay 3 and distribution
    frame.
    24.Unpack rear door power supply assembly;If damaged or wrong type, repack
    inspect for physical damage, and correct type.in original container and return
    with completed Damage Report.Page 56 
    						
    							Shipping, Receiving, and installation Information
    CHART 5-8 (CONT’D)
    INSTALL AN ANALOG BAY 3 KIT INTO AN SX-200 CABINET
    StepAction
    Comments
    25.Place rear door power supply onto shim
    washer and lower door support and lock into
    closed position (this will hold the rear door
    power supply while installing upper support).
    26.Install upper support over power supply hingepin and secure to cabinet with 4 sets (IO-32
    screw, lockwasher).
    27.Connect ground lead to cabinet ground stud
    using hardware from original door.
    28.Plug AC distribution unit assembly supply cord
    into the power supply outlet. Attach cable
    strain relief to power supply door by removing
    power supply cover screw and replacing itwith an 8-32 x 
    5/8” long screw which also
    secures the cable strain relief.
    29.Connect the DC power cable connector to the
    power supply. Attach power cable strain relief
    by removing a power supply cover hold downscrew and replacing it with an 8-32 x 
    5/8”
    screw to fasten cable strain relief to cover.
    30.
    31.
    32.
    33.
    Install rear door fan assembly and two nuts on
    hinge bracket.
    Attach door ground wire to door ground stud;
    use previously removed hardware.
    Plug fan power supply cord into connector on
    fan door and attach cord strain relief to stud
    on fan door; use previously removed hardware.
    Put on the antistatic wrist strap.Always wear the antistatic wrist
    strap when handling printed circuit
    cards.
    34.
    35.Unpack each printed circuit card and insert it
    into its assigned slot.
    Connect PCM cable previously routed between
    the shelves to connector J2 on the front ofthe Digital Interface Card at Bay 3, Slot 18.
    36.Power up PABX and reprogram using
    Customer Data Entry.
    Page 57 
    						
    							SECTION MITL9109-094-200-NACHART 5-9
    INSTALL AN ANALOG BAY 3 KIT INTO AN SX-200 UNIVERSAL CABINET
    WARNING
    THESE INSTRUCTIONS MUST BE FOLLOWED EXPLICITLY SINCE THEY INVOLVE WORK WITH AND
    CHANGES TO THE PRIMARY POWER SUPPLY OF THE UNIT.
    Only persons who have successfully completed a MITEL Installation and Maintenance training
    course for the SX-200 DIGITAL PABX should perform this procedure.Step
    1.ActionUnpack kit contents and inspect for loose,
    damaged, or missing items. Refer to parts list.Comments
    2.Open Control cabinet doors, set BPS switches
    to OFF, set main breaker on rear door to OFF,
    and remove line cord from wall outlet.
    3.Install ground wire (between frame and Bay 3Refer to Figure 5-3.
    card file) to frame (note: the card file has not
    been installed yet), therefore connect only
    frame end now).
    4.
    5.Install Interconnect card with five screwsTop right mounting hole goes to(IO-32 x 
    l/2) on the upper left side of thesixth hole from top of center side
    cabinet (viewed from rear).
    rail.
    Install shelf rails l/2 inch above Control shelf,Screws into third hole above
    and secure to cabinet vertical frame usingControl shelf, with horizontalIO-32 x 
    l/2 screws (shorter brackets - 13support below, pointing inward.
    inches long).
    6.
    7.Unpack shelf; check backplane and shelf for
    cracks, bent pins, loose or missing items, or
    other damage.
    Place shelf onto shelf rails and secure to frontframe with eight 
    IO-32 screws.
    8.Connect ground wires from frames and fromRefer to Figure 5-3 and Figure 5-4
    backplane (brown wire near 
    TBI, grn/yel wirefor installation details.from 
    TB2-4) to card file side panel. Use a 6-32
    screw, external tooth washer, lockwasher and
    nut.
    9.
    Install power supply control panel above shelf
    and route leads from switch and LED to rear
    of cabinet.
    10.At rear of cabinet, unplug AC wiring from
    door, fan assembly, and remove ground strap
    from frame stud; retain hardware. Remove
    door.
    11.Connect braided wire (120832501) from upperRefer to Figure 5-4.
    side panel to Interconnect card 
    (TB301-3).Page 58 
    						
    							Shipping, Receiving, and installation Information
    CHART 5-g (CONT’D)
    INSTALL AN ANALOG BAY 3 KIT INTO AN SX-200 UNIVERSAL CABINET
    StepAction
    Comments
    12.Route the DC power cable (pn 114904501)Refer to Figure 4-7 and Figure
    within the cabinet. The cable is routed up from 5-5.
    the power supply, across the top of the
    cabinet, and down to the terminal blocks on
    ’the backplane and Interconnect card.
    13.Connect the DC power cable leads to
    the Bay 3 backplane, as follows:
    TBI-1 purple (-10 V)
    TBI-2 yellow (-5 V)
    TBl-3 brown (0 V)
    TBl-4 orange (+8 V)
    TBl-5 nc
    TB2-1 nc
    TB2-2 gray (90 V)
    TB2-3 nc
    TB2-4 grn/yel (gnd to card file frame)
    TB2-5 blue (-48 V)
    14.Connect the DC power cable to the
    Interconnect card as follows:
    TB301-1 brown (0 V)
    TB301-2 blue (-48 V)
    TB301-3 braided gnd cable to Control shelf
    frame and green/yellow wire from
    cable.
    TB301-4 nc
    TB301-5 nc
    TB30’l-6 orange (+8 V)
    TB301-7 yellow (-5 V)
    15.Connect leads from switch and LED on power
    supply control panel to mating connector on
    main DC harness; connect OOT cable
    connector to 
    P303 on Interconnect card.
    16.Route intershelf PCM Control cabinet cable
    into space between shelves; connect marked
    end to 
    J17A on the Control backplane; the
    cable should point downwards from the
    connector.
    17.Install cables between Bay 3 and Interconnect
    card; 18 inch (pn 114909501) between P6 and
    P16, and 25 inch (pn 114910501) between P5
    and P17. Secure each cable with a cable tie
    and a connector screw.
    Page 
    59 
    						
    							CHART 5-9 (CONT’D)INSTALL AN ANALOG BAY 3 KIT INTO AN SX-ZOO UNIVERSAL CABINET
    StepActionComments
    18.install a surge clamp onto the Bay 3 backplaneat slot 16, pins 9 to 32; ensure that surge
    clamp is installed right side up (see label on
    clamp).
    19.Install cables between Bay 3 and distribution
    frame.
    20.Remove six screws that hold the rear cableRefer to Figure 5-6.
    panel to cabinet; install lower door supportonto cabinet and secure with IO-32 screws in
    eleventh hole from bottom, with the bracket
    above screw pointing out.
    21.
    22.Replace rear cable panel onto cabinet.
    Unpack rear door power supply assembly;
    ,If damaged or wrong type, repack
    inspect for physical damage, and correct type.in original container and return
    with completed Damage Report.
    23.Place rear door power supply onto lower door
    support, using shim washer, and lock door into
    closed position (this will hold the rear door
    power supply while installing upper support).
    24.Install upper support and shim washer overRefer to Figure 5-7.
    power supply hinge pin and secure to cabinetwith 
    lo-32 screws.
    25.Open rear door and install blanking plate to
    cover openings in left side frame, and fasten
    with screw, lockwasher, and nut. Remove
    hinges from right side of frame.
    26.Connect ground lead from rear door power
    supply to frame ground stud using existing
    hardware.
    27.Plug AC distribution unit assembly supply cord
    into the power supply outlet. Attach cable
    strain relief to power supply door by removing
    power supply cover screw and replacing itwith an 8-32 x 
    5/8” long screw which also
    secures the cable strain relief. Secure AC
    cable to frame of cabinet near center of power
    supply.
    28.Connect the DC power cable connector to the
    power supply. Attach power cable strain relief
    by removing a power supply cover hold downscrew and replacing it with an 8-32 x 
    5/8”
    screw to fasten cable strain relief to cover.
    Page 60 
    						
    							Shipping, Receiving, and Installation InformationStepActionIComments
    29.
    30.
    31.
    32.Remove the old hinge brackets for the rear
    door from the cabinet frame.
    33.Put on the antistatic wrist strap.
    34.
    35.
    36.
    StepAction
    1.
    2.
    3.
    4.
    5.
    6.CHART 5-9 (CONT’D)
    INSTALL AN ANALOG BAY 3 KIT INTO AN 
    SX-200 UNIVERSAL CABINET
    CAUTION: This upgrade and installation procedure is to be performed only by qualified 
    per-
    Install rear door fan assembly and tighten two
    nuts on hinge bracket.
    Attach door ground wire from door groundstud to frame using IO-32 screw and external
    tooth lockwasher.
    Plug fan power supply cord into connector on
    fan door and attach cord strain relief to stud
    on fan door.Always wear the antistatic wrist
    strap when handling printed circuit
    cards.
    Unpack each printed circuit card and insert it
    into its assigned slot.
    Connect PCM cable previously routed between
    the shelves to connector J2 on the front ofthe Digital Interface Card at Bay 3, slot 18.
    Power up PABX and reprogram usingCustomer Data 
    Entrv.CHART 5-10
    INSTALL DIGITAL PERIPHERAL BAY
    sonnel who have successfully completed a 
    MITEL Installation and Maintenance
    Course for the SX-200 DIGITAL PABX.
    INSTALL DIGITAL BAY AND SHELFS
    Unpack and inspect contents of kit.Power down system.
    Open front door and slide digital peripheral shelf onto top of existing shelf, and fastento front rails with eight 
    lo-32 x 0.5 in. screws, as shown in Figure 5-8.
    Install filler plate above shelf, and fasten to front rails with two 
    lo-32 x 0.5 in.
    screws, as shown in Figure 5-8.At front of cabinet, attach antistatic wrist strap to your wrist, and install Bay Power
    SUPPlY.
    Open rear door, and connect ground wires from new shelf as shown in Figure 5-9.Use 
    lo-32 x 0.5 in. screw and external tooth lock washer to connect to side frame.
    Refer to Figure 5-10 and Figure 5-12 for details of ground connections. A 336 port
    peripheral shelf is shown; however, 672 port peripheral shelves are the same.
    Page 61 
    						
    							SECTION MITLSI 09-094-200-NA, 
    GREEN,
    MOUNTINGrSCREWS1
    KAll014ElRFigure 5-3 
    Cardfile to Frame and Backplane Ground Connections
    Page 62 
    						
    All Mitel manuals Comments (0)

    Related Manuals for Mitel SX 200 DIGITAL Pabx Shipping, Receiving, And Installation Information Manual