    Have a look at the manual Lucent Technologies Definity Release 8.2 Atm Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-15 Synchronization Installation and Testing 
    3
    Table 3-4 lists the sp litter mod el(s) ap p lic ab le to sp ec ific  c ountries.
    Table 3-4. Country-specific splitter applications
    CountrySplitter model
    400A/401A
    T1
    100 W402A
    E1
    120 W403A
    E1
    75 W
    Argentina Y
    Australia Y
    Austria Y Y
    Bahrain Y Y
    Belg ium Y Y
    Brazil Y
    Canad a Y
    China Y
    Columb ia Y
    Denmark Y Y
    Eg y p t Y Y
    Finland Y Y
    France Y Y
    Germany Y Y
    Hong  Kong Y
    Ind ia Y Y
    Ind onesia Y Y
    Ireland Y Y
    Italy Y Y
    Jap an
    1
    Korea Y Y
    Luxembourg Y Y
    Malaysia Y Y
    Mexic o Y
    Netherland s Y Y
    New Zealand Y Y
    Norway Y Y
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-16 Synchronization Installation and Testing 
    3
    Philip p ines Y Y
    Pol an d Y Y
    Portugal Y Y
    Rus si a Y Y
    Saud i Arabia Y Y
    Sing ap ore Y
    Sou t h A f r ic a Y Y
    Sp a i n Y Y
    Sri Lanka Y Y
    Sw ed e n Y Y
    Sw it z er l an d Y Y
    Ta i w a n Y Y
    Ukraine Y Y
    UAE Y Y
    UK Y Y
    USA Y
    Uzb ekistan Y Y
    Vie t na m Y Y
    1. Jap an uses b oth 75-W and  120-W T1; 402A and  403A sync  
    sp litters will also work with T1s. Table 3-4. Country-specific splitter applications — 
    Continued
    CountrySplitter model
    400A/401A
    T1
    100 W402A
    E1
    120 W403A
    E1
    75 W
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-17 Synchronization Installation and Testing 
    3
    Verify the DS1 service
    To verify the DS1 servic e, use the p roc ed ure in Table 3-5. Have the ATM switch 
    installer verify the synchronization sourc e.
    Table 3-5. T1 or E1 service verification procedure
    ÖStep Action Command Description
    1. Chec k timing  
    signalChec k that the GREEN STATUS 3 LED on the 
    d esignated  DS1 c irc uit p ac k is on stead y.
    2. Test the DS1 
    circuit packtest board 
    UUCSSTest the d esig nated  DS1 b oard.
    If any one of Test 138 throug h 145 fails, follow the 
    rep air p roc ed ures listed  in DEFINITY ECS Maintenanc e 
    for R8r.
    3. Run error rep ort list 
    measurements 
    ds1 
    UUCSS 
    summaryVerify that the rep ort is free of errors. 
    See Table 3-6 to help  interp ret the rep ort.
    4. Id entify ac tive 
    sync hronization 
    sourc estatus 
    sync hronizationVerify that the d esig nated DS1 c irc uit p ac k is the ac tive 
    sync  sourc e.
    Note
    : The DS1c irc uit p ac k is not the sync  sourc e; it 
    simp ly shows where the sync  sp litter is c onnec ted .
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-18 Synchronization Installation and Testing 
    3
    Table 3-6. Interpretation of the list measurements report 
    Displayed 
    Field Function Indication
    Test: 
    cpe-loopbac
    k-jack3-in-24 stress 
    test patternThe loop b ac k jac k test is ac tive
    Synchronize
    d= Y
    = NThe DS1 c irc uit p ac k is sync hronized  to the loop ed  
    3-in-24 p attern and  is c ounting  the b it errors d etec ted  
    in the p attern until the test is end ed .
    Retry the test:
    1. Stop  the test (test ds1-loop 
    UUCSS end 
    cpe-loopback-jack-test
    ).
    2. Restart the test (test ds1-loop 
    UUCSS 
    cpe-loopback-jack-test-begin
    )
    3. Rep eat Steps 1 and  2 a maximum of 5 times, as 
    necessary. 
    If the c irc uit p ac k never sync hronizes, it is p ossib ly 
    d ue to intermittent c onnec tions or a b roken wire in a 
    rec eive or transmit wire p air.
    Bit Error 
    CountCumulative 
    detected 
    errors0 ind ic ates that there are no wiring  p rob lems.
    A c ount that sits at 65535 or c ontinues to inc rement 
    b y several hund red  to several thousand errors with 
    eac h sub seq uent list measurements
     command 
    indic ates
    nIntermittent or c orrod ed  c onnec tions
    nSevere c rosstalk
    nImp ed anc e imb alanc es b etween the two 
    c ond uc tors of the rec eive or the transmit p airs. 
    1. Rep lac e wiring , if nec essary.
    2. Note whether the Extend ed  Sup er Frame (ESF) 
    error and p erformanc e c ounters summaries 
    (errored  sec ond s, b ursty errored  sec ond s, and  so 
    forth) also inc rement. Althoug h these c ounters are 
    not used  with the loop b ac k jac k test, they d o 
    inc rement as errors oc c ur. 
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-19 Synchronization Installation and Testing 
    3
    Installing and testing the splitter
    The sp litter must be installed  and  tested  b efore the up g rad e and  c utover. The 
    p urp ose of testing  the sp litter is to
    nProve that there is enoug h sig nal level for the c ab le leng th to the ATM 
    switc h:
    — up  to 130 ft. (39.65 m) for 400A
    — within the stand ard  6 d B allowab le loss for 401A, 402A, and  403A 
    (see Table 3-3
    )
    nEnsure that the DS1 c irc uit pac k func tions p rop erly while rec eiving  the 
    DS1 sig nal level outp ut from the sp litter (Ports J1 and  J2 unterminated ).
    Table 3-7
     shows the configurations of the test cable and ports on the sync 
    sp litter.
    Splitter port tests (401A/401A only)
    NOTE:
    The stand ard  RJ45-to-Bantam test c ab le d oes not work with the 403A.
    To test the sp litter p orts J1 or J2, use the p roc ed ures in Table 3-8
    , using  the RJ45 
    to Bantam Test c able from the 1541CC c ab le kit.
    Table 3-7. Cable and port configurations for splitter tests 
    To test Description
    Port J1 Insert an op ening  p lug  into p ort J2
    Port J2 Insert an op ening  p lug  into p ort J1
    Maximum outp ut of the sp litter 
    to the DS1 c irc uit pac kInsert an opening plug into both ports J1 and J2
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-20 Synchronization Installation and Testing 
    3
    Installing a 400A T1 splitter
    NOTE:
    Make sure you are c onnec ted  to the network b efore c onnec ting  to the 
    DEFINITY ECS.
    Onc e the sync  sp litter p asses the DS1 sp an tests, it c an b e installed  and  tested  
    in p lac e. The 400A sync  sp litter c an b e either
    nConnected through an ICSU
    nConnected through a DSU/CSU.
    NOTE:
    If using  a TN464F/TN767E v18 or earlier, you must reseat the c irc uit p ac k 
    eac h time the splitter is p lug g ed  on.
    Table 3-8. Testing the splitter ports
    ÖStep Action Command Description
    1. Terminate one 
    or more p ortsPlug the RJ45 (modular) end  of the DS1 test c ab le 
    into the jac k (J1 or J2) you wish to test on the 
    sp litter.
    2. Connect to 
    DS1 c ircuit 
    packPlug the Bantam Plug  end  (p lug  with the b lac k 
    band) of the DS1 test c ab le into the Equipment-In 
    (EI) jac k on the DS1 c irc uit p ac k facep late.
    3. Test 
    DS1circuit 
    packtest board 
    UUCSSWait 30 sec ond s, then test the c irc uit pac k.
    If any tests fail, wait 5 minutes and test the DS1 
    c irc uit p ac k ag ain.
    4. Replace 
    splitter if 
    nec essaryIf any test still fails, rep lac e the splitter and  retest.
    5. Esc alate if 
    nec essaryIf the test still fails, esc alate to Tier 3.
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-21 Synchronization Installation and Testing 
    3
    Connected through an ICSU. 
    Use the p roc ed ures in Table 3-9 to install the 
    sp litter b etween an ICSU and  a DS1 c irc uit p ac k.
    Table 3-9. Installing the splitter through an ICSU 
    ÖStep Action Command Description
    1. Disab le 
    sync hronization 
    switc hdisable 
    sync hronization
    -switc h Prevent the system from switc hing  sync hronization 
    sourc es.
    2. Busyout DS1 
    circuit packb usyout board 
    UUCSSBusyout the designated  DS1c irc uit p ac k.
    3. Remove c able 
    from DS1 c irc uit 
    pack Remove the existing  H600-307 cable from the b ac kplane 
    slot c orresp ond ing to the d esig nated  DS1 c irc uit pac k.
    4. Remove ICSURemove the ICSU from the d esig nated  DS1 c irc uit pac k’s 
    amp henol c onnec tor.
    Re-use the existing  c ab le attac hed to the ICSU. 
    5. Attac h sp litter Plug  the splitter into the same c onnec tor just vac ated  b y 
    the ICSU.
    6. Attac h ICSU Plug  the ICSU into the c onnec tor on the sp litter.
    7. Rec onnec t 
    cableConnec t the H600-307 c ab le to the amp henol c onnec tor 
    on the ICSU.
    8. Chec k 
    c onnec tionsChec k that all Amp henol c onnec tions are good .
    9. Sec ure splitter Sec ure the sp litter to the c arrier using the 4C retainer from 
    the ICSU.
    10. Sec ure ICSU Sec ure the ICSU to the sp litter with a long  c ab le tie.
    11. Terminate the 
    sp litter p orts J1 
    and J2Insert a modular RJ45 p lug in b oth p orts J1 and J2. Do not 
    c onnec t p ort J1 to p ort J2, but leave the other end  of b oth 
    c ord s free. The mod ular RJ45 plug  ac ts as an op ening  
    p lug  and  removes the 100-W termination from port J1 and 
    J2 on the sp litter. 
    12. Chec k DS1 
    Status 3 LEDAfter about 20 sec onds the LEDs on the DS1 c irc uit p ac k 
    should g o out, leaving  only the GREEN STATUS 3 LED on.
    13. Test the DS1 
    circuit packtest b oard  
    UUCSSTest the c irc uit p ac k.
    If any one of Tests 138 - 145 fails, follow the repair 
    p roc ed ures listed  in DEFINITY ECS Maintenanc e for R8r
    14. Clear the error 
    events c ountersc lear 
    measurements 
    ds1 
    esf-error-events 
    UUCSSClear the error events c ounter.
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-22 Synchronization Installation and Testing 
    3
    Test the 120A ICSU with either a 700A DS1 CPE loop bac k jac k or a 103A b loc k. 
    Use the p roc ed ure in Table 3-10
     to test a sp litter c onnec ted  throug h an ICSU.
    15. Run rep ort list 
    measurements 
    d s1 summary 
    UUCSSWait 15 minutes b efore entering  the c ommand.
    If the DS1 c irc uit p ac k is not error-free, refer to 
    ‘‘Troubleshooting synchronization (400A only)’’ on page 
    6-17.
    16. Replace 
    c onnec tionsAfter testing  is c omp lete, remove the modular RJ45 
    op ening  p lug s from p ort J1 and  J2 of the sp litter, and 
    rec onnec t the c ab les to the port(s).
    17. Test the ICSU Dep end ing  on the ICSU mod el, g o to the app rop riate 
    sec tion:
    n Testing  the 120A ICSU (Table 3-10)
    nTesting  the 120A 2 ICSU (Table 3-11)
    Table 3-10. The 120A ICSU test procedure
    ÖStep Action Command Description
    1. Connec t 103A 
    b loc k if 
    nec essaryIf the 700A DS1 CPE Loop b ac k Jac k is not installed  or if 
    the ICSU is not a 120A:
    nConnec t a 103A bloc k at the Smart Jac k end  of the 
    H600-383 c able. 
    nOn the 103A b loc k, strap  p in1 to pin 3 and  pin 2 to 
    p in 4, whic h p rovid es a loop b ac k to the ICSU.1
    2. Test the DS1 
    circuit packtest b oard  UUCSS Test the DS1 c irc uit p ac k.
    If any one of Tests 138 throug h 145 fails, follow the rep air 
    p roc edures listed in DEFINITY ECS Maintenanc e for R8r
    3. Clear the error 
    events 
    c ountersc lear 
    measurements 
    ds1 
    esf-error-events 
    UUCSSClear the error events c ounters.
    4. Run report list measurements 
    d s1 summary 
    UUCSSWait 15 minutes b efore entering  the c ommand .
    To interp ret the results, refer to Table 3-6
    .
    If the DS1 c irc uit pac k is not error-free, refer to 
    ‘‘Troubleshooting synchronization (400A only)’’ on page 
    6-17.
    5. Remove the 
    103A b loc kRemove the 103A b loc k from Step  1.
    Continued on next page
    Table 3-9. Installing the splitter through an ICSU  — Continued
    ÖStep Action Command Description
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-23 Synchronization Installation and Testing 
    3
    6.Rec onnec t the 
    cableConnec t the H600-383 c able to the smart jac k or dumb  
    block.
    1. For more information about Smart Jac k CPE Testing , see DEFINITY ECS Release 8 
    Maintenanc e for R8r, Chap ter 6, “ DS1 CPE Loop b ac k Jac k Installation and  Op erations 
    Instruc tions.”
    Table 3-10. The 120A ICSU test procedure — Continued
    ÖStep Action Command Description
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 ATM Installation,
    Upgrades, and Administration  555-233-124  Issue 1
    April 2000
    Installing a DEFINITY ECS ATM-PNC 
    3-24 Synchronization Installation and Testing 
    3
    Use the p roc ed ures in Table 3-11 to test the 120A ICSU with the 700A DS1 CPE 
    loopback jack.
    Connected through a DSU/CSU. 
    Before c onnec ting  any of the timing  hard ware, 
    ensure that the DSU/CSU is c onfigured  to report loss of sig nal alarms.
    If using  a 316X CSU c onnec ted  to a T1 fac ility and  used  as the DEFINITY 
    sync hronization sourc e, verify or c hang e the 316X setting s (op tions) to ensure 
    that it send s an AIS b lue alarm to the DEFINITY ECS DS1 c irc uit p ac k or to the 
    ATM switc h whenever a network LOS (loss of sig nal) oc c urs. Up on rec eiving  a 
    LOS, the DEFINITY ECS or ATM switc h transfers to its bac kup  sync hronization 
    sourc e.
    Table 3-11. Testing the 120A 2 ICSU 
    ÖStep Action Command Description
    1. Busyout the 
    DS1 c irc uit p ac kb usyout b oard  
    UUCSSBusyout the DS1 c irc uit pac k.
    2. Start the CPE 
    loopback test test d s1-loop 
    UUCSS 
    c pe-loop b ac k-
    jack-test-beginStart the CPE loop bac k test.
    nIf the test p asses, the splitter is func tioning  
    prop erly; go to Step  3.
    nIf the test fails, follow the p roc edures in ‘‘Troubleshooting synchronization (400A 
    only)’’ on page 6-17.
    3. Terminate the 
    testtest d s1-loop 
    UUCSS 
    end-loopback/
    span-testTerminate the test .
    4. Release the 
    DS1 c irc uit p ac krelease b oard  
    UUCSSRelease the DS1 c irc uit pac k .
    5. Reassig n 
    sync hronizationc hange 
    sync hronizationReassig n sync  to the designated  DS1 c irc uit p ac k .
    Continued on next page 
    						