Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Have a look at the manual Lucent Technologies Definity Release 8.2 Atm Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-25 Synchronization Installation and Testing 3 To c onfig ure the 316X CSU to send an AIS b lue alarm, use the p roc ed ures in Table 3-12 . NOTE: All four fac eplate status LEDs on the DS1 c irc uit p ac k are d ark (not lit) when using an external CSU or DSU/CSU. The STATUS LEDs on the DS1 c irc uit p ac k are only func tional with a 120A ICSU. Table 3-12. Configuring the 316X CSU to send AIS blue alarm ÖStep Action Description 1. Config ure CSU At the 316X CSU p ress the double-up arrow 2. Go throug h the readout step sPress the b utton und er “ Cnfig.” 3. Continue Press the b utton und er “ Ac tiv.” 4. Continue Press the b utton und er “ Ed it.” 5. Continue Press the rig ht arrow until “ GEN” disp lays. 6. Continue Press the b utton und er “ GEN.” 7. Continue Press F1 (“Next”) until “Gen Yellow Alarm” d isplays. (This op tion d efaults as enab led .) 8. Continue Press the b utton und er “ Disab led .” 9. Continue Press the d oub le-up arrow. Save Option displays when “Enab led ” c hanges to “Disabled.” 10. Save setting s Press the b utton und er the word “ Yes” at the “ Save Op tions Yes or No” p romp t. Otherwise press F1 twic e. 11. Save op tions Press the b utton under “Activ” when asked where to save the options. Command Complete displays. 12. Return to d efault sc reenThe CSU times out to its d efault ESF CSU Op erational screen or set it there b y p ressing the d oub le-up arrow onc e and then p ressing F1 twic e. 13. Install the sp litter Go to Table 3-13 to install the splitter. Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-26 Synchronization Installation and Testing 3 To install a 400A sync sp litter between a CSU or DSU/CSU and a DS1 c irc uit p ac k, follow the p roc ed ures listed in Table 3-13 . Table 3-13. Splitter installation to DS1 ÖStep Action Command Description 1. Disab le sync hronization switc hdisable sync hronization -switc hPrevent the system from switc hing sync hronization sources. 2. Busyout DS1 circuit packb usyout board UUCSSBusyout the d esig nated DS1 circuit p ack. 3. Remove c ab le from DS1 circuit packRemove the H600-307 c able from the amphenol c onnector located on rear of the DS1 c irc uit pack. 4. Attach the sp litterPlug the sp litter into the same c onnec tor just vacated b y the H600-307 cab le. 5. Rec onnec t the cablePlug the H600-307 cab le into the c onnector on the sp litter. 6. Secure the sp litterSec ure the splitter to the c arrier using the larg e mounting strap removed from a fib er transc eiver. 7. Check c onnectionsCheck that all Amphenol c onnections are secure. 8. Release DS1 circuit packrelease b oard UUCSSRestore the d esig nated DS1 c ircuit p ack to service. 9. Test the sp litter Use the p roc edure in ‘‘Splitter port tests (401A/401A only)’’ on page 3-19. nBefore testing the sp litter, insert a mod ular RJ45 plug into jac k J1 and jac k J2. NOTE: Do not connect p ort J1 to port J2. Leave the other end of b oth c ord s free, b ec ause the modular RJ45 p lug acts as a op ening p lug and removes the 100-W termination from J1 and J2 p orts. nAfter testing is comp lete, remove the op ening plug s from J1 and J2. 10. Chec k DSU/CSU LEDsAfter ab out 20 s, all the alarm LEDs on the 316X CSU or DSU/CSU should go out. If this is the c ase, p erform step s 11 throug h 12. Otherwise, g o to step 13. Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-27 Synchronization Installation and Testing 3 DTE loopback procedure. To start the Data Terminal Eq uip ment (DTE) loop b ac k at the 316X CSU or DSU/CSU, use the p roc ed ures in Table 3-14 . 11. Chec k for CSU alarmsVerify that no alarms are against the CSU (the OK, SIG, SIG LEDs are lit). 12. Test the circ uit packtest board UUCSSVerify that the DS1 c irc uit p ac k p asses Tests 138 through 145. If these tests p ass and this is a new installation, go to Step 14. If any one of Test 138 through 145 fails, follow the repair p roc ed ures listed in DEFINITY ECS Maintenanc e for R8r. After c learing all errors, retest the c irc uit p ac k. 13. Run error rep ortlist measurements ds1 summary UUCSSWait 15 minutes. Check the error rep ort and verify that the DS1 c irc uit pac k is free of any errors. To interp ret the period ic list measurements rep ort. 14. DTE and RLB loopback tests (new installations)Perform both DTE and RLB loop bac k test at the 316X CSU or DSU/CSU to verify that the DS1 b oard can succ essfully transmit and receive a DS1 sig nal through the sp litter to the 316X and b ac k to the DS1 b oard . Go to the ‘‘DTE loopback procedure’’ on page 3-27 and ‘‘RLB loopback procedure’’ on page 3-28 Table 3-14. DTE loopback testing for the 316X DSU/CSU ÖStep Action Command Description 1. Beg in the loopback testPress the d oub le-up arrow b utton. 2. Go throug h the read out step sPress the b utton und er “ Test.” 3. Continue Press the b utton und er “ Lp b k.” Continued on next page Table 3-13. Splitter installation to DS1 — Continued ÖStep Action Command Description Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-28 Synchronization Installation and Testing 3 RLB loopback procedure . To start the RLB loop b ac k testing at the 316X CSU or DSU/CSU, use the p roc ed ures in Table 3-15 . 4. ContinuePress the b utton und er “ DLB.” Test Started d isp lays. The 316X is now in DTE loopb ack. 5. Test the circuit packtest board UUCSSAt the DEFINITY management terminal. If any one of Test 138 through 145 fails, follow the rep air p roc edures listed in DEFINITY ECS Maintenanc e for R8r. 6. Run error rep ortlist measurements ds1 summary UUCSSWait 15 minutes and verify that the DS1 circuit p ack is free of any errors. Use Table 3-6 to interp ret the p eriodic list measurements rep ort. 7. Terminate the DTE loopback testPress the d oub le-up arrow b utton. 8. Go throug h the read out step sPress the b utton und er “ test.” 9. Continue Press the b utton und er “ lp b k.” 10. Continue Press the b utton und er “ ab ort.” 11. Continue Press the b utton und er “ all.” 12. Continue test p roced ureIf all tests pass, and the splitter, cab ling, and 316X CSU or DSU/CSU are working p rop erly, g o to the ‘‘RLB loopback procedure’’ on page 3-28. Table 3-15. RLB loopback testing for the 316X DSU/CSU ÖStep Action Command Description 1. Start the test. Press the d oub le-up arrow b utton. 2. Go throug h the readout step sPress the b utton under “ Test.” 3. Continue Press the b utton under “ Lpb k.” Continued on next page Table 3-14. DTE loopback testing for the 316X DSU/CSU — Continued ÖStep Action Command Description Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-29 Synchronization Installation and Testing 3 4. ContinuePress the b utton under “ RLB.” Test Started d isp lays. The 316X is now in RLB loop bac k. 5. Test the c irc uit packtest board UUCSSIf any one of Test 138 through 145 fails, follow the repair p roc ed ures listed in DEFINITY ECS Maintenanc e for R8r. 6. Run error rep ortlist measurements d s1 summary UUCSSWait 15 minute, then verify that the DS1 c irc uit p ac k is free of any errors. Use Table 3-6 to interpret the p eriod ic list measurements rep ort. 7. Terminate the RLB loopb ac k testPress the d oub le-up arrow b utton. 8. Go throug h the readout step sPress the b utton under “ test.” 9. Continue Press the b utton under “ lpb k.” 10. Continue Press the b utton under “ abort.” 11. Continue Press the b utton under “ all.” If all tests pass, and the sp litter, cab ling, and 316X CSU or DSU/CSU are working p rop erly. 12. Return DSU/CSU to servicePress the d oub le-up arrow. 13. Go throug h the readout step sPress the right-arrow button until “ Cntrl” displays. 14. Continue Press the b utton under “ Cntrl.” 15. Continue Press the b utton under “ LED.” 16. Continue Press the b utton under the word PRT1, PRT2, PRT3 o r PRT4 a s re q ui red . 17. Verify that the DSU/CSU is in normal op erating mod e.Press the d oub le-up arrow onc e, then p ress the F1 button twic e. ESF CSU OPERATIONAL displays. Table 3-15. RLB loopback testing for the 316X DSU/CSU — Continued ÖStep Action Command Description Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-30 Synchronization Installation and Testing 3 Installing 401A, 402A, or 403A splitters To install a 401A, 402A, or 403A sync sp litter b etween the network and a DS1 c irc uit p ac k, follow the p roc ed ures listed in Table 3-16 . Table 3-16. Splitter installation to DS1 (401A/402A/403A) ÖStep Action Command Description 1. Disab le sync hronization switc hdisable sync hronization -switc hPrevent the system from switc hing sync hronization sources. 2. Busyout DS1 circuit packb usyout board UUCSSBusyout the d esig nated DS1 circuit p ack. 3. Ad minister sync sp litterchange DS1 UUCSSAd minister the sync splitter. For T1, set the Near-end CSU Type: field to integrated (see Screen 3-1 ). For E1, set the E1 Sync-Splitter? field to y (see Screen 3-2 ). 4. Remove c ab le from DS1 circuit packRemove the c ab le from the amp henol c onnector located on rear of the DS1 c irc uit pack. 5. Attach the sp litterPlug the sp litter into the same c onnec tor just vacated by the cable. 6. Rec onnec t the cablePlug the c able into the c onnec tor on the sp litter. 7. Secure the sp litterSec ure the splitter to the c arrier using the larg e mounting strap removed from a fib er transc eiver. 8. Check c onnectionCheck that the Amp henol connection is sec ure. 9. Reseat DS1 circuit packRelease the clip hold ing the DS1 c irc uit pac k, p ull out slightly, close c lip . 10. Release DS1 circuit packrelease b oard UUCSSRestore the d esig nated DS1 c ircuit p ack to service. Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-31 Synchronization Installation and Testing 3 11. Test the sp litter Use the p roc edure in ‘‘Splitter port tests (401A/401A only)’’ on page 3-19. nBefore testing the sp litter, insert a mod ular RJ45 plug into jac k J1 and jac k J2 (401A/402A only). NOTE: Do not connect p ort J1 to port J2. Leave the other end of b oth c ord s free, b ec ause the modular RJ45 p lug acts as a op ening p lug and removes the 100-W termination from J1 and J2 p orts. The stand ard RJ45-to-Bantam test cab le d oes not work with the 403A. You need a c oax-to-Bantam cab le or an ad apter for the RJ45 connector. nAfter testing is comp lete, remove the op ening plug s from J1 and J2. 12. Chec k the 7 DS1 LEDsAfter ab out 20 s, all the alarm LEDs on the DS1 g o out and the status 3 LED is stead y g reen. If this is the c ase, c ontinue. If not, follow the DS1 sp an test p roc edures in the DEFINITY ECS Maintenanc e for R8r. 13. Test the circ uit packtest board UUCSSVerify that the DS1 c irc uit p ac k p asses Tests 138 through 146 and 1227. If these tests p ass and this is a new installation, continue. If any one of Test 138 through 146 fails, follow the rep air p roc ed ures in DEFINITY ECS Maintenanc e for R8r. After c learing all errors, retest the c irc uit p ac k. 14. Run error rep ortlist measurements ds1 summary UUCSSWait 15 minutes. Check the error rep ort and verify that the DS1 c irc uit pac k is free of any To interp ret the period ic list measurements report, refer to Table 3-16. Splitter installation to DS1 — Continued(401A/402A/403A) ÖStep Action Command Description Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-32 ATM Network Duplication 3 Screen 3-1.DS1 circuit pack—T1 Screen 3-2. DS1 circuit pack—E1 ATM Network Duplication ATM-PNC c onfig urations without d uplic ated SPEs c an b e sup p orted with d up lic ated EPN c onnec tivity to other p oints on an ATM network, or ATM network dup lic ation. These p oints c an b e on sep arate ATM switc hes, the same ATM switc h, or d irec tly c onnec ted to an ATM-WAN. add ds1 b10 Page 1 of 2 DS1 CIRCUIT PACK Location: 01B10 Name: xxxxxxxxxxxxxxx Bit Rate: 1.544 Line Coding: b8zs Signaling Mode: isdn-pri Connect: line-side Country Protocol: 1 Protocol Version: a Interface Companding: mulaw CRC? n Idle Code: 11111111 DCP/Analog Bearer Capability: 3.1kHz Slip Detection? n Near-end CSU Type: integrated Alarm When PRI Endpoint Detached? y add ds1 b10 Page 1 of 2 DS1 CIRCUIT PACK Location: 01B10 Name: xxxxxxxxxxxxxxx Bit Rate: 2.048 Line Coding: hdb3 Signaling Mode: isdn-pri Connect: line-side Country Protocol: 2 Protocol Version: a Interface Companding: mulaw CRC? n Idle Code: 11111111 DCP/Analog Bearer Capability: 3.1kHz Slip Detection? n Near-end CSU Type: other E1 Sync-Splitter? yAlarm When PRI Endpoint Detached? y
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-33 ATM Network Duplication 3 With resp ec t to port network c onnec tivity, there is no d ifferenc e in p erformanc e b etween ATM network d up lic ation and c ritic al reliab ility. ATM network d up lic ation configurations require nA s i m p le x SPE c o m p l e x in t h e PPN nDup lic ate c onnec tivity over ATM to all PNs nDuplicate ATM interfaces in each EPN nDup lic ate Tone-Cloc k b oard s in eac h EPN. An ATM network d up lic ation c onfig uration c an b e the result of nA new installation nAn up g rad e from a stand ard reliab ility system The EPN c onfig uration for ATM network d up lic ation is the same as for an EPN eq uip p ed for ATM c ritic al reliab ility (Figure 3-9 ).
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-34 ATM Network Duplication 3 Figure 3-9. EPN configuration with ATM network duplicationFigure Notes 1 . D EFI N ITY EC S PPN 1 2. Fib er c onnec ting ATM-EI A to ATM switc h A 3. Fib er c onnec ting ATM-EI B to ATM switc h B 4. Luc ent ATM switc h A 5. Luc ent ATM switc h B6. Fib er c onnec ting ATM switc h A to EPNs 7. Fib er c onnec ting ATM switc h B to EPNs 8 . D EFI N I TY EC S EPN 1 9. DEFINITY ECS PPN2 1 0 . D EFI N I TY EC S EPN 2 cydasmpx LJK 020100 1 2 3 4 5 6 6 6 7 7 7 8 9 10