Have a look at the manual Lucent Technologies Definity Release 8.2 Atm Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-15 Synchronization Installation and Testing 3 Table 3-4 lists the sp litter mod el(s) ap p lic ab le to sp ec ific c ountries. Table 3-4. Country-specific splitter applications CountrySplitter model 400A/401A T1 100 W402A E1 120 W403A E1 75 W Argentina Y Australia Y Austria Y Y Bahrain Y Y Belg ium Y Y Brazil Y Canad a Y China Y Columb ia Y Denmark Y Y Eg y p t Y Y Finland Y Y France Y Y Germany Y Y Hong Kong Y Ind ia Y Y Ind onesia Y Y Ireland Y Y Italy Y Y Jap an 1 Korea Y Y Luxembourg Y Y Malaysia Y Y Mexic o Y Netherland s Y Y New Zealand Y Y Norway Y Y Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-16 Synchronization Installation and Testing 3 Philip p ines Y Y Pol an d Y Y Portugal Y Y Rus si a Y Y Saud i Arabia Y Y Sing ap ore Y Sou t h A f r ic a Y Y Sp a i n Y Y Sri Lanka Y Y Sw ed e n Y Y Sw it z er l an d Y Y Ta i w a n Y Y Ukraine Y Y UAE Y Y UK Y Y USA Y Uzb ekistan Y Y Vie t na m Y Y 1. Jap an uses b oth 75-W and 120-W T1; 402A and 403A sync sp litters will also work with T1s. Table 3-4. Country-specific splitter applications — Continued CountrySplitter model 400A/401A T1 100 W402A E1 120 W403A E1 75 W Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-17 Synchronization Installation and Testing 3 Verify the DS1 service To verify the DS1 servic e, use the p roc ed ure in Table 3-5. Have the ATM switch installer verify the synchronization sourc e. Table 3-5. T1 or E1 service verification procedure ÖStep Action Command Description 1. Chec k timing signalChec k that the GREEN STATUS 3 LED on the d esignated DS1 c irc uit p ac k is on stead y. 2. Test the DS1 circuit packtest board UUCSSTest the d esig nated DS1 b oard. If any one of Test 138 throug h 145 fails, follow the rep air p roc ed ures listed in DEFINITY ECS Maintenanc e for R8r. 3. Run error rep ort list measurements ds1 UUCSS summaryVerify that the rep ort is free of errors. See Table 3-6 to help interp ret the rep ort. 4. Id entify ac tive sync hronization sourc estatus sync hronizationVerify that the d esig nated DS1 c irc uit p ac k is the ac tive sync sourc e. Note : The DS1c irc uit p ac k is not the sync sourc e; it simp ly shows where the sync sp litter is c onnec ted . Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-18 Synchronization Installation and Testing 3 Table 3-6. Interpretation of the list measurements report Displayed Field Function Indication Test: cpe-loopbac k-jack3-in-24 stress test patternThe loop b ac k jac k test is ac tive Synchronize d= Y = NThe DS1 c irc uit p ac k is sync hronized to the loop ed 3-in-24 p attern and is c ounting the b it errors d etec ted in the p attern until the test is end ed . Retry the test: 1. Stop the test (test ds1-loop UUCSS end cpe-loopback-jack-test ). 2. Restart the test (test ds1-loop UUCSS cpe-loopback-jack-test-begin ) 3. Rep eat Steps 1 and 2 a maximum of 5 times, as necessary. If the c irc uit p ac k never sync hronizes, it is p ossib ly d ue to intermittent c onnec tions or a b roken wire in a rec eive or transmit wire p air. Bit Error CountCumulative detected errors0 ind ic ates that there are no wiring p rob lems. A c ount that sits at 65535 or c ontinues to inc rement b y several hund red to several thousand errors with eac h sub seq uent list measurements command indic ates nIntermittent or c orrod ed c onnec tions nSevere c rosstalk nImp ed anc e imb alanc es b etween the two c ond uc tors of the rec eive or the transmit p airs. 1. Rep lac e wiring , if nec essary. 2. Note whether the Extend ed Sup er Frame (ESF) error and p erformanc e c ounters summaries (errored sec ond s, b ursty errored sec ond s, and so forth) also inc rement. Althoug h these c ounters are not used with the loop b ac k jac k test, they d o inc rement as errors oc c ur. Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-19 Synchronization Installation and Testing 3 Installing and testing the splitter The sp litter must be installed and tested b efore the up g rad e and c utover. The p urp ose of testing the sp litter is to nProve that there is enoug h sig nal level for the c ab le leng th to the ATM switc h: — up to 130 ft. (39.65 m) for 400A — within the stand ard 6 d B allowab le loss for 401A, 402A, and 403A (see Table 3-3 ) nEnsure that the DS1 c irc uit pac k func tions p rop erly while rec eiving the DS1 sig nal level outp ut from the sp litter (Ports J1 and J2 unterminated ). Table 3-7 shows the configurations of the test cable and ports on the sync sp litter. Splitter port tests (401A/401A only) NOTE: The stand ard RJ45-to-Bantam test c ab le d oes not work with the 403A. To test the sp litter p orts J1 or J2, use the p roc ed ures in Table 3-8 , using the RJ45 to Bantam Test c able from the 1541CC c ab le kit. Table 3-7. Cable and port configurations for splitter tests To test Description Port J1 Insert an op ening p lug into p ort J2 Port J2 Insert an op ening p lug into p ort J1 Maximum outp ut of the sp litter to the DS1 c irc uit pac kInsert an opening plug into both ports J1 and J2 Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-20 Synchronization Installation and Testing 3 Installing a 400A T1 splitter NOTE: Make sure you are c onnec ted to the network b efore c onnec ting to the DEFINITY ECS. Onc e the sync sp litter p asses the DS1 sp an tests, it c an b e installed and tested in p lac e. The 400A sync sp litter c an b e either nConnected through an ICSU nConnected through a DSU/CSU. NOTE: If using a TN464F/TN767E v18 or earlier, you must reseat the c irc uit p ac k eac h time the splitter is p lug g ed on. Table 3-8. Testing the splitter ports ÖStep Action Command Description 1. Terminate one or more p ortsPlug the RJ45 (modular) end of the DS1 test c ab le into the jac k (J1 or J2) you wish to test on the sp litter. 2. Connect to DS1 c ircuit packPlug the Bantam Plug end (p lug with the b lac k band) of the DS1 test c ab le into the Equipment-In (EI) jac k on the DS1 c irc uit p ac k facep late. 3. Test DS1circuit packtest board UUCSSWait 30 sec ond s, then test the c irc uit pac k. If any tests fail, wait 5 minutes and test the DS1 c irc uit p ac k ag ain. 4. Replace splitter if nec essaryIf any test still fails, rep lac e the splitter and retest. 5. Esc alate if nec essaryIf the test still fails, esc alate to Tier 3. Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-21 Synchronization Installation and Testing 3 Connected through an ICSU. Use the p roc ed ures in Table 3-9 to install the sp litter b etween an ICSU and a DS1 c irc uit p ac k. Table 3-9. Installing the splitter through an ICSU ÖStep Action Command Description 1. Disab le sync hronization switc hdisable sync hronization -switc h Prevent the system from switc hing sync hronization sourc es. 2. Busyout DS1 circuit packb usyout board UUCSSBusyout the designated DS1c irc uit p ac k. 3. Remove c able from DS1 c irc uit pack Remove the existing H600-307 cable from the b ac kplane slot c orresp ond ing to the d esig nated DS1 c irc uit pac k. 4. Remove ICSURemove the ICSU from the d esig nated DS1 c irc uit pac k’s amp henol c onnec tor. Re-use the existing c ab le attac hed to the ICSU. 5. Attac h sp litter Plug the splitter into the same c onnec tor just vac ated b y the ICSU. 6. Attac h ICSU Plug the ICSU into the c onnec tor on the sp litter. 7. Rec onnec t cableConnec t the H600-307 c ab le to the amp henol c onnec tor on the ICSU. 8. Chec k c onnec tionsChec k that all Amp henol c onnec tions are good . 9. Sec ure splitter Sec ure the sp litter to the c arrier using the 4C retainer from the ICSU. 10. Sec ure ICSU Sec ure the ICSU to the sp litter with a long c ab le tie. 11. Terminate the sp litter p orts J1 and J2Insert a modular RJ45 p lug in b oth p orts J1 and J2. Do not c onnec t p ort J1 to p ort J2, but leave the other end of b oth c ord s free. The mod ular RJ45 plug ac ts as an op ening p lug and removes the 100-W termination from port J1 and J2 on the sp litter. 12. Chec k DS1 Status 3 LEDAfter about 20 sec onds the LEDs on the DS1 c irc uit p ac k should g o out, leaving only the GREEN STATUS 3 LED on. 13. Test the DS1 circuit packtest b oard UUCSSTest the c irc uit p ac k. If any one of Tests 138 - 145 fails, follow the repair p roc ed ures listed in DEFINITY ECS Maintenanc e for R8r 14. Clear the error events c ountersc lear measurements ds1 esf-error-events UUCSSClear the error events c ounter. Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-22 Synchronization Installation and Testing 3 Test the 120A ICSU with either a 700A DS1 CPE loop bac k jac k or a 103A b loc k. Use the p roc ed ure in Table 3-10 to test a sp litter c onnec ted throug h an ICSU. 15. Run rep ort list measurements d s1 summary UUCSSWait 15 minutes b efore entering the c ommand. If the DS1 c irc uit p ac k is not error-free, refer to ‘‘Troubleshooting synchronization (400A only)’’ on page 6-17. 16. Replace c onnec tionsAfter testing is c omp lete, remove the modular RJ45 op ening p lug s from p ort J1 and J2 of the sp litter, and rec onnec t the c ab les to the port(s). 17. Test the ICSU Dep end ing on the ICSU mod el, g o to the app rop riate sec tion: n Testing the 120A ICSU (Table 3-10) nTesting the 120A 2 ICSU (Table 3-11) Table 3-10. The 120A ICSU test procedure ÖStep Action Command Description 1. Connec t 103A b loc k if nec essaryIf the 700A DS1 CPE Loop b ac k Jac k is not installed or if the ICSU is not a 120A: nConnec t a 103A bloc k at the Smart Jac k end of the H600-383 c able. nOn the 103A b loc k, strap p in1 to pin 3 and pin 2 to p in 4, whic h p rovid es a loop b ac k to the ICSU.1 2. Test the DS1 circuit packtest b oard UUCSS Test the DS1 c irc uit p ac k. If any one of Tests 138 throug h 145 fails, follow the rep air p roc edures listed in DEFINITY ECS Maintenanc e for R8r 3. Clear the error events c ountersc lear measurements ds1 esf-error-events UUCSSClear the error events c ounters. 4. Run report list measurements d s1 summary UUCSSWait 15 minutes b efore entering the c ommand . To interp ret the results, refer to Table 3-6 . If the DS1 c irc uit pac k is not error-free, refer to ‘‘Troubleshooting synchronization (400A only)’’ on page 6-17. 5. Remove the 103A b loc kRemove the 103A b loc k from Step 1. Continued on next page Table 3-9. Installing the splitter through an ICSU — Continued ÖStep Action Command Description Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-23 Synchronization Installation and Testing 3 6.Rec onnec t the cableConnec t the H600-383 c able to the smart jac k or dumb block. 1. For more information about Smart Jac k CPE Testing , see DEFINITY ECS Release 8 Maintenanc e for R8r, Chap ter 6, “ DS1 CPE Loop b ac k Jac k Installation and Op erations Instruc tions.” Table 3-10. The 120A ICSU test procedure — Continued ÖStep Action Command Description Continued on next page
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Installing a DEFINITY ECS ATM-PNC 3-24 Synchronization Installation and Testing 3 Use the p roc ed ures in Table 3-11 to test the 120A ICSU with the 700A DS1 CPE loopback jack. Connected through a DSU/CSU. Before c onnec ting any of the timing hard ware, ensure that the DSU/CSU is c onfigured to report loss of sig nal alarms. If using a 316X CSU c onnec ted to a T1 fac ility and used as the DEFINITY sync hronization sourc e, verify or c hang e the 316X setting s (op tions) to ensure that it send s an AIS b lue alarm to the DEFINITY ECS DS1 c irc uit p ac k or to the ATM switc h whenever a network LOS (loss of sig nal) oc c urs. Up on rec eiving a LOS, the DEFINITY ECS or ATM switc h transfers to its bac kup sync hronization sourc e. Table 3-11. Testing the 120A 2 ICSU ÖStep Action Command Description 1. Busyout the DS1 c irc uit p ac kb usyout b oard UUCSSBusyout the DS1 c irc uit pac k. 2. Start the CPE loopback test test d s1-loop UUCSS c pe-loop b ac k- jack-test-beginStart the CPE loop bac k test. nIf the test p asses, the splitter is func tioning prop erly; go to Step 3. nIf the test fails, follow the p roc edures in ‘‘Troubleshooting synchronization (400A only)’’ on page 6-17. 3. Terminate the testtest d s1-loop UUCSS end-loopback/ span-testTerminate the test . 4. Release the DS1 c irc uit p ac krelease b oard UUCSSRelease the DS1 c irc uit pac k . 5. Reassig n sync hronizationc hange sync hronizationReassig n sync to the designated DS1 c irc uit p ac k . Continued on next page