NEC Neax 2000 Ivs2 Ccis System Manual
Have a look at the manual NEC Neax 2000 Ivs2 Ccis System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
NEAX2000 IVS2 CCIS System ManualPage 68 ND-70918 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation Procedure Figure 2-5 shows LTC connectors with corresponding AP slots and DTI pin assignment for each AP slot. Figure 2-5 Location of the AP Slots and the LTC Connectors for DTI LT C 0LT C 1LT C 2LT C 3 VM LT00/AP00 LT01/AP01 LT02/AP02 LT03/AP03 LT04/AP04 LT05/AP05 LT06/AP06 LT07/AP07 LT08/AP08 LT09/AP09 LT10/AP10 LT11/AP11/FP11 MP12/FP12 PFT LT00/AP00 LT01/AP01 LT02/AP02 26 RB 27 TB 28 29 30 31 32 33 34 RB 35 TB 36 37 38 39 40 41 42 RB 43 TB 44 45 46 47 48 49 50 1RA 2TA 3 4 5 6 7 8 9RA 10 TA 11 12 13 14 15 16 17 RA 18 TA 19 20 21 22 23 24 25LT C 0 LT03/AP03 LT04/AP04 LT05/AP05 26 RB 27 TB 28 29 30 31 32 33 34 RB 35 TB 36 37 38 39 40 41 42 RB 43 TB 44 45 46 47 48 49 50 1RA 2TA 3 4 5 6 7 8 9RA 10 TA 11 12 13 14 15 16 17 RA 18 TA 19 20 21 22 23 24 25LT C 1 LT06/AP06 LT07/AP07 LT08/AP08 26 RB 27 TB 28 29 30 31 32 33 34 RB 35 TB 36 37 38 39 40 41 42 RB 43 TB 44 45 46 47 48 49 50 1RA 2TA 3 4 5 6 7 8 9RA 10 TA 11 12 13 14 15 16 17 RA 18 TA 19 20 21 22 23 24 25LT C 2 LT 0 9 / A P 0 9 LT 1 0 / A P 1 0 LT 1 1 / A P 1 1 26 RB 27 TB 28 29 30 31 32 33 34 RB 35 TB 36 37 38 39 40 41 42 RB 43 TB 44 45 46 47 48 49 50 1RA 2TA 3 4 5 6 7 8 9RA 10 TA 11 12 13 14 15 16 17 RA 18 TA 19 20 21 22 23 24 25LT C 3
CHAPTER 2 INSTALLATION Installation Procedure NEAX2000 IVS2 CCIS System Manual ND-70918 (E), Issue 1.0 Page 69 Figure 2-6 shows an example of the cable connection when the DTI card is mounted in the AP05 slot of PIM0. Figure 2-6 Example of Cable Connection via MDF 17 18 19 20RA TA42 43 44 45RB TB LT C 1 ( J )42 43 44 45RB TB17 18 19 20RA TA LT C 1 ( P ) PIM 0 JP MDF DTI AP05 RA RB TA TB17 42 18 4317 42 18 43RA RB TA TBTO CS U LT C 1 RECEIVE TRANSFER
NEAX2000 IVS2 CCIS System ManualPage 70 ND-70918 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation Procedure Cable Connection via CONN Card When using a coaxial cable, connect the cable to a CSU via the CONN (PZ-M542/PZ-M557) card as shown in Figure 2-7. Figure 2-7 DTI Cable Connection via CONN Card CSU LTC0/LTC1/LTC2/LTC3 CONNECTORCOAXIAL CABLE 30-DTI BWBPBX MAX. 6 dB loss at 1024 kHz CONN (PZ-M542/PZ-M557)
CHAPTER 2 INSTALLATION Installation Procedure NEAX2000 IVS2 CCIS System Manual ND-70918 (E), Issue 1.0 Page 71 Figure 2-8 shows an example of the cable connection when the 30-DTI card is mounted in the AP05 slot of PIM0. Figure 2-8 Example of Cable Connection via the CONN Card COAXIAL CONNECTOR LTC1 CONNECTOR 17 18 19 20RA TA42 43 44 45RB TB LT C 1 ( J )42 43 44 45RB TB17 18 19 20RA TA LT C 1 ( P ) 12 PIM 0 JPCONN CARD DTI AP05 RA RB TA TB17 42 18 4317 42 18 43TO C SU LT C 1 RECEIVE RCV SEND TRS 12
NEAX2000 IVS2 CCIS System ManualPage 72 ND-70918 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation Procedure Optical Cable Connection When you use an optical cable for DTI, connect the cable each other to the CN1 connector of the M10 (PN-M10) cards. M10 card and DTI cards are connected via MDF through LTC connector on the BWB. Figure 2-9 and Figure 2-10 show the outline of connection and example of M10 MDF cross connection. Figure 2-9 Outline of Optical Cable Connection MDF OPTICAL CABLE CN1 MAX. 10 km (6.2 miles) 24DTI/ 30DTI 24DTI/ 30DTI M10 MDF 24DTI/ 30DTI 24DTI/ 30DTI M10 CN1
CHAPTER 2 INSTALLATION Installation Procedure NEAX2000 IVS2 CCIS System Manual ND-70918 (E), Issue 1.0 Page 73 Figure 2-10 Example of MDF Cross Connection for M10 Card (1 of 2) PIM 0 JP MDF DTI AP09 [LT09] RA 1 1 RA RB 26 26 RB TA 2 2 TA TB 27 27 TB LT C 3 RECEIVE TRANSFER 1 JP DTI AP10 [LT10] RA 9 9 RA RB 34 34 RB TA 10 10 TA TB 35 35 TB LT C 3 RECEIVE TRANSFER 2 JP M10 No. 1 AP05 [LT05] RA 19 19 RA RB 44 44 RB TA 20 20 TA TB 45 45 TB LT C 1 TO OPPOSITE M10 CARD CN1RECEIVE TRANSFER 3 RA 17 17 RA RB 42 42 RB TA 18 18 TA TB 43 43 TBRECEIVE TRANSFER No. 0
NEAX2000 IVS2 CCIS System ManualPage 74 ND-70918 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation Procedure Figure 2-10 Example of MDF Cross Connection for M10 Card (2 of 2) 1 2 3 4RA TA26 27 28 29RB TB LT C ( J )26 27 28 29RB TB1 2 3 4RA TA (P) 1 LTC3 CONNECTOR 9 10 11 12RA TA34 35 36 37RB TB LT C ( J )34 35 36 37RB TB9 10 11 12RA TA (P) 2 LTC3 CONNECTOR 17 18 19 20RA TA42 43 44 45RB TB LT C ( J )42 43 44 45RB TB17 18 19 20RA TA (P) 3 LTC1 CONNECTOR
CHAPTER 2 INSTALLATION Installation Procedure NEAX2000 IVS2 CCIS System Manual ND-70918 (E), Issue 1.0 Page 75 No. 7 CCIS with Analog Interface Perform necessary installation works of the equipment according to the procedure shown in Figure 2-11. Figure 2-11 Installation Procedure for No. 7 CCIS with Analog Interface START MOUNTING CCH CARD MOUNTING EXPMEM CARD MOUNTING LDT/ODT CARD MOUNTING AP00 CARD Page 61 Page 76 Page 62 Page 63 END CABLE CONNECTION AT CCH AND MODEMThis procedure is required when expanding the capacity of call This procedure is required when providing Centralized Billing. NOTE information store memory. Page 77 NOTE:This procedure is not required when using Built-in SMDR of MP card in Local Office.
NEAX2000 IVS2 CCIS System ManualPage 76 ND-70918 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation Procedure Mounting LDT/ODT Card Mount the LDT (PN-2LDTA) and ODT (PN-2ODTA/PN-2ODTB) cards in LT slots. AT T E N T I O NContents Static Sensitive Handling Precautions Required
CHAPTER 2 INSTALLATION Installation Procedure NEAX2000 IVS2 CCIS System Manual ND-70918 (E), Issue 1.0 Page 77 Cable Connection at CCH and MODEM When providing the Common Signaling Data Link via MODEM: (1) Connect the RS NORM-4 CA-A/RS NORM-4S CA-A to the CCH card and the MODEM (PBX side) as shown in Figure 2-12. Figure 2-12 Cabling of RS NORM-4 CA-A/RS NORM-4S CA-A (for Common Signaling Data Link via MODEM) (2) Connect the LINE cable between the MODEM (PBX side) and MODEM (Distant PBX side) as shown in Figure 2-13. Figure 2-13 Cabling of LINE Cable (for Common Signaling Data Link via MODEM) RSMODEMMODEM 2P 2P RS NORM-4 CA-A/RS NORM-4S CA-A (4 m/13.1 ft.) CCH PBX SIDEDISTANT PBX SIDE PSTNPSTN: Public Switched Telephone Network DISTANT PBX SIDE DTELINEDTE PSTN:LINEPSTNMODEM MODEM PBX SIDE Public Switched Telephone Network LINE CABLE