Cisco 6500e Manual
Have a look at the manual Cisco 6500e Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 53 Cisco manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
1-39 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis Figure 1-20 Installing a Catalyst 6509-V-E Switch Chassis in a Rack 112-24 or 10-32 rack-mounting screws (10x)2Shelf bracket INPUT OKFA N OKOUTPUT FA IL o 280388 POWER SUPPLY 1 POWER SUPPLY 2 W S -S U P32 -G E -3 BSTA TUS SYSTEM ACTIVE PWR MG MT RES ETC A TA L Y S T 6 500 S UP E R V ISO R E N G IN E 32 C O N S O L E E J E C TD IS K 0P O R T 1 P O R T 2 P O R T 3 P O R T 4P O R T 5 P O R T 6 P O R T 7P O R T 8P O R T 9 U S B 2 .0 LIN K LIN K LIN K LINK LIN K LINK LINK LINK LINK W S -S U P32 -G E -3 BSTA TUS SYSTEM ACTIVE PWR MG MT RES ETC A TA L Y S T 6 500 S UP E R V ISO R E N G IN E 32 C O N S O L E E J E C TD IS K 0P O R T 1 P O R T 2 P O R T 3 P O R T 4P O R T 5 P O R T 6 P O R T 7P O R T 8P O R T 9 U S B 2 .0 LIN K LIN K LIN K LINK LIN K LINK LINK LINK LINK WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48 WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48 2 1
1-40 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis Installing the Cable Management System (Optional) The accessory kit for the Catalyst 6509-V-E switch chassis includes an optional cable management system that is installed on the front of the switch chassis. This cable management system is only available for the Catalyst 6509-V-E switch chassis. NoteThe cable management system adds an additional 6.8 inches (17.3 cm) (measured to the outside of the thumbscrews) to the overall depth of the chassis. To install the cable management system on the chassis, perform the following steps: Step 1Remove the cable management assembly from the packing material. Step 2Locate the bag containing the four 6-32 screws that accompanied the cable management assembly. Step 3Loosen the two captive screws on the inside of the cable management assembly and pivot the cable guide assembly away from the attachment bracket. (See Figure 1-21.) Step 4Position the cable management assembly in front of the chassis, align the four screw holes in the attachment bracket with the corresponding screw holes in the chassis, and secure the cable management assembly in place with the four 6-32 screws. (See Figure 1-21.) Figure 1-21 Installing the Catalyst 6509-V-E Cable Management Assembly 280372 2 1 3
1-41 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis Step 5Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush against the chassis. Secure the cable management assembly in place to the front of the chassis with the two captive installation screws. (See Figure 1-22.) Figure 1-22 Securing the Cable Management Assembly to the Front of the Chassis 1Cable guide assembly26-32 screws (4x) 3Attachment bracket 1Captive installation screws (2x) 1 280373
1-42 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground. See “Establishing the System Ground” section on page 1-52. Installing and connecting the power supplies to source power. Go to Chapter 4 for information on how to install and cable power supplies. Connecting the network interface cables to the supervisor engine and modules. This may involve installing transceivers before you attach the network interface cables. See “Attaching the Interface Cables” section on page 1-61. NoteIf you are going to use the cable management system to route the network interface cables, refer to “Using the Catalyst 6509-V-E Cable Management System” section on page 1-78. Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis Installation” section on page 1-84. Optional Installation Kits There are no optional installation kits for the Catalyst 6509-V-E switch chassis. Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis This section provides a procedure for installing either a Catalyst 6513 or Catalyst 6513-E switch chassis in a rack assembly and installing the optional cable guide assemblies. Installation Accessory Kit The Catalyst 6513 and the Catalyst 6513-E switch chassis are designed to be installed in a standard 19-inch rack either open or enclosed. The chassis is shipped with the 19-inch rack-mount brackets factory installed on the left-front and right-front of the chassis. Included in the accessory kit are 10-32 x 0.75-inch and 12-24 x 0.75-inch screws that are used to secure the chassis in the rack. NoteDepending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24 screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit and must be obtained on your own.
1-43 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis The accessory kit also contains the following chassis installation kits: A rack-mount shelf kit. The rack-mount shelf kit is used to support the weight of the chassis while you secure the chassis L brackets to the rack enclosure. A stabilizer bracket kit. If you are not installing the Catalyst 6513 or Catalyst 6513-E switch in a rack, you must install the stabilizer brackets to the bottom of the chassis. The stabilizer brackets reduce the possibility that the freestanding switch chassis will tip over. Also included in the accessory kit: Two optional cable guides—The two cable guides can be installed on the front left- and right-sides of the chassis using the same sets of screws (either 10-32 or 12-24) that secure the chassis rack-mount L brackets to the rack posts. Power supply blank panel—The power supply blank panel must be installed on an unused power supply bay to maintain chassis airflow and EMI shielding. L Brackets on the Catalyst 6513 and Catalyst 6513-E Switch Chassis The Catalyst 6513 and the Catalyst 6513-E switch chassis are shipped with the two L brackets installed on the front sides of the chassis. The L brackets are secured to the chassis with 14 M3 Phillips-head countersunk screws (seven screws on each side) as shown in Figure 1-23. NoteThe L brackets can also be reversed and installed on the rear of the chassis as an alternative method of installation.
1-44 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis Figure 1-23 L Brackets on the Catalyst 6513 Switch Chassis Installing the 3 RU Rack-Mount Shelf Kit The 3 RU rack-mount shelf kit is included as part of the accessory kit for the Catalyst 6513 and the Catalyst 6513-E switch chassis. You need to install this kit first before you install the chassis in the rack. The shelf kit supports the weight of the chassis while you install the chassis in the rack. The procedure for installing the shelf kit is located in the “Installing the 3 RU Rack-Mount Shelf Kit” section on page 1-47. 1M4 Phillips-head countersunk screws (10x)2Rack-mount L brackets (2x) FA N S TA TU S 8 PORT GI GABI T E THERN ETWS-X6 40 81L IN KSTA TUS2 3 4 5 6 7 8L IN KLINKLIN KL INKL IN KLIN KL IN K 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4ST AT U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S TAT U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S TAT U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T AT U S 1LI N K2LI N K3LI NK4LI N K5LI NK6LI NK7LINK8LI NK9LI N K1 0LINK1 1LI NK1 2LI NK1 3LI NK1 4LI N K1 5LI NK1 6LI NK1 7LIN K1 8LI NK1 9LIN K2 0LI NK2 1LINK2 2LI NK2 3LI N K2 4LI N K1L INK2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L IN K1 0L I N K1 1L INK1 2L I NK1 3L I NK1 4L I NK1 5L INK1 6L INK1 7L INK1 8L INK1 9L INK2 0L I NK2 1L I NK2 2L INK2 3L INK2 4L INK1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K10L I N K11L I N K12L I N K13L I N K14L I N K15L I N K16L I N K17L I N K18L I N K19L I N K20L I N K21L I N K22L I N K23L I N K24L I N K1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K1 0L IN K1 1L I N K1 2L I N K1 3L I N K1 4L I N K1 5L I N K1 6L I N K1 7L IN K1 8L I N K1 9L IN K2 0L I N K2 1L I N K2 2L I N K2 3L I N K2 4L I N K 1 2 3 4 5 6 7 8 9 10 11 12 13 280389 12
1-45 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis Rack-Mounting the Chassis TipWe recommend that you have a third person to assist in this procedure. CautionFor easier installation, the chassis should be empty when you install it in the rack. WarningTwo people are required to lift the chassis. To prevent injury, keep your back straight and lift with your legs, not your back. Statement 164 To install the switch chassis in the equipment rack, follow these steps: Step 1With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists or moves to prevent injury. Step 2Position the chassis in the rack as follows: a.If the front of the chassis (front panel) is at the front of the rack, insert the rear of the chassis between the mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into the rack. b.If the rear of the chassis is at the front of the rack, insert the front of the chassis between the mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into the rack. Step 3Locate the rack post holes that align with the chassis L bracket holes. If the rack post holes are prethreaded, determine if the threads are 10-32 or 12-24. If the rack post holes are unthreaded, install eight or ten (four or five on each side) either 10-32 or 12-24 clip or cage nuts over the rack post holes to accept the installation screws. NoteClip nuts or cage nuts are not included as part of the accessory kit that comes with the chassis. You must obtain them yourself. Step 4If you want to install one or both of the optional cable guide assemblies, position the cable guides so that the cable guide mounting holes are aligned with rack-mount bracket holes and the rack post holes as shown in Figure 1-24. Step 5Install a minimum of ten (five on each side) 10-32 or 12-24 screws through the cable guide mounting holes, rack-mount L bracket holes, rack post holes, and into the clip nuts to secure the cable guides and the chassis to the rack post. Tighten the screws securely. (See Figure 1-24.) Step 6Use a tape measure and level to verify that the chassis is installed straight and level. NoteIf you are not rack-mounting the Catalyst 6513 or the Catalyst 6513-E switch and you are installing the optional cable guide assemblies, you must obtain ten 12-24 or 10-32 nuts. Use the screws supplied in the accessory kit and the nuts you obtained to attach the cable guide assembly to the L bracket.
1-46 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis Figure 1-24 Installing the Catalyst6513 Switch Chassis in the Rack What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground. See “Establishing the System Ground” section on page 1-52. Installing and connecting the power supplies to source power. Go to Chapter 4 for information on how to install and cable power supplies. Connecting the network interface cables to the supervisor engine and modules. This may involve installing transceivers before you attach the network interface cables. See “Attaching the Interface Cables” section on page 1-61. Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis Installation” section on page 1-84. FA N STATUS 8 PORT GIGABIT ETHERNETW S-X64081L IN KSTATUS2 34 5 6 7 8L IN KL IN KLIN KLIN KL IN KLIN KLIN K8 P ORT GIGABIT ETHERNETWS-X64081LIN KSTATUS2 3 4 56 7 8LIN KLIN KL IN KL IN KLIN KLIN KLIN K8 PORT GIGABIT ETHERNETWS-X64081L IN KSTATUS2 34 5 6 7 8L IN KLIN KL IN KLIN KL IN KLIN KLIN K 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 2 4 P O R T 1 0 0 F XW S - X 6 2 2 4S T A T U S 1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK1 0LINK1 1LINK1 2LINK1 3LINK1 4LINK1 5LINK1 6LINK1 7LINK1 8LINK1 9LINK2 0LINK2 1LINK2 2LINK2 3LINK2 4LINK1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K1 0L I N K1 1L I N K1 2L I N K1 3L I N K1 4L I N K1 5L I N K1 6L I N K1 7L I N K1 8L I N K1 9L I N K2 0L I N K2 1L I N K2 2L I N K2 3L I N K2 4L I N K1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L I N K9L I N K10L I N K11L I N K12L I N K13L IN K14L I N K15L I N K16L I N K17L I N K18L I N K19L I N K20L I N K21L I N K22L I N K23L I N K24L I N K1L I N K2L I N K3L I N K4L I N K5L I N K6L I N K7L I N K8L IN K9L IN K1 0L I N K1 1L I N K1 2L I N K1 3L IN K1 4L I N K1 5L I N K1 6L I N K1 7L IN K1 8L IN K1 9L I N K2 0L I N K2 1L I N K2 2L IN K2 3L I N K2 4L I N K SUPERVISOR2 WS-X6K-SUP2-2GESTATUSSYSTEMCONSOLEPWR MGMTRESETCONSOLECONSOLE PORT MODEPCMCIAEJECTPORT 1PORT 2Switch Load 100% 1%LINK LINKSUPERVISOR2 WS-X6K-SUP2-2GESTATUSSYSTEMCONSOLEPWR MGMTRESETCONSOLECONSOLE PORT M OD EPCMCIAEJECTPORT 1PORT 2Switch Load 100% 1%LINK LINK 1 2 3 4 5 6 7 8 9 10 11 12 13 48125 12 x 24 or 10 x 32 (10x) Shelf bracket Cable guide L-bracket
1-47 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Generic Installation Procedures Optional Installation Kits An optional stabilizer bracket installation kit is included in the accessory kit for the Catalyst 6513 and the Catalyst 6513-E switch chassis. This kit contains the parts necessary to install two brackets on the bottom of the chassis to provide additional stability for the chassis when the chassis is not rack mounted allowing the chassis to placed on a shelf or a table. To install the stabilizer brackets, go to “Installing the Stabilizer Bracket Kit” section on page 1-50 A center rack-mount kit for 23-inch, telco-style racks is available as an option for the Catalyst 6513 and the Catalyst 6513-E switch chassis. The center rack-mount kit is not included in the accessory kit, but is available as a separately orderable item (p/n WS-6513-RACK-MNT=). Installation instructions are included with the kit. Generic Installation Procedures This section provides procedures covering how to install three installation kits that are included in multiple Catalyst 6500 series chassis accessory kits. The following procedures are provided in this section: Installing the 3 RU Rack-Mount Shelf Kit, page 1-47 Installing the Rubber Feet Kit, page 1-50 Installing the Stabilizer Bracket Kit, page 1-50 Installing the 3 RU Rack-Mount Shelf Kit This section describes how to install the 3 RU rack-mount shelf kit. The kit contains shelf brackets, a crossbar bracket, and screws. The shelf brackets attach directly to the rack and help support the weight of the chassis while you secure the L brackets to the rack enclosure. The rack-mount shelf kit is shipped as part of the Catalyst 6500 series switch accessory kit with the following chassis: Catalyst 6506 and Catalyst 6506-E Catalyst 6509 and Catalyst 6509-E Catalyst 6509-NEB and Catalyst 6509-NEB-A Catalyst 6509-V-E Catalyst 6513 and Catalyst 6513-E Ta b l e 1 - 3 lists and describes the contents of the rack-mount shelf kit. Table 1-3 Rack-Mount Kit Contents and Description Part Quantity Description Rack-mount shelf bracket 2 Attaches to the rack posts to form a shelf for the switch chassis to rest on. Crossbar bracket 1 Attaches between the two side rack-mount brackets to secure them together. 12-24 x 0.75-inches Phillips binder-head screw6 Secures the brackets (three for each bracket) to a rack that requires 12-24 screws.
1-48 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Generic Installation Procedures NoteThis rack-mounting kit is not suitable for use with racks that have obstructions (such as power strips) because the obstructions could impair access to switch field-replaceable units (FRUs). Required Tools These tools and equipment are required to install the rack-mount shelf kit: Number 1 and number 2 Phillips screwdrivers 3/16-inch flat-blade screwdriver Tape measure and level Installing the Shelf Brackets and Crossbar Bracket NoteOn many older equipment racks, the rack posts are prethreaded to accept either 10-32 or 12-24 screws. Newer rack enclosure posts might not be prethreaded. These rack enclosure posts require that you install 10-32 or 12-24 clip nuts or cage nuts to secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit and must be obtained on your own. To install the shelf bracket and crossbar bracket, follow these steps: Step 1Position one of the two shelf brackets in the rack as shown in Figure 1-25. Step 2Secure the shelf bracket to the rack by using three 12-24 x 3/4-inch or 10-32 x 3/4-inch screws. Step 3Repeat Steps 1 and 2 for the second shelf bracket. Make sure that the second shelf bracket is level with the first bracket. Step 4Attach the crossbar bracket to the back of the shelf brackets using two M3 screws as shown in Figure 1-26. 10-32 x 0.75-inches Phillips binder-head screw6 Secures the brackets (three for each bracket) to a rack that requires 10-32 screws. M3 x 8 mm Phillips pan-head screw2 Secures the crossbar bracket to the rack-mount side brackets. Table 1-3 Rack-Mount Kit Contents and Description (continued) Part Quantity Description