Cisco 6500e Manual
Have a look at the manual Cisco 6500e Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 53 Cisco manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
1-29 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Rack-Mounting the Chassis This section provides procedures for installing either the Catalyst 6509-NEB or the Catalyst 6509-NEB-A switch chassis in a 19-inch rack enclosure. NoteThe chassis are designed to be mounted in equipment racks that meet ANSI/EIA 310-D and ETS 300-119 standards. WarningTwo people are required to lift the chassis. To prevent injury, keep your back straight and lift with your legs, not your back. Statement 164 TipWe recommend that you have a third person to assist in this procedure. To install the switch chassis in the equipment rack, follow these steps: Step 1With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists or moves to prevent injury. Step 2Rest the back end of the chassis on the edges of the rack-mount shelf kit rails and carefully slide the chassis fully into the rack. Step 3Locate the rack post holes that align with the chassis L bracket holes. If the rack post holes are prethreaded, determine if the threads are 10-32 or 12-24. If the rack post holes are unthreaded, install eight or ten (four or five on each side) either 10-32 or 12-24 clip or cage nuts over the rack post holes to accept the installation screws. NoteClip nuts or cage nuts are not included as part of the accessory kit that comes with the chassis. You must obtain them yourself. Step 4Install a minimum of eight 10-32 or 12-24 screws (four on each side) through the cable guide mounting holes, rack-mount L bracket holes, rack post holes, and into the clip nuts to secure the cable guides and the chassis to the rack post, as shown in Figure 1-13. Tighten the screws securely.
1-30 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Figure 1-13 Installing a Catalyst 6509-NEB or a Catalyst 6509-NEB-A Switch Chassis in a Rack 112-24 or 10-32 rack-mounting screws (10x)2Shelf bracket INPUT OKFA N OKOUTPUT FA IL o 280388 POWER SUPPLY 1 POWER SUPPLY 2 W S -S U P32 -G E -3 BSTA TUS SYSTEM ACTIVE PWR MG MT RES ETC A TA L Y S T 6 500 S UP E R V ISO R E N G IN E 32 C O N S O L E E J E C TD IS K 0P O R T 1 P O R T 2 P O R T 3 P O R T 4P O R T 5 P O R T 6 P O R T 7P O R T 8P O R T 9 U S B 2 .0 LIN K LIN K LIN K LINK LIN K LINK LINK LINK LINK W S -S U P32 -G E -3 BSTA TUS SYSTEM ACTIVE PWR MGMT RES ETC A TAL Y S T 6 500 S UP E R V ISO R E N G IN E 32 C O N S O L E E J E C TD IS K 0P O R T 1 P O R T 2 P O R T 3 P O R T 4P O R T 5 P O R T 6 P O R T 7P O R T 8P O R T 9 U S B 2 .0 LIN K LIN K LIN K LINK LIN K LINK LINK LINK LINK WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48 WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48 2 1
1-31 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Installing the Cable Management System (Catalyst 6509-NEB-A Only) This section describes the installation procedures for the cable management system (CABLETRAY-09) on the Catalyst 6509-NEB-A switch. NoteThe cable management system is shipped with the extended cable guide installed but can be used with the supplied standard cable guide. Use the extended cable guide with Ethernet and Fast Ethernet modules (24 to 48 ports) using 10/100 cable. Use the standard cable guide with low port-density modules (up to 16 ports) using fiber and coax cable. We recommend that you install the cable management system before replacing the cable guide. See the “Replacing the Cable Guide” section on page 1-33 for replacement procedures. To install the cable management system, perform these steps: Step 1Place the cable management system against the chassis, as shown in Figure 1-14, and tighten the captive installation screws. Step 2Assure that the hinge is flat against the chassis, and install four 6-32 screws to secure the back plate to the chassis. Figure 1-14 Installing the Catalyst 6509-NEB-A Cable Management System NoteTo route the cables through the cable guide, remove the front panel, and attach the interface cables to the modules. See the “Attaching the Interface Cables” section on page 1-61 for information on attaching the interface cables. SUPERVISOR2 WS-X6K-SUP2-2GES T A T U SS Y S T E M SUPERVISOR2 WS-X6K-SUP2-2GES T A T U SS Y S T E M SWITCH FABRIC MDL S T A T U S WS-C6500-SFMSWITCH FABRIC MDL S T A T WS-C6500-SFMOC12 PO S MM O SM -40C12-POS -M MS T A T U SOC 12 POS MM OSM -40C12-POS-M MS T A T U SO C12 PO S M M OSM -40C12-POS-M MS T A T U S 8 PORT OC3 POS MM OSM-8OC3-POS MMSTATUS8 PORT OC3 POS OSM-8OC3-POS MMSTATUS 99969FAN STATUSFAN 1 FAN 2 Captive installation screws Hinge screws
1-32 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Step 3Loosen the two captive installation screws on the front panel. (See Figure 1-15.) Figure 1-15 Removing the Front Panel Step 4 Remove the front panel, and set it aside. Step 5Attach the interface cables to the modules, and route the cables through the cable guide. Step 6Install the front panel by positioning the top of the front panel over the cable guide. Step 7Tighten the two captive installation screws. (See Figure 1-15.) S U P E R V IS O R 2 W S - X 6 K -S U P 2 -2 G ES T A T U SS Y S T E M S U P E R V IS O R 2 W S -X 6 K -S U P 2 - 2 G ES T A T U SS Y S T E M SWITCH FABRIC MDL STATUS WS-C6500-SFMSWITCH FABRIC MDL STAT WS-C6500-SFMO C 1 2 P O S M M O S M -4 0 C 1 2 -P O S - M MS T A T U SO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S -M MS T A T U SO C 1 2 P O S M M O S M -4 0 C 1 2 - P O S - M MS T A T U S 8 PORT OC3 POS MM OSM-8OC3-POS MMSTATUS8 PORT OC3 POS OSM-8OC3-POS MMSTATUS 99970FAN STATUSFAN 1 FAN 2 Captive installation screws
1-33 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Replacing the Cable Guide To replace the cable guides on the cable management system, perform these steps: Step 1Loosen the two captive installation screws on the front panel. (See Figure 1-16.) Figure 1-16 Removing the Front Panel Step 2 Remove the front panel, and set it aside. Step 3Remove the two screws that secure the cable guide to the back panel, and remove the cable guide by lifting it up and away from the back panel. (See Figure 1-17.) Figure 1-17 Removing the Cable Guide S U P E R V IS O R 2 W S -X 6 K -S U P 2 -2 G ES T A T U SS Y S T E M S U P E R V IS O R 2 W S - X 6 K -S U P 2 -2 G ES T A T U SS Y S T E M SWITCH FABRIC MDL STATUS WS-C6500-SFMSWITCH FABRIC MDL STAT WS-C6500-SFMO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S -M MS T A T U SO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S - M MS T A T U SO C 1 2 P O S M M O S M - 4 0 C 1 2 -P O S -M MS T A T U S 8 PORT OC3 POS MM OSM-8OC3-POS MMSTATUS8 PORT OC3 POS OSM-8OC3-POS MMSTATUS 99970FAN STATUSFAN 1 FAN 2 Captive installation screws SUPERVISOR2 WS-X6K-SUP2-2GES T A T U SS Y S T E MSUPERVISOR2 WS-X6K-SUP2-2GES T A T U SS Y S T E M S W I T C H F A B R IC M D LSTATUS W S - C 6 5 0 0 - S F MS W IT C H F A B R I C M D LSTAT W S - C 6 5 0 0 - S F MO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S - M MSTATUSO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S - M MSTATUSO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S - M MSTATUS8 PORT OC3 POS MM OSM-8OC3-POS MMS T A T U S8 PORT OC3 POS OSM-8OC3-POS MMS T A T U S FAN STATUSFAN 1 FAN 285431
1-34 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Step 4Install the standard cable guide to the back panel by securing the lip of the cable guide to the back panel. (See Figure 1-17.) Step 5Install the two screws to secure the cable guide to the back plate. (See Figure 1-17.) NoteBefore installing the front panel, attach the interface cables to the modules, and route the cables through the cable guide. See the “Attaching the Interface Cables” section on page 1-61 for information on attaching the interface cables. Step 6Attach the interface cables to the modules, and route the cables through the cable guide. Step 7Install the front panel by hooking the top of the front panel over the cable guide. Step 8Tighten the two captive installation screws. (See Figure 1-18.) Figure 1-18 Front Panel Installation S U P E R V IS O R 2 W S - X 6 K -S U P 2 -2 G ES T A T U SS Y S T E M S U P E R V IS O R 2 W S -X 6 K - S U P 2 -2 G ES T A T U SS Y S T E M SWITCH FABRIC MDL STATUS WS-C6500-SFMSWITCH FABRIC MDL STAT WS-C6500-SFMO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S -M MS T A T U SO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S - M MS T A T U SO C 1 2 P O S M M O S M - 4 0 C 1 2 - P O S - M MS T A T U S 8 PORT OC3 POS MM OSM-8OC3-POS MMSTATUS8 PORT OC3 POS OSM-8OC3-POS MMSTATUS 99970FAN STATUSFAN 1 FAN 2 Captive installation screws
1-35 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis What is Next After installing the chassis in its location, complete the installation process by performing these procedures: Connecting the chassis to system ground. See “Establishing the System Ground” section on page 1-52. Installing and connecting the power supplies to source power. Go to Chapter 4 for information on how to install and cable power supplies. Connecting the network interface cables to the supervisor engine and modules. This may involve installing transceivers before you attach the network interface cables. See “Attaching the Interface Cables” section on page 1-61. Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis Installation” section on page 1-84. Optional Installation Kits The Catalyst 6509-NEB accessory kit has an optional stabilizer bracket installation kit included. This kit contains the parts necessary to install two brackets on the bottom of the chassis to provide additional stability for the chassis when the chassis is not rack mounted allowing the chassis to placed on a shelf or a table. To install the stabilizer brackets, go to “Installing the Stabilizer Bracket Kit” section on page 1-50.
1-36 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis Installing a Catalyst 6509-V-E Switch Chassis This section provides procedures for installing a Catalyst 6509-V-E switch chassis in a rack assembly and installing the optional cable guide system. Installation Accessory Kit The Catalyst 6509-V-E switch chassis is designed to be installed in a standard 19-inch rack, either open or enclosed. The chassis is shipped with the 19-inch rack mount L brackets installed on the left-front and right-front of the chassis. Included in the accessory kit are 10-32 x 0.75-inch and 12-24 x 0.75-inch screws used to secure the chassis in the rack enclosure. NoteDepending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24 screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit and must be obtained on your own. Included in the accessory kit is the rack-mount shelf kit. The rack-mount shelf kit is used to support the weight of the chassis while you secure the chassis L brackets to the rack enclosure. Also included in the Catalyst6509-V-E switch accessory kit: Cable management system—The optional cable management system can be attached to the front of the chassis. Power supply blank panel—The power supply blank panel must be installed on an unused power supply bay to maintain chassis airflow and EMI shielding. L Brackets on the Catalyst 6509-V-E Switch Chassis The Catalyst 6509-V-E switch chassis is shipped with the two L brackets installed on the front sides of the chassis. Each L bracket is secured to the chassis with 14 M4 Phillips-head countersunk screws (seven screws on each side) as shown in Figure 1-19. NoteThe L brackets can also be reversed and installed on the rear of the chassis as an alternative method of installation.
1-37 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis Figure 1-19 L Brackets on the Catalyst 6509-V-E Switch Chassis Installing the 3 RU Rack-Mount Shelf The 3 RU rack-mount shelf is included as part of the accessory kit for the Catalyst 6509-V-E switch chassis. You need to install this kit first before you install the chassis in the rack. The shelf kit supports the weight of the chassis while you install the chassis in the rack. The procedure for installing the shelf kit is located in the “Installing the 3 RU Rack-Mount Shelf Kit” section on page 1-47. INPUT OKFA N OKOUTPUT FA I L o79896 L bracket L bracket POWER SUPPLY 1 POWER SUPPLY 2 W S -SU P 32-G E-3BSTA TU S S YSTE M A CTI VE PWR MGMT R ES ETC ATA LY S T 650 0 S U PE RV IS O R E N G IN E 32 C O N S O L E E J E C TD I S K 0P O RT 1 P O RT 2 P O RT 3 P O RT 4P O RT 5 P O RT 6 P O RT 7P O RT 8P O RT 9 U SB 2 . 0 L IN K L INK L IN K LI NK LIN K LIN K L IN K L INK LI NK W S -SU P 32-G E-3BSTA T US SYSTE M A CT IVE PW R MG MT R ESETC ATA LY ST 6500 SU PE RV ISO R E N G IN E 3 2 C O N S O L E E J E C TD I S K 0P O RT 1 P O R T 2 P O R T 3 P O R T 4P O RT 5 P O RT 6 P O RT 7P O R T 8P O R T 9 U SB 2 . 0 L IN K L INK L INK LIN K LIN K LIN K LIN K LIN K LIN K WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48 WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48WS-X6548-GE-TX STATUS 48 PORT10/100/1000 BASE-T GESWITCHING MODULE 123456789101112 131415161718192021222324 252627282930313233343536 373839404142434445464748PHONE 1 211 1213 1423 2425 2635 3637 3847 48
1-38 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis Rack-Mounting the Chassis TipWe recommend that you have a third person to assist in this procedure. CautionFor easier installation, the chassis should be empty when you install it in the rack. WarningTwo people are required to lift the chassis. To prevent injury, keep your back straight and lift with your legs, not your back. Statement 164 To install the switch chassis in the equipment rack, follow these steps: Step 1With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists or moves to prevent injury. Step 2Position the chassis in the rack as follows: a.If the front of the chassis (front panel) is at the front of the rack, insert the rear of the chassis between the mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into the rack. b.If the rear of the chassis is at the front of the rack, insert the front of the chassis between the mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into the rack. Step 3Align the mounting holes in the L bracket with the mounting holes in the equipment rack. Step 4Install the eight or ten (four or five per side) 12-24 x 3/4-inch or 10-32 x 3/4-inch screws through the holes in the L bracket mounting holes, and into the threaded holes in the equipment rack posts. (See Figure 1-20.) Step 5Use a tape measure and level to verify that the chassis is installed straight and level.