Cisco 6500e Manual
Have a look at the manual Cisco 6500e Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 53 Cisco manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
1-49 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Generic Installation Procedures Figure 1-25 Installing the Shelf Brackets Figure 1-26 Attaching the Crossbar Bracket to the Shelf Brackets H9466 Shelf bracket Shelf bracket 12-24 x 3/4-inch or 10-32 x 3/4-inch screw (6x) 48123 Shelf bracket Shelf bracket M3 screw M3 screw Crossbar bracketFront of rack
1-50 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Generic Installation Procedures Installing the Rubber Feet Kit This section describes how to install the rubber feet kit. The kit contains four rubber feet and mounting screws. The rubber feet attach directly to the bottom of the chassis and support the weight of the chassis. The rubber feet kit is shipped as part of the Catalyst 6500 series switch accessory kit with the following chassis: Catalyst 6506-E Catalyst 6509-E To install the rubber feet kit, perform the following steps: Step 1Tilt the chassis to one side to access the bottom of the chassis. Step 2Position one of the rubber feet over the threaded hole on the bottom corner of the chassis. Step 3Secure the rubber foot to the chassis with one of the M5 x 12 mm Phillips screws provided in the installation kit. Step 4Repeat step 1 through step 3 to install the remaining three rubber feet in the bottom corners of the chassis. Step 5Position the chassis upright so that it rests on the four rubber feet. Installing the Stabilizer Bracket Kit The stabilizer bracket kit is included as part of the accessory kits for the following chassis: Catalyst 6509-NEB switch Catalyst 6513 switch and Catalyst 6513-E switch If you are not installing the Catalyst 6509-NEB, Catalyst 6513, or Catalyst 6513-E switch in a rack, you must install stabilizer brackets to the bottom of the chassis. The stabilizer brackets reduce the possibility that the freestanding switch chassis will tip over. Ta b l e 1 - 4 lists and describes the contents of the rack-mount shelf kit. NoteYou will need the assistance of a second person to perform this installation. Table 1-4 Stabilizer Kit Contents Quantity Part Description 16 M4 Phillips-head countersunk screws used to secure the stabilizer brackets to the chassis 2 Stabilizer brackets
1-51 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Generic Installation Procedures To install the stabilizer brackets, follow these steps: Step 1Have one person tilt and hold the chassis to one side. Step 2With the chassis slightly tilted, attach the stabilizer bracket to the side of the chassis with the eight M4 screws, as shown in Figure 1-27. Step 3Tilt the chassis to the other side. Step 4Attach the second stabilizer bracket to the other side of the chassis with eight M4 screws. Step 5Lower the chassis so that it rests on both stabilizer brackets. Figure 1-27 Installing the Stabilizer Brackets NoteIf you are not rack-mounting the Catalyst 6513 or the Catalyst 6513-E switch chassis and you want to install the optional cable guide assemblies, you must obtain ten 12-24 or 10-32 nuts. Use the screws supplied in the accessory kit and the nuts you obtained to attach the cable guide assembly to the L bracket. FA N STATUS 8 PORT GIGABIT ETHERNETWS-X64081LIN KSTATUS2 34 5 6 7 8L IN KL IN KLIN KLIN KLIN KLIN KL IN K8 PORT GIGABIT ETHERNETWS-X64081L IN KSTATUS2 34 5 6 7 8LIN KLIN KLIN KL IN KL IN KLIN KL IN K8 PORT GIGABIT ETHERNETWS-X64081L IN KSTATUS2 34 5 6 7 8LIN KL IN KLIN KL IN KL IN KL IN KL IN K 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK1 0LINK1 1LINK1 2LINK1 3LINK1 4LINK1 5LINK1 6LINK1 7LINK1 8LINK1 9LINK2 0LINK2 1LINK2 2LINK2 3LINK2 4LINK1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K1 0L I N K1 1L I N K1 2L I N K1 3L I N K1 4L I N K1 5L I N K1 6L I N K1 7L I N K1 8L I N K1 9L I N K2 0L I N K2 1L I N K2 2L I N K2 3L I N K2 4L I N K1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K10L I N K11L I N K12L I N K13L I N K14L I N K15L I N K16L I N K17L I N K18L I N K19L I N K20L I N K21L I N K22L I N K23L I N K24L IN K1L I N K2L I N K3L I N K4L I N K5L IN K6L IN K7L I N K8L I N K9L I N K1 0L I N K1 1L I N K1 2L I N K1 3L I N K1 4L I N K1 5L I N K1 6L I N K1 7L IN K1 8L IN K1 9L I N K2 0L IN K2 1L I N K2 2L I N K2 3L I N K2 4L IN K SUPERVISOR2 WS-X6K-SUP2-2GESTATUSSYSTEMCONSOLEPWR MGMTRESETCONSOLECONSOLE PORT MODEPCMCIAEJECTPORT 1PORT 2Switch Load 100% 1%LINK LINKSUPERVISOR2 WS-X6K-SUP2-2GESTATUSSYSTEMCONSOLEPWR MGMTRESETCONSOLECONSOLE PORT MODEPCMCIAEJECTPORT 1PORT 2Switch Load 100% 1%LINK LINK 1 2 3 4 5 6 7 8 9 10 11 12 13 48126
1-52 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Establishing the System Ground This section describes how to connect a system ground to the Catalyst 6500 series switches. NoteThis system ground is also referred to as the network equipment building system (NEBS) ground. CautionInstallations that rely solely on system grounding using only an AC third-prong ground run a substantially greater risk of equipment problems and data corruption than those installations that use both the AC third-prong ground and a properly installed system (NEBS compliant) ground. The system (NEBS) ground provides additional grounding for EMI shielding requirements and grounding for the low voltage supplies (DC-DC converters) on the modules and is intended to satisfy the Telcordia Technologies NEBS requirements for supplemental bonding and grounding connections. You must observe the following system grounding guidelines for your chassis: You must install the system (NEBS) ground connection with any other rack or system power ground connections that you make. The system (NEBS) ground connection is required if FXS modules are installed or if this equipment is installed in a U.S. or European Central Office. You must connect both the system (NEBS) ground connection and the power supply ground connection to an earth ground. The system (NEBS) ground connection is required if FXS modules are installed or if this equipment is installed in a U.S. or European Central Office. For Catalyst 6503 or Catalyst 6503-E chassis that are equipped with DC-input power supplies, you must install the system (NEBS) ground before you attach the source DC power cables to the DC PEM. If the Catalyst 6503 or Catalyst 6503-E chassis is powered up, you must power down the chassis before attaching the system (NEBS) ground. If you are installing the system (NEBS) ground on other models of the Catalyst 6500 series chassis that are equipped with either AC-input or DC-input power supplies, you do not need to power down the chassis. If you are installing the 8700 W AC-input power supply on a Catalyst 6506, Catalyst 6509, or on a Catalyst 6509-NEB chassis, you must install the system ground (NEBS ground) on the power supply rather than on the switch chassis. The extended depth of the 8700 W power supply blocks access to the system ground pad on those chassis. There are two ground posts located on the power supply faceplate where the system ground connection can be made. NoteIn all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC) requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack ground or directly to the common bonding network (CBN). The equipment rack should also be connected to the CBN with 6 AWG grounding wire. NoteThe system (NEBS) ground serves as the primary safety ground for the Catalyst 6503 and Catalyst 6503-E chassis that are equipped with DC-input power supplies. The DC-input power supplies for these chassis do not have a separate ground.
1-53 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Required Tools and Equipment To connect the system ground, you need the following tools and materials: Grounding lug—A two-hole standard barrel lug. Supports up to 6 AWG wire. Supplied as part of accessory kit. Grounding screws—Two M4 x 8 mm (metric) pan-head screws. Supplied as part of the accessory kit. Grounding wire—Not supplied as part of accessory kit. The grounding wire should be sized according to local and national installation requirements. Depending on the power supply and system, a 12 AWG to 6 AWG copper conductor is required for U.S. installations. Commercially available 6 AWG wire is recommended. The length of the grounding wire depends on the proximity of the switch to proper grounding facilities. No. 1 Phillips screwdriver. Crimping tool to crimp the grounding wire to the grounding lug. Wire-stripping tool to remove the insulation from the grounding wire. Connecting the System Ground To attach the grounding lug and cable to the grounding pad, follow these steps: Step 1Use a wire-stripping tool to remove approximately 0.75 inch (19 mm) of the covering from the end of the grounding wire. Step 2Insert the stripped end of the grounding wire into the open end of the grounding lug. Step 3Crimp the grounding wire in the barrel of the grounding lug. Verify that the ground wire is securely attached to the ground lug. Step 4Locate and remove the adhesive label from the system grounding pad on the switch. The location of the system grounding pad differs among Catalyst 6500 series chassis. Refer to these figures to locate the system grounding pad on your chassis: Catalyst 6503 and Catalyst 6503-E chassis—Figure 1-28 CautionThe system (NEBS) ground serves as the primary safety ground for the Catalyst 6503 and Catalyst 6503-E chassis that are equipped with DC-input power supplies. You must install the system (NEBS) ground before you attach the source DC power cables to the DC PEM. If the Catalyst 6503 or Catalyst 6503-E chassis are already powered up, we recommend that you remove the source DC from the Catalyst 6503 and Catalyst 6503-E chassis before attaching the system (NEBS) ground. Catalyst 6504-E chassis—Figure 1-29 Catalyst 6506, Catalyst 6509, and Catalyst 6509-NEB chassis—Figure 1-30 Catalyst 6506-E, Catalyst 6509-E, Catalyst 6513, and Catalyst 6513-E chassis—Figure 1-31 Catalyst 6509-NEB-A and Catalyst 6509-V-E chassis—Figure 1-32
1-54 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Step 5Place the grounding wire lug against the grounding pad, making sure that there is solid metal-to-metal contact. NoteThere are two system grounding pads on the Catalyst 6509-NEB-A and the Catalyst 6509-V-E switch chassis. One pad is located in the upper-left corner of the chassis, and the other is located in the upper-right corner of the chassis. Additionally, both system grounding pads have 3 M4 screw holes so that the system grounding lug can be installed either horizontally or vertically. Step 6Secure the grounding lug to the chassis with two M4 screws. Ensure that the grounding lug and the grounding wire will not interfere with other switch hardware or rack equipment. Step 7Prepare the other end of the grounding wire, and connect it to an appropriate grounding point in your site to ensure adequate earth ground for the switch. Figure 1-28 System Ground Location (Catalyst 6503 and Catalyst 6503-E Chassis) SUPERVISOR2 WS-X6K-SUP2-2GESTATUSSYSTEMCONSOLEPWR MGMTRESETC O N S O LEC O N S O LE P O R T M O D EP C M C IAE JE C TP O R T 1P O R T 2S w itch Loa d 10 0% 1% LINK LINKO S M -4 O C 1 2 P O S -S I 4 P O R T O C -1 2 P O S S M IRS T A T U S 1 1 2 23 3 4 4R E S E T L I N K L I N KL I N K L I N K C A R R I E R A L A R M C A R R I E R A L A R M C A R R I E R A L A R M C A R R I E R A L A R M A C T I V E T X R X T X P O R T 1 R X A C T I V E T X R X T X P O R T 2 R XA C T I V E T X R X T X P O R T 3 R XA C T I V E T X R X T X P O R T 4 R X O S M - 4 O C 1 2 P O S -S I 4 P O R T O C - 1 2 P O S S M IR S T A T U S 1 1 2 23 3 4 4R E S E T L I N K L I N KL IN K L I N K C A R R I E R A L A R M C A R R I E R A L A R M C A R R I E R A L A R M C A R R I E R A L A R M A C T I V E T X R X T X P O R T 1 R X A C T I V E T X R X T X P O R T 2 R XA C T I V E T X R X T X P O R T 3 R XA C T I V E T X R X T X P O R T 4 R X 63190 System ground connector System ground connector Grounding lug Wire
1-55 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Figure 1-29 System Ground Location (Catalyst 6504-E Chassis) 130891 STATUS FA N STATUS STATUS STATUS System ground connectorSystem ground connector Grounding lugWire
1-56 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Figure 1-30 System Ground Location (Catalyst 6506, Catalyst 6509, and Catalyst 6509-NEB Chassis) 32672INPUT OKFA N OKOUTPUT FA I L o INPUT OKFA N OKOUTPUT FA I L o 1 2 3 4 5 6 8 P O R T G I G A B IT E T H E R N E TWS-X64081LINKSTATUS2 3 4 56 7 8LINKLINKLINKLINKLINKLINKLINK8 P O R T G IG A B IT E T H E R N E TWS-X64081LINKSTATUS2 3 4 5 6 7 8LINKLINKLINKLINKLINKLINKLINK24 PORT 100FXW S -X 62 24STATUS1LIN K2LINK3LIN K4LINK5LIN K6LINK7LINK8LIN K9LIN K10LIN K11LIN K12LIN K13LIN K14LIN K15LIN K16LIN K17LIN K18LIN K19LIN K20LINK21LINK22LIN K23L IN K24LIN K24 PORT 100FXW S - X 6 2 2 4S T A T U S1LIN K2LIN K3L INK4L IN K5LIN K6LIN K7LIN K8L IN K9LIN K10L IN K11LINK12LIN K13L IN K14LIN K15LIN K16LIN K17L INK18LINK19L IN K20LINK21LIN K22LINK23LIN K24L IN K Grounding pad Grounding pad location under lip Grounding lug Wire Screws (M4) FA N STATUS S U P E R V IS O R 2 W S -X 6 K -S U P 2 -2 G ES T A T U SS Y S T E MC O N S O L EP W R M G M TR E S E TC O N S O L EC O N S O L E P O R T M O D EP C M C I AE J E C TP O R T 1P O R T 2S w i t c h L o a d 1 0 0 % 1 % LINK LINKS U P E R V IS O R 2 W S -X 6K -S U P 2-2G ES T A T U SS Y S T E MC O N S O L EP W R M G M TR E S E TC O N S O L EC O N S O L E P O R T M O D EP C M C IAE J E C TP O R T 1P O R T 2S w i t c h L o a d 1 0 0 % 1 % LINK LINK
1-57 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Figure 1-31 System Ground Location (Catalyst 6506-E, Catalyst 6509-E, Catalyst 6513, and Catalyst 6513-E Chassis) FA N STATUS 8 PORT GIGABIT ETHERNETWS-X64081LINKSTATUS2 3 4 5 6 7 8LIN KLIN KL IN KL IN KLIN KLIN KLIN K8 PORT GIGA BIT ETHERNETWS-X64081LIN KSTATUS2 3 4 56 7 8LIN KL INKL IN KLIN KLIN KLIN KL IN K8 PORT GIGABIT ETHERNETWS-X64081L IN KSTATUS2 34 5 6 7 8LINKLINKLIN KLIN KL IN KLIN KLIN K 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK1 0LINK1 1LINK1 2LINK1 3LINK1 4LINK1 5LINK1 6LINK1 7LINK1 8LINK1 9LINK2 0LINK2 1LINK2 2LINK2 3LINK2 4LINK1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K1 0L I N K1 1L I N K1 2L I N K1 3L I N K1 4L I N K1 5L I N K1 6L I N K1 7L I N K1 8L I N K1 9L I N K2 0L I N K2 1L I N K2 2L I N K2 3L I N K2 4L I N K1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K10L I N K11L I N K12L I N K13L I N K14L I N K15L I N K16L I N K17L I N K18L I N K19L I N K20L I N K21L I N K22L I N K23L I N K24L I N K1L I N K2L I N K3L IN K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K1 0L I N K1 1L I N K1 2L I N K1 3L I N K1 4L IN K1 5L I N K1 6L I N K1 7L IN K1 8L I N K1 9L I N K2 0L I N K2 1L I N K2 2L I N K2 3L I N K2 4L I N K SUPERVISOR2 WS-X6K-SUP2-2GESTATUSSYSTEMCONSOLEPWR MGMTRESETCONSOLECONSOLE PORT MODEPCMCIAEJECTPOR T 1P OR T 2Switch Load 100% 1%LINK LINKSUPERVISOR2 WS-X6K-S UP2-2G ESTATUSSYSTEMCONSOLEPWR MGMTRESETCONSOLEC ONSOLE PORT MODEPCMCIAEJECTPORT 1PORT 2Switch Load 100% 1%LINK LINK 1 2 3 4 5 6 7 8 9 10 11 12 13 113977 Grounding pad Grounding lug Wire Screws (M4)
1-58 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Establishing the System Ground Figure 1-32 System Ground Location (Catalyst 6509-NEB-A and Catalyst 6509-V-E) 113678INPUT OKFA N OKOUTPUT FAIL o INPUT OKFA N OKOUTPUT FA I L o System ground connectors System ground connector Grounding lug Wire POW ER SUPPLY 1 POW ER SUPPLY 2 W S -S U P 32-G E -3BSTA TU S S YSTE M A CTI VE PWR M GMT R ES ETC ATA L Y S T 6500 S U PE RV IS O R E N G IN E 32 C O N S O L E E J E C TD IS K 0P O RT 1 P O RT 2 P O RT 3 P O RT 4P O RT 5 P O RT 6 P O RT 7P O RT 8P O RT 9 U SB 2 .0 L IN K L INK L INK LI NK LIN K LIN K L IN K L INK LI NK W S -S U P 32-G E -3BSTA TU S S YSTE M A CTI VE PWR MGMT R ES ETC ATA LY S T 6500 S U PE RV IS O R E N G IN E 32 C O N S O L E E J E C TD IS K 0P O RT 1 P O RT 2 P O RT 3 P O RT 4P O RT 5 P O RT 6 P O RT 7P O RT 8P O RT 9 U SB 2 .0 L IN K L INK L INK LI NK LIN K LIN K L IN K L INK LI NK WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48 WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48