    Have a look at the manual Lucent Technologies Definity Release 8.2 Atm Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-25 Synchronization Installation and Testing 
    3
    To c onfig ure the 316X CSU to send  an AIS b lue alarm, use the p roc ed ures in 
    Table 3-12
    .
    NOTE:
    All four fac eplate status LEDs on the DS1 c irc uit p ac k are d ark (not lit) when 
    using  an external CSU or DSU/CSU. The STATUS LEDs on the DS1 c irc uit 
    p ac k are only func tional with a 120A ICSU.
    Table 3-12. Configuring the 316X CSU to send AIS blue alarm 
    ÖStep Action Description
    1. Config ure CSU At the 316X CSU p ress the double-up  arrow
    2. Go throug h the 
    readout step sPress the b utton und er “ Cnfig.”
    3. Continue Press the b utton und er “ Ac tiv.”
    4. Continue Press the b utton und er “ Ed it.”
    5. Continue Press the rig ht arrow until “ GEN”  disp lays.
    6. Continue Press the b utton und er “ GEN.”
    7. Continue Press F1 (“Next”) until “Gen Yellow Alarm” d isplays. (This 
    op tion d efaults as enab led .)
    8. Continue Press the b utton und er “ Disab led .”
    9. Continue Press the d oub le-up  arrow.
    Save Option displays when “Enab led ” c hanges to 
    “Disabled.” 
    10. Save setting s Press the b utton und er the word “ Yes”  at the “ Save 
    Op tions Yes or No”  p romp t. Otherwise press F1 twic e.
    11. Save op tions Press the b utton under “Activ” when asked  where to save 
    the options.
    Command Complete displays.
    12. Return to d efault 
    sc reenThe CSU times out to its d efault ESF CSU Op erational 
    screen or set it there b y p ressing  the d oub le-up arrow 
    onc e and  then p ressing  F1 twic e.
    13. Install the sp litter
    Go to Table 3-13 to install the splitter.
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-26 Synchronization Installation and Testing 
    3
    To install a 400A sync  sp litter between a CSU or DSU/CSU and  a DS1 c irc uit 
    p ac k, follow the p roc ed ures listed  in Table 3-13
    .
    Table 3-13. Splitter installation to DS1
    ÖStep Action Command Description
    1. Disab le 
    sync hronization 
    switc hdisable 
    sync hronization
    -switc hPrevent the system from switc hing 
    sync hronization sources.
    2. Busyout DS1 
    circuit packb usyout board 
    UUCSSBusyout the d esig nated  DS1 circuit p ack.
    3. Remove c ab le 
    from DS1 
    circuit packRemove the H600-307 c able from the amphenol 
    c onnector located on rear of the DS1 c irc uit 
    pack.
    4. Attach the 
    sp litterPlug the sp litter into the same c onnec tor just 
    vacated  b y the H600-307 cab le.
    5. Rec onnec t the 
    cablePlug the H600-307 cab le into the c onnector on 
    the sp litter.
    6. Secure the 
    sp litterSec ure the splitter to the c arrier using  the larg e 
    mounting  strap  removed  from a fib er 
    transc eiver.
    7. Check 
    c onnectionsCheck that all Amphenol c onnections are 
    secure.
    8. Release DS1 
    circuit packrelease b oard  
    UUCSSRestore the d esig nated  DS1 c ircuit p ack to 
    service.
    9. Test the sp litter Use the p roc edure in ‘‘Splitter port tests 
    (401A/401A only)’’ on page 3-19.
    nBefore testing  the sp litter, insert a mod ular 
    RJ45 plug into jac k J1 and  jac k J2.
    NOTE:
    Do not connect p ort J1 to port J2. Leave 
    the other end of b oth c ord s free, b ec ause 
    the modular RJ45 p lug  acts as a op ening  
    p lug  and  removes the 100-W termination 
    from J1 and J2 p orts. 
    nAfter testing  is comp lete, remove the 
    op ening  plug s from J1 and  J2.
    10. Chec k 
    DSU/CSU 
    LEDsAfter ab out 20 s, all the alarm LEDs on the 316X 
    CSU or DSU/CSU should  go out. 
    If this is the c ase, p erform step s 11 throug h 12. 
    Otherwise, g o to step 13.
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-27 Synchronization Installation and Testing 
    3
    DTE loopback procedure. 
    To start the Data Terminal Eq uip ment (DTE) loop b ac k 
    at the 316X CSU or DSU/CSU, use the p roc ed ures in Table 3-14
    .
    11. Chec k for CSU 
    alarmsVerify that no alarms are against the CSU (the 
    OK, SIG, SIG LEDs are lit).
    12. Test the circ uit 
    packtest board 
    UUCSSVerify that the DS1 c irc uit p ac k p asses Tests 
    138 through 145. If these tests p ass and  this is 
    a new installation, go to Step  14.
    If any one of Test 138 through 145 fails, follow 
    the repair p roc ed ures listed  in DEFINITY ECS 
    Maintenanc e for R8r.
    After c learing  all errors, retest the c irc uit p ac k.
    13. Run error 
    rep ortlist 
    measurements 
    ds1 summary 
    UUCSSWait 15 minutes. Check the error rep ort and  
    verify that the DS1 c irc uit pac k is free of any 
    errors. 
    To interp ret the period ic list measurements 
    rep ort.
    14. DTE and  RLB 
    loopback tests
    (new 
    installations)Perform both DTE and  RLB loop bac k test at the 
    316X CSU or DSU/CSU to verify that the DS1 
    b oard  can succ essfully transmit and  receive a 
    DS1 sig nal through the sp litter to the 316X and  
    b ac k to the DS1 b oard . 
    Go to the ‘‘DTE loopback procedure’’ on page 
    3-27 and  ‘‘RLB loopback procedure’’ on page 
    3-28
    Table 3-14. DTE loopback testing for the 316X DSU/CSU 
    ÖStep Action Command Description
    1. Beg in the 
    loopback testPress the d oub le-up arrow b utton.
    2. Go throug h the 
    read out step sPress the b utton und er “ Test.”
    3. Continue Press the b utton und er “ Lp b k.”
    Continued on next page
    Table 3-13. Splitter installation to DS1 — Continued
    ÖStep Action Command Description
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-28 Synchronization Installation and Testing 
    3
    RLB loopback procedure . 
    To start the RLB loop b ac k testing  at the 316X CSU or 
    DSU/CSU, use the p roc ed ures in Table 3-15
    .
    4. ContinuePress the b utton und er “ DLB.”
    Test Started d isp lays. The 316X is now in 
    DTE loopb ack. 
    5. Test the circuit 
    packtest board 
    UUCSSAt the DEFINITY management terminal.
    If any one of Test 138 through 145 fails, follow 
    the rep air p roc edures listed in DEFINITY ECS 
    Maintenanc e for R8r.
    6. Run error 
    rep ortlist 
    measurements 
    ds1 summary 
    UUCSSWait 15 minutes and  verify that the DS1 circuit 
    p ack is free of any errors. 
    Use Table 3-6
     to interp ret the p eriodic  list 
    measurements rep ort.
    7. Terminate the 
    DTE loopback 
    testPress the d oub le-up arrow b utton.
    8. Go throug h the 
    read out step sPress the b utton und er “ test.”
    9. Continue Press the b utton und er “ lp b k.”
    10. Continue Press the b utton und er “ ab ort.”
    11. Continue Press the b utton und er “ all.”
    12. Continue test 
    p roced ureIf all tests pass, and  the splitter, cab ling, and  
    316X CSU or DSU/CSU are working p rop erly, 
    g o to the ‘‘RLB loopback procedure’’ on page 
    3-28. 
    Table 3-15. RLB loopback testing for the 316X DSU/CSU 
    ÖStep Action Command Description
    1. Start the test. Press the d oub le-up  arrow b utton.
    2. Go throug h the 
    readout step sPress the b utton under “ Test.”
    3. Continue Press the b utton under “ Lpb k.”
    Continued on next page
    Table 3-14. DTE loopback testing for the 316X DSU/CSU  — Continued
    ÖStep Action Command Description
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-29 Synchronization Installation and Testing 
    3
    4. ContinuePress the b utton under “ RLB.”
    Test Started d isp lays. The 316X is now in 
    RLB loop bac k. 
    5. Test the c irc uit 
    packtest board 
    UUCSSIf any one of Test 138 through 145 fails, follow 
    the repair p roc ed ures listed  in DEFINITY ECS 
    Maintenanc e for R8r.
    6. Run error 
    rep ortlist 
    measurements 
    d s1 summary 
    UUCSSWait 15 minute, then verify that the DS1 c irc uit 
    p ac k is free of any errors. 
    Use Table 3-6
     to interpret the p eriod ic  list 
    measurements rep ort.
    7. Terminate the 
    RLB loopb ac k 
    testPress the d oub le-up  arrow b utton.
    8. Go throug h the 
    readout step sPress the b utton under “ test.”
    9. Continue Press the b utton under “ lpb k.”
    10. Continue Press the b utton under “ abort.”
    11. Continue Press the b utton under “ all.”
    If all tests pass, and  the sp litter, cab ling, and  
    316X CSU or DSU/CSU are working p rop erly.
    12. Return 
    DSU/CSU to 
    servicePress the d oub le-up  arrow.
    13. Go throug h the 
    readout step sPress the right-arrow button until “ Cntrl”  
    displays.
    14. Continue Press the b utton under “ Cntrl.”
    15. Continue Press the b utton under “ LED.”
    16. Continue Press the b utton under the word  PRT1, PRT2, 
    PRT3 o r  PRT4  a s re q ui red .
    17. Verify that the 
    DSU/CSU is in 
    normal 
    op erating  
    mod e.Press the d oub le-up  arrow onc e, then p ress 
    the F1 button twic e. 
    ESF CSU 
    OPERATIONAL
     displays.
    Table 3-15. RLB loopback testing for the 316X DSU/CSU  — Continued
    ÖStep Action Command Description
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-30 Synchronization Installation and Testing 
    3
    Installing 401A, 402A, or 403A splitters 
    To install a 401A, 402A, or 403A sync  sp litter b etween the network and  a DS1 
    c irc uit p ac k, follow the p roc ed ures listed  in Table 3-16
    .
    Table 3-16. Splitter installation to DS1 (401A/402A/403A)
    ÖStep Action Command Description
    1. Disab le 
    sync hronization 
    switc hdisable 
    sync hronization
    -switc hPrevent the system from switc hing 
    sync hronization sources.
    2. Busyout DS1 
    circuit packb usyout board 
    UUCSSBusyout the d esig nated  DS1 circuit p ack.
    3. Ad minister 
    sync  sp litterchange DS1 
    UUCSSAd minister the sync splitter.
    For T1, set the 
    Near-end CSU Type: field  
    to integrated (see Screen 3-1
    ).
    For E1, set the 
    E1 Sync-Splitter? field  to 
    y (see Screen 3-2
    ).
    4. Remove c ab le 
    from DS1 
    circuit packRemove the c ab le from the amp henol 
    c onnector located on rear of the DS1 c irc uit 
    pack.
    5. Attach the 
    sp litterPlug the sp litter into the same c onnec tor just 
    vacated by the cable.
    6. Rec onnec t the 
    cablePlug the c able into the c onnec tor on the sp litter.
    7. Secure the 
    sp litterSec ure the splitter to the c arrier using  the larg e 
    mounting  strap  removed  from a fib er 
    transc eiver.
    8. Check 
    c onnectionCheck that the Amp henol connection is sec ure.
    9. Reseat DS1 
    circuit packRelease the clip  hold ing  the DS1 c irc uit pac k, 
    p ull out slightly, close c lip . 
    10. Release DS1 
    circuit packrelease b oard  
    UUCSSRestore the d esig nated  DS1 c ircuit p ack to 
    service.
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-31 Synchronization Installation and Testing 
    3
    11. Test the sp litter Use the p roc edure in ‘‘Splitter port tests 
    (401A/401A only)’’ on page 3-19.
    nBefore testing  the sp litter, insert a mod ular 
    RJ45 plug into jac k J1 and  jac k J2 
    (401A/402A only).
    NOTE:
    Do not connect p ort J1 to port J2. Leave 
    the other end of b oth c ord s free, b ec ause 
    the modular RJ45 p lug  acts as a op ening  
    p lug  and  removes the 100-W termination 
    from J1 and J2 p orts.
    The stand ard  RJ45-to-Bantam test cab le 
    d oes not work with the 403A. You need a 
    c oax-to-Bantam cab le or an ad apter for 
    the RJ45 connector.
    nAfter testing  is comp lete, remove the 
    op ening  plug s from J1 and  J2.
    12. Chec k the 7 
    DS1 LEDsAfter ab out 20 s, all the alarm LEDs on the DS1 
    g o out and  the status 3 LED is stead y g reen.
    If this is the c ase, c ontinue. If not, follow the DS1 
    sp an test p roc edures in the DEFINITY ECS 
    Maintenanc e for R8r.
    13. Test the circ uit 
    packtest board 
    UUCSSVerify that the DS1 c irc uit p ac k p asses Tests 
    138 through 146 and  1227. If these tests p ass 
    and  this is a new installation, continue.
    If any one of Test 138 through 146 fails, follow 
    the rep air p roc ed ures in DEFINITY ECS 
    Maintenanc e for R8r.
    After c learing  all errors, retest the c irc uit p ac k.
    14. Run error 
    rep ortlist 
    measurements 
    ds1 summary 
    UUCSSWait 15 minutes. Check the error rep ort and  
    verify that the DS1 c irc uit pac k is free of any 
    To interp ret the period ic list measurements 
    report, refer to 
    Table 3-16. Splitter installation to DS1 — Continued(401A/402A/403A)
    ÖStep Action Command Description
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-32 ATM Network Duplication 
    3
    Screen 3-1.DS1 circuit pack—T1
    Screen 3-2. DS1 circuit pack—E1
    ATM Network Duplication
    ATM-PNC c onfig urations without d uplic ated  SPEs c an b e sup p orted  with 
    d up lic ated  EPN c onnec tivity to other p oints on an ATM network, or ATM network 
    dup lic ation. These p oints c an b e on sep arate ATM switc hes, the same ATM 
    switc h, or d irec tly c onnec ted  to an ATM-WAN.
    add ds1 b10  Page 1 of 2
    DS1 CIRCUIT PACK
    Location: 01B10 Name: xxxxxxxxxxxxxxx
    Bit Rate: 1.544  Line Coding: b8zs
    Signaling Mode: isdn-pri
    Connect: line-side
    Country Protocol: 1
    Protocol Version: a
    Interface Companding: mulaw  CRC? n
    Idle Code: 11111111
    DCP/Analog Bearer Capability: 3.1kHz
    Slip Detection? n Near-end CSU Type: integrated
    Alarm When PRI Endpoint Detached? y
    add ds1 b10  Page 1 of 2
    DS1 CIRCUIT PACK
    Location: 01B10 Name: xxxxxxxxxxxxxxx
    Bit Rate: 2.048  Line Coding: hdb3
    Signaling Mode: isdn-pri
    Connect: line-side
    Country Protocol: 2
    Protocol Version: a
    Interface Companding: mulaw  CRC? n
    Idle Code: 11111111
    DCP/Analog Bearer Capability: 3.1kHz
    Slip Detection? n  Near-end CSU Type: other
    E1 Sync-Splitter? yAlarm When PRI Endpoint Detached? y 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-33 ATM Network Duplication 
    3
    With resp ec t to port network c onnec tivity, there is no d ifferenc e in p erformanc e 
    b etween ATM network d up lic ation and  c ritic al reliab ility. ATM network d up lic ation 
    configurations require
    nA s i m p le x SPE c o m p l e x  in  t h e  PPN
    nDup lic ate c onnec tivity over ATM to all PNs
    nDuplicate ATM interfaces in each EPN
    nDup lic ate Tone-Cloc k b oard s in eac h EPN.
    An ATM network d up lic ation c onfig uration c an b e the result of 
    nA new installation
    nAn up g rad e from a stand ard  reliab ility system
    The EPN c onfig uration for ATM network d up lic ation is the same as for an EPN 
    eq uip p ed  for ATM c ritic al reliab ility (Figure 3-9
    ). 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-34 ATM Network Duplication 
    3
    Figure 3-9. EPN configuration with ATM network duplicationFigure Notes
    1 . D EFI N ITY EC S PPN 1
    2. Fib er c onnec ting  ATM-EI A to ATM switc h A
    3. Fib er c onnec ting  ATM-EI B to ATM switc h B
    4. Luc ent ATM switc h A
    5. Luc ent ATM switc h B6. Fib er c onnec ting  ATM switc h A to EPNs
    7. Fib er c onnec ting  ATM switc h B to EPNs
    8 . D EFI N I TY EC S EPN 1
    9. DEFINITY ECS PPN2
    1 0 . D EFI N I TY EC S EPN 2
    cydasmpx LJK 020100
    1
    2
    3
    4
    5
    6
    6
    6
    7
    7
    7
    8
    9
    10 
    						