Home > Cisco > Ethernet Switch > Cisco 6500e Manual

Cisco 6500e Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Cisco 6500e Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 53 Cisco manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 454
    							1-19
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6506 or Catalyst 6506-E Switch Chassis
    Rack-Mounting the Chassis
    NoteThe chassis are designed to be mounted in equipment racks that meet ANSI/EIA 310-D and 
    ETS 300-119 standards.
    WarningTwo people are required to lift the chassis. To prevent injury, keep your back straight and lift with your 
    legs, not your back. Statement 164
    TipWe recommend that you have a third person to assist in this procedure.
    To install the switch chassis into the equipment rack, follow these steps: 
    Step 1With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the 
    other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists 
    or moves to prevent injury.
    Step 2Rest the back end of the chassis on the edges of the rack-mount shelf kit rails and carefully slide the 
    chassis fully into the rack.
    Step 3Locate the rack post holes that align with the chassis L bracket holes. If the rack post holes are 
    prethreaded, determine if the threads are 10-32 or 12-24. If the rack post holes are unthreaded, install a 
    minimum of eight (four on each side) either 10-32 or 12-24 clip or cage nuts over the rack post holes to 
    accept the installation screws. 
    NoteClip nuts or cage nuts are not included as part of the accessory kit that comes with the chassis. 
    You must obtain them yourself.
    Step 4If you want to install one or both of the optional cable guides, position the cable guides so that the cable 
    guide mounting holes are aligned with rack-mount bracket holes and the rack post holes. (See 
    Figure 1-8.)
    Step 5Install a minimum of eight 10-32 or 12-24 screws (four on each side) through the cable guide mounting 
    holes, rack-mount L bracket holes, rack post holes, and into the clip nuts to secure the cable guides and 
    the chassis to the rack post. Tighten the screws securely. 
    						
    							1-20
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6506 or Catalyst 6506-E Switch Chassis
    Figure 1-8 Installing a Catalyst 6506 or a Catalyst 6506-E Switch in a Rack
    What is Next
    After installing the chassis in its location, complete the installation process by following these 
    procedures:
    Connecting the chassis to system ground. See “Establishing the System Ground” section on 
    page 1-52.
    Installing and connecting the power supplies to source power. Go to Chapter 4 for information on 
    how to install and cable power supplies.
    Connecting the network interface cables to the supervisor engine and modules. This may involve 
    installing transceivers before you attach the network interface cables. See “Attaching the Interface 
    Cables” section on page 1-61.
    Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis Installation” 
    section on page 1-84.
    113975
    INPUT
    OKFA N
    OKOUTPUT
    FA I L
    o
    8
     P
    O
    R
    T
     G
    IG
    A
    B
    IT
     E
    T
    H
    E
    R
    N
    E
    TWS-X64081LINKSTATUS2
    3
    4
    5
    6
    7
    8LINKLINKLINKLINKLINKLINKLINK8
     P
    O
    R
    T G
    IG
    A
    B
    I
    T
     E
    T
    H
    E
    R
    N
    E
    TWS-X64081LINKSTATUS2
    3
    4
    5
    6
    7
    8LINKLINKLINKLINKLINKLINKLINK
    24 PORT 100FXW
    S
    -
    X
    6
    2
    2
    4S
    T
    A
    T
    U
    S1LIN
    K2LINK3LIN
    K4LINK5LINK6LIN
    K7LIN
    K8LIN
    K9LIN
    K10LIN
    K11L
    INK12LIN
    K13LIN
    K14LIN
    K15LIN
    K16LIN
    K17LIN
    K18LIN
    K19LIN
    K20LIN
    K21LIN
    K22LIN
    K23LIN
    K24LIN
    K
    FAN
    STATUS
    Shelf
    bracket
    Rack
    post
    12 x 24
    or
    10 x 32
    (10x)
    Cable guide
    1
    2
    3
    4
    5
    6 
    						
    							1-21
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
    Optional Installation Kits
    An optional rubber feet installation kit is included in the accessory kit for the Catalyst 6506-E switch 
    chassis. This kit contains the parts necessary to install four non-slip rubber feet on the bottom of the 
    chassis allowing the chassis to placed on a shelf or a table. To install the rubber feet, go to “Installing 
    the Rubber Feet Kit” section on page 1-50.
    A center rack-mount kit for 23-inch, telco-style racks is available as an option for both the Catalyst 6506 
    and the Catalyst 6506-E switch chassis. The kit is not included in the accessory kits, but is available as 
    a separately orderable item (p/n WS-C6597=). Installation instructions are included with the kit.
    Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
    This section provides procedures for installing either a Catalyst 6509 or a Catalyst 6509-E switch 
    chassis in a rack assembly and installing the optional cable guide assemblies. 
    Installation Accessory Kits
    The Catalyst 6509 and Catalyst 6509-E switch chassis are designed to be installed in a standard 19-inch 
    rack, either open or enclosed. Both chassis are normally shipped with the 19-inch rack-mount L brackets 
    factory installed on the left-front and right-front of the chassis. Included with the accessory kit are 10-32 
    x 0.75-inch and 12-24 x 0.75-inch screws that are used to secure the chassis in the rack enclosure. 
    NoteDepending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24 
    screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to 
    secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit 
    and must be obtained on your own.
    Depending on the chassis model, the accessory kit might also contain the following chassis installation 
    kits:
    Rack-mount shelf kit (Catalyst 6509 and Catalyst 6509-E). The rack-mount shelf kit is used to 
    support the weight of the chassis while you secure the chassis L brackets to the rack enclosure.
    Rubber feet mount kit (Catalyst 6509-E accessory kit only). This kit can be installed when you want 
    to install the Catalyst 6509-E chassis as a freestanding unit on a shelf or a table.
    Also included in the accessory kit: 
    Cable guides— Two cable guides can be installed on the front of the chassis using the same sets of 
    screws that secure the chassis rack-mount brackets to the rack posts.
    Power supply blank panel—The power supply blank panel must be installed on an unused power 
    supply bay to maintain chassis airflow and EMI shielding.
    L Brackets on the Catalyst 6509 and Catalyst 6509-E Switches
    The Catalyst 6509 and Catalyst 6509-E switch chassis are shipped with two L brackets installed on the 
    front sides of the chassis. The L brackets are secured to the chassis with ten M3 Phillips-head 
    countersunk screws (five M3 screws on each side) as shown in Figure 1-9.  
    						
    							1-22
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
    NoteThe L brackets can also be reversed and installed on the rear of the chassis as an alternative method of 
    installation.
    NoteThe L brackets for the Catalyst 6509 and the Catalyst 6509-E switches are stamped with an L and an R 
    to identify them as left and right.
    Figure 1-9 L Brackets on the Catalyst 6509 and the Catalyst 6509-E Switch Chassis
    Installing the 3 RU Rack-Mount Shelf Kit
    The 3 RU rack-mount shelf kit is included as part of the accessory kit for both the Catalyst 6509 and the 
    Catalyst 6509-E switch chassis. You need to install this kit first before you install the chassis in the rack. 
    The shelf kit supports the weight of the chassis while you install and secure the chassis in the rack.
    The procedure for installing the shelf kit is located at “Installing the 3 RU Rack-Mount Shelf Kit” 
    section on page 1-47. 1M4 Phillips-head countersunk screws (10x)2Rack-mount L bracket (2x)
    280387
    FA N
    STATUS
    INPUT
    OKFA N
    OKOUTPUT
    FA I
    L
    o
    1
    2
    3
    4
    5
    6
    7
    8
    9
    8 PORT
     GIGABIT ETHERNET
    WS-X64081L
    IN
    KS
    T
    AT
    US2
    3
    4
    5
    6
    7
    8LI
    NKLIN
    KL
    IN
    KLIN
    KL
    IN
    KLI
    NKLI
    NK
    8 PORT GIGABIT ETHERNET
    WS-X64081LINKSTATUS2
    3
    4
    5
    6
    7
    8LINKLIN
    KLIN
    KLIN
    KLINKLIN
    KLINK
    2
    4
     P
    O
    R
    T 1
    0
    0
    F
    X
    W
    S
    -
    X
    6
    2
    2
    4S
    TA
    TU
    S
    24
     P
    O
    R
    T 1
    0
    0
    F
    X
    W
    S
    -X
    6
    2
    2
    4S
    T
    AT
    U
    S
    2
    4
     P
    O
    R
    T 1
    0
    0F
    X
    W
    S
    -X
    6
    2
    2
    4S
    T
    AT
    U
    S
    24
     P
    O
    R
    T 1
    0
    0
    F
    X
    W
    S
    -X
    6
    2
    2
    4S
    T
    AT
    U
    S
    1LI
    NK2L
    IN
    K3L
    IN
    K4L
    INK5L
    IN
    K6LI
    NK7L
    IN
    K8LI
    NK9LI
    NK10L
    INK11L
    IN
    K12L
    INK13L
    IN
    K14L
    INK15L
    IN
    K16LI
    NK17L
    IN
    K18LINK19L
    IN
    K20LIN
    K21L
    IN
    K22LI
    NK23L
    IN
    K24L
    INK1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK1
    0LINK1
    1LINK1
    2LINK1
    3LINK1
    4LINK1
    5LINK1
    6LINK1
    7LINK1
    8LINK1
    9LINK2
    0LINK2
    1LINK2
    2LINK2
    3LINK2
    4LINK1LINK2LINK3LI
    N
    K4LIN
    K5LINK6LI
    NK7LINK8LI
    NK9LIN
    K10LINK1
    1LINK12LINK13LI
    NK14LI
    NK15L
    INK16LI
    NK17LI
    N
    K18LI
    NK19LINK20LI
    NK21L
    IN
    K22LI
    N
    K23L
    INK24LINK1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK10LINK11LINK12LINK13LINK14LINK15LINK16LINK17LINK18LINK19LINK20LINK21LINK22LINK23LINK24LINK
    12 
    						
    							1-23
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
    Rack-Mounting the Chassis
    NoteThe chassis are designed to be mounted in equipment racks that meet ANSI/EIA 310-D and 
    ETS 300-119 standards.
    WarningTwo people are required to lift the chassis. To prevent injury, keep your back straight and lift with your 
    legs, not your back. Statement 164
    TipWe recommend that you have a third person to assist in this procedure.
    To install the switch chassis in the equipment rack, follow these steps:
    Step 1With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the 
    other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists 
    or moves to prevent injury.
    Step 2Rest the back end of the chassis on the edges of the rack-mount shelf kit rails and carefully slide the 
    chassis fully into the rack.
    Step 3Locate the rack post holes that align with the chassis L bracket holes. If the rack post holes are 
    prethreaded, determine if the threads are 10-32 or 12-24. If the rack post holes are unthreaded, install 
    eight or ten (four or five on each side) either 10-32 or 12-24 clip or cage nuts over the rack post holes to 
    accept the installation screws. 
    NoteClip nuts or cage nuts are not included as part of the accessory kit that comes with the chassis. 
    You must obtain them yourself.
    Step 4If you want to install one or both of the optional cable guide assemblies, position the cable guides so that 
    the cable guide mounting holes are aligned with rack-mount bracket holes and the rack post holes as 
    shown in Figure 1-10. 
    Step 5Install a minimum of eight 10-32 or 12-24 screws (four on each side) through the cable guide mounting 
    holes, rack-mount L bracket holes, rack post holes, and into the clip nuts to secure the cable guides and 
    the chassis to the rack post. Tighten the screws securely. 
    						
    							1-24
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
    Figure 1-10 Installing a Catalyst 6509 Switch or a Catalyst 6509-E Switch Chassis in a Rack
    12 x 24
    or
    10 x 32
    (10x)
    Shelf
    bracketCable guideRack
    post
    113976
    FA N
    STATUS
    INPUT
    OKFA N
    OKOUTPUT
    FA I L
    o
    1
    2
    3
    4
    5
    6
    7
    8
    9
    8 PORT GIGABIT ETHERNET
    WS-X64081LINKSTATUS2
    3
    4
    5
    6
    7
    8LINKLINKLINKLINKLINKLINKLINK
    8 PORT GIGABIT ETHERNET
    WS-X64081LINKSTATUS2
    3
    4
    5
    6
    7
    8LIN
    KLINKLINKLINKLIN
    KLIN
    KLINK
    2
    4 P
    O
    R
    T
     1
    00
    F
    X
    W
    S
    -
    X
    6
    2
    2
    4S
    T
    A
    T
    U
    S
    2
    4 P
    O
    R
    T
     1
    00
    F
    X
    W
    S
    -
    X
    6
    2
    2
    4S
    T
    A
    T
    U
    S
    2
    4
     P
    O
    R
    T
     1
    0
    0
    F
    X
    W
    S
    -X
    6
    2
    2
    4S
    T
    A
    T
    U
    S
    24
     P
    O
    R
    T
     1
    0
    0
    F
    X
    W
    S
    -X
    6
    2
    2
    4S
    T
    A
    T
    U
    S
    1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK10LINK11LINK12LINK13LINK14LINK15LINK16LINK17LINK18LINK19LINK20LINK21LINK22LINK23LINK24LINK1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK1
    0LINK1
    1LINK1
    2LINK1
    3LINK1
    4LINK1
    5LINK1
    6LINK1
    7LINK1
    8LINK1
    9LINK2
    0LINK2
    1LINK2
    2LINK2
    3LINK2
    4LINK1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK10LINK11LINK12LINK13LINK14LINK15LINK16LINK17LINK18LINK19LINK20LINK21LINK22LINK23LINK24LINK1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK10LINK11LINK12LINK13LINK14LINK15LINK16LINK17LINK18LINK19LINK20LINK21LINK22LINK23LINK24LINK 
    						
    							1-25
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
    What is Next
    After installing the chassis in its location, complete the installation process by following these 
    procedures:
    Connecting the chassis to system ground. See “Establishing the System Ground” section on 
    page 1-52.
    Installing and connecting the power supplies to source power. Go to Chapter 4 for information on 
    how to install and cable power supplies.
    Connecting the network interface cables to the supervisor engine and modules. This may involve 
    installing transceivers before you attach the network interface cables. See “Attaching the Interface 
    Cables” section on page 1-61.
    Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis Installation” 
    section on page 1-84.
    Optional Installation Kits
    An optional rubber feet installation kit is included in the accessory kit for the Catalyst 6509-E switch 
    chassis. This kit contains the parts necessary to install four non-slip rubber feet on the bottom of the 
    chassis allowing the chassis to placed on a shelf or a table. To install the rubber feet, go to “Installing 
    the Rubber Feet Kit” section on page 1-50.
    A center rack-mount kit for 23-inch, telco-style racks is available as an option for both the Catalyst 6509 
    and the Catalyst 6509-E switch chassis. The kit is not included in the accessory kits, but is available as 
    a separately orderable item (p/n WS-C6597=). Installation instructions are included with the kit. 
    						
    							1-26
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis
    Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch 
    Chassis
    This section provides procedures for installing either a Catalyst 6509-NEB or a Catalyst 6509-NEB-A 
    switch chassis in a rack assembly and installing the optional cable guides. 
    Installation Accessory Kits
    The Catalyst 6509-NEB and Catalyst 6509-NEB-A switch chassis are designed to be installed in a 
    standard 19-inch rack, either open or enclosed. Both chassis are normally shipped with the 19-inch 
    rack-mount L brackets factory installed on the left-front and right-front of the chassis. Included with the 
    accessory kit are 10-32 x 0.75-inch and 12-24 x 0.75-inch screws that are used to secure the chassis in 
    the rack enclosure. 
    NoteDepending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24 
    screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to 
    secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit 
    and must be obtained on your own.
    Depending on the chassis model, the accessory kit might contain the following chassis installation kits:
    Rack-mount shelf kit (Catalyst 6509-NEB and Catalyst 6509-NEB-A). The rack-mount shelf kit is 
    used to support the weight of the chassis while you secure the chassis L brackets to the rack 
    enclosure.
    A stabilizer bracket kit (Catalyst 6509-NEB only). If you are not installing the Catalyst 6509-NEB 
    switch in a rack, you must install the stabilizer brackets to the bottom of the chassis. The stabilizer 
    brackets reduce the possibility that the freestanding switch chassis will tip over. 
    Also included in the Catalyst 6509-NEB accessory kit:
    One cable guide—The optional cable guide can be mounted to the front of the chassis. 
    Power supply blank panel—The power supply blank panel must be installed on an unused power 
    supply bay to maintain chassis airflow and EMI shielding.
    Also included in the Catalyst 6509-NEB-A accessory kit: 
    Cable management system—The optional cable management kit can be installed on the upper front 
    of the chassis.
    Power supply blank panel—The power supply blank panel must be installed on an unused power 
    supply bay to maintain chassis airflow and EMI shielding.
    L Brackets and the Optional Cable Guide on the Catalyst 6509-NEB Switch
    The Catalyst 6509-NEB switch chassis is shipped with the two L brackets installed on the front sides of 
    the chassis. The L brackets are secured to the chassis with eight M4 Phillips-head countersunk screws 
    (four screws on each side) as shown in Figure 1-12.  
    						
    							1-27
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis
    NoteThe L brackets can also be reversed and installed on the rear of the chassis as an alternative method of 
    installation.
    NoteThe Catalyst 6509-NEB L bracket screw holes are stamped + and –. You can install the brackets on either 
    the left or right side of the chassis; use the + holes on one side and the – holes on the other side. 
    The optional cable guide attaches to the front of the chassis using four M4 screws supplied in the 
    accessory kit. (See Figure 1-11.)
    Figure 1-11 L Brackets and Cable Guide Attachment on the Catalyst 6509-NEB Switch Chassis
    L Brackets on the Catalyst 6509-NEB-A Switch Chassis
    The Catalyst 6509-NEB-A switch chassis is shipped with the two L brackets installed on the front sides 
    of the chassis. The L brackets are secured to the chassis with 14 M3 Phillips-head countersunk screws 
    (seven screws on each side) as shown in Figure 1-12. These brackets can also be installed on the rear of 
    the chassis if necessary.
    FA N
    STATUS
    8 PORT GIGABIT ETHERNETWS-X6408
    1LINKSTATUS
    2
    3
    4
    5
    6
    7
    8LINK
    LINK
    LINK
    LINK
    LINK
    LINK
    LINK
    8 PORT GIGABIT ETHERNETWS-X6408
    1LINKSTATUS
    2
    3
    45
    67
    8LINK
    LINK
    LINK
    LINK
    LINK
    LINK
    LINK
    8 PORT GIGABIT ETHERNETWS-X6408
    1LINKSTATUS
    2
    3
    45
    6
    7
    8LINK
    LINK
    LINK
    LINK
    LINK
    LINK
    LINK
    24 PORT 100FXWS-X6224S
    T
    A
    T
    U
    S24 PORT 100FXWS-X6224S
    TA
    TU
    S24 PORT 100FXWS-X6224S
    T
    AT
    U
    S1L
    I
    N
    K2L
    I
    N
    K3L
    I
    N
    K4L
    I
    N
    K5L
    I
    N
    K6L
    I
    N
    K7L
    I
    N
    K8L
    I
    N
    K9L
    IN
    K10L
    IN
    K11L
    IN
    K12L
    IN
    K13L
    IN
    K14L
    IN
    K15L
    IN
    K16L
    IN
    K17L
    IN
    K18L
    IN
    K19L
    IN
    K20L
    IN
    K21L
    IN
    K22L
    IN
    K23L
    IN
    K24L
    IN
    K
    1L
    I
    N
    K2L
    IN
    K3L
    I
    N
    K4L
    IN
    K5L
    I
    N
    K6L
    I
    N
    K7L
    I
    N
    K8L
    IN
    K9L
    I
    N
    K10L
    IN
    K11L
    IN
    K12L
    IN
    K13L
    IN
    K14L
    IN
    K15L
    IN
    K16L
    IN
    K17L
    IN
    K18L
    IN
    K19L
    IN
    K20L
    IN
    K21L
    IN
    K22L
    IN
    K23L
    IN
    K24L
    IN
    K
    1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK10LINK11LINK12LINK13LINK14LINK15LINK16LINK17LINK18LINK19LINK20LINK21LINK22LINK23LINK24LINK
    24 PORT 100FXWS-X6224ST
    AT
    U
    S1LINK2LINK3LINK4LINK5LINK6LINK7LINK8LINK9LINK10LINK11LINK12LINK13LINK14LINK15LINK16LINK17LINK18LINK19LINK20LINK21LINK22LINK23LINK24LINK
    S
    U
    P
    E
    R
    V
    IS
    O
    R
    2 W
    S
    -X
    6
    K
    -S
    U
    P
    2-2
    G
    ES
    T
    A
    T
    U
    SS
    Y
    S
    T
    E
    MC
    O
    N
    S
    O
    L
    EP
    W
    R
     
    M
    G
    M
    TR
    E
    S
    E
    TCONSOLECONSOLE
    PORT
    MODE
    PCMCIA
    EJECT
    PORT 1
    PORT 2
    Switch    Load   
    100%
    1%
    L
    I
    N
    K
    L
    I
    N
    K
    S
    U
    P
    E
    R
    V
    IS
    O
    R
    2 W
    S
    -X
    6K
    -S
    U
    P
    2
    -2G
    ES
    T
    A
    T
    U
    SS
    Y
    S
    T
    E
    MC
    O
    N
    S
    O
    L
    EP
    W
    R
     
    M
    G
    M
    TR
    E
    S
    E
    TCONSOLECONSOLE
    PORT
    MODE
    PCMCIA
    EJECT
    PORT 1
    PORT 2
    Switch    Load   
    100%
    1%
    L
    I
    N
    K
    L
    I
    N
    K
    48124
    Cable
    guide
    M4 screwsL bracket L bracket 
    						
    							1-28
    Catalyst 6500 Series Switches Installation Guide
    OL-5781-08
    Chapter 1      Installing the Switch
      Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis
    Figure 1-12 L Brackets on the Catalyst 6509-NEB-A Switch Chassis
    Installing the 3 RU Rack-Mount Shelf Kit
    The 3 RU rack-mount shelf kit is included as part of the accessory kit for both the Catalyst 6509-NEB 
    and the Catalyst 6509-NEB-A switch chassis. You need to install this kit first before you install the 
    chassis in the rack. The shelf kit supports the weight of the chassis while you install the chassis in the 
    rack.
    The procedure for installing the shelf kit is located in the “Installing the 3 RU Rack-Mount Shelf Kit” 
    section on page 1-47.
    INPUT
    OKFA N
    OKOUTPUT
    FA I L
    o79896
    L bracket
    L bracket
    POWER SUPPLY 1
    POWER SUPPLY 2
    W
    S
    -S
    U
    P
    3
    2-G
    E
    -3
    BSTA
    TU
    S
    S
    YSTE
    M
    A
    CTI
    VE
    PWR
     M
    GMT
    R
    ES
    ETC
    ATA
    LY
    S
    T
       650
    0 S
    U
    PE
    RV
    IS
    O
    R
      E
    N
    G
    IN
    E
      32
    C
    O
    N
    S
    O
    L
    E
    E
    J
    E
    C
    TD
    IS
    K
     
    0P
    O
    RT
     
    1
    P
    O
    RT
     2
    P
    O
    RT
     
    3
    P
    O
    RT
     4P
    O
    RT
     
    5
    P
    O
    RT
     6
    P
    O
    RT
     
    7P
    O
    RT
     8P
    O
    RT
     
    9
    U
    SB
     
    2
    .0
    L
    IN
    K
    L
    INK
    L
    INK
    LI
    NK
    LIN
    K
    LIN
    K
    L
    IN
    K
    L
    INK
    LI
    NK
    W
    S
    -SU
    P
    32-G
    E-3BSTA
    T
    US
    SYSTE
    M
    A
    CT
    IVE
    PW
    R MG
    MT
    R
    ESETC
    AT
    A
    LY
    S
    T
       650
    0 S
    U
    PE
    R
    V
    IS
    O
    R
      E
    N
    G
    IN
    E
      32
    C
    O
    N
    S
    O
    L
    E
    E
    J
    E
    C
    TD
    I
    S
    K
     0P
    O
    RT
     1
    P
    O
    R
    T
     2
    P
    O
    R
    T
     3
    P
    O
    R
    T
     4P
    O
    RT
     5
    P
    O
    RT
     6
    P
    O
    RT
     7P
    O
    R
    T
     8P
    O
    R
    T
     9
    U
    SB
     2
    .
    0
    L
    IN
    K
    L
    INK
    L
    INK
    LIN
    K
    LIN
    K
    LIN
    K
    LIN
    K
    LIN
    K
    LIN
    K
    WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48
    WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48WS-X6548-GE-TX
    STATUS
    48 PORT10/100/1000
    BASE-T GESWITCHING MODULE
    123456789101112
    131415161718192021222324
    252627282930313233343536
    373839404142434445464748PHONE
    1
         211
         1213
         1423
         2425
         2635
         3637
         3847
         48 
    						
    All Cisco manuals Comments (0)