Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Have a look at the manual Lucent Technologies Definity Release 8.2 Atm Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-37 Troubleshooting ATM-PNC 6 ATM call control Are ATM signaling connections being setup to ATM switch Call Control? The UBR virtual c irc uits b etween the ATM switc h PPN p ort and ATM switc h p ort and b etween the EPN p ort and ATM switc h p ort are ATM sig naling c hannels b etween the p ort network and the ATM switc h. They are used to req uest c onnec tion setup s and releases to other end p oints suc h as another p ort network. These are estab lished b y eac h TN2305/TN2306 when it c omes up, indep end ent of DEFINITY Call Proc essing. Other UBR virtual c irc uits may exist b etween ATM switc h p orts that are not assoc iated with DEFINITY p ort networks and may b e sig naling c hannels for other ap p lic ations (for examp le, d ata network traffic ). Call processing (CaPro) Layer Are control channels being established from the PPN to the EPN? Diagnostics. nDo you g et a d ial tone on a set on the port network in q uestion? nCan you ring a set on the EPN d ialing from the PPN and vic e-versa? Table 6-11. Observed Cause Codes Cause Code Definition Observed Cause 3 No route to d estination The ATM add resses ad ministered in the ATM switch or in DEFINITY (display atm pnc) are inc orrec t. 31 Normal, unsp ec ified This is a normal return. 41 Temp orary failureThis “ try ag ain later” cause c od e has been observed when the sourc e of the p roblem is on another port (for example, a routing prob lem on another p ort that d isp lays c ause c od e 3). 47 Resourc es unavailab le, unsp ec ifiedDEFINITY c all volume is too high for the available resources in the ATM network. 63 Service or option unavailab le, unsp ec ifiedDEFINITY c all volume is too high for the available resources in the ATM network.
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-38 Troubleshooting ATM-PNC 6 Are talk paths being established between port networks? Diagnostics. nCan you talk b oth ways on a set on one p ort network d ialed from another port network and vice versa? — The CBR (Constant Bit Rate) virtual c irc uits (VCs) b etween ATM switc h PPN p ort and ATM switc h EPN p ort are used for talk p aths b etween p ort networks (PPN to EPN, EPN to PPN, or EPN to EPN). — They are estab lished when c alls are first setup between p ort networks. Eac h virtual c irc uit rep resents one p arty of a c omp lete multip arty talk p ath. — These virtual c irc uits may p ersist b eyond the d uration of a p hone call. The DEFINITY Call Processing software saves virtual circuits for a few sec ond s after the end stations have hung up in c ase the VC c an b e used ag ain for another c all b etween the same two p ort networks. Also, c hec k 3-way c onferenc e c alling ac ross 3 port networks. — There may b e other CBR virtual c irc uits between ATM switc h p orts that are not assoc iated with DEFINITY p ort networks. A c ommon CBR ap p lic ation is Circ uit Emulation, in whic h T-1, T-3, and so forth c irc uits are c arried over ATM. Unusual ATM trouble conditions A few failure mod es in the DEFINITY ECS/ATM switc h c omb ination are p artic ularly d iffic ult to d iag nose. One examp le mig ht b e that you c annot make a completely succ essful c all even though most indications from DEFINITY ECS and the ATM switch look good. This sec tion d oc uments some hints and c lues that may help d iag nose the following failure mod es: nIncorrectly typed or omitted EPN route or end system identifier (ATM switch) nSwapped routes, end system identifiers, or fiber between a PPN and an EPN nSwapped routes, end system identifiers, or fiber between A- and B-side TN2305/TN2306s on EPN nSwapped routes, end system identifiers, or fiber between two EPNs
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-39 Troubleshooting ATM-PNC 6 Incorrectly typed or omitted EPN route or end system identifier (ATM switch) Symptoms Talk p aths are one-way, from the PPN to the EPN: you c an hear tones from the PPN end station to the EPN end station b ut not vic e versa. Bec ause the sig naling c hannels are b id irec tional virtual c irc uits (VCs) estab lished from the PPN to the EPN, these c an b e routed c orrec tly and c ome up just fine. Talk p aths are two unid irec tional virtual c irc uits, so a sing le c all has one VC from the PPN to the EPN (whic h is routed c orrec tly) and one VC from the EPN to the PPN (whic h c annot b e routed ). Diagnostics 1. At the ATM switc h, c hec k the ATM ad dresses. 2. Look for a c ause c od e 3 (No route to destination ). Action 1. Correc t the ATM ad d ress translations in the ATM switc h. Swapped routes, end system identifiers, or fiber between a PPN and an EPN Symptoms nAn inc orrec tly c onnec ted EPN TN2305/TN2306 c irc uit p ac k is not c omp letely inserted . nDial tone is p resent on end stations on the PPN and on c orrec tly c onnec ted EPNs, b ut no d ial tone is p resent on the affec ted EPN end stations. nCalls c annot b e mad e b etween the PPN and the c orrec tly c onnec ted EPNs b ec ause talk p aths c annot b e routed c orrec tly. Diagnostics 1. Chec k to see if the ATM switc h shows VBR c ontrol c hannels from the ATM switc h p ort intend ed for the inc orrec tly c onnec ted EPN (b ut ac tually c onnec ted log ic ally or p hysic ally to the PPN) that should not exist. Action 1. Correc t the ATM ad d resses (or swap fibers) on the ATM switc h b etween the inc orrec tly c onnec ted PPN and EPN.
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-40 Troubleshooting ATM-PNC 6 Swapped routes, end system identifiers, or fiber between two EPNs Symptoms nAll TN2305/TN2306 c irc uit pac ks are c ompletely inserted . nThe PPN c old starts b oth inc orrec tly c onnec ted EPNs as usual. nBo t h EPN s lo g m a n y WRONG BOARD INSERTED errors (list configuration all or display circuit-packs carrier), p rovid ing the EPNs ac tually d o have d ifferent c irc uit p ac ks c onfig ured in the same slots. nSome end stations may work if they are c onnec ted to the c orrec t c irc uit p ac k in the same slot on b oth EPNs. Otherwise, end stations on the PPN have dial tone, while end stations on the EPNs d o not. nAll ATM switc h d iag nostic c ommand s look g ood . Diagnostics 1. Check log for WRONG BOARD INSERTED errors (list configuration all or display circuit-packs carrier). Action 1. Correc t the ATM ad d resses (or swap fibers) on the ATM switc h b etween the inc orrec tly c onnec ted EPNs. Swapped routes, end system identifiers, or fiber between A- and B-side TN2305/TN2306s on EPN Symptoms nThe PPN estab lishes links to what it thinks is the ac tive TN2305/TN2306 c irc uit p ac k on the EPN. nAs normal, it reb oots this TN2305/TN2306 c irc uit p ac k, and when c omp lete, it resets the EPN. When this hap p ens, the ac tive (instead of the stand b y) TN2305/TN2306 c irc uit p ac k reboots, d ropp ing the links. nTo rec over, the PPN re-estab lishes links to what it thinks is the ac tive TN2305/TN2306 c irc uit p ac k and the c yc le repeats ind efinitely. Diagnostics 1. Type status pnc and p ress En t e r. The screen shows both the A-side and B-sid e State of Health field as partially functional . Action 1. Correc t the ATM ad d resses (or swap fibers) on the ATM switc h b etween the A and B side of the EPN.
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-41 Troubleshooting ATM-PNC 6 DEFINITY ECS ATM-PNC troubleshooting commands Wid e-area networks (WAN), esp ec ially those c onstruc ted as an internet using p ub lic network fac ilities, may take inter-PN c onnec tivity to the ed ge of ac c ep tab le p erformanc e. The switc h may exp erienc e d elays, b loc kag es, or c onnec tion losses b ec ause of c irc umstanc es b eyond the c ontrol of switc h manag ement. Variations in p erformanc e may be exp ec ted during p eriod s of hig h traffic . If ATM-PNC is enab led (change system-parameters customer-options ), 2 c ommand s b ec ome availab le: nchange/display atm pnc-pairs lets you g et inter-p ort-network measurements for up to 10 ord ered p airs of port networks nlist measurements atm pnc-latency rep orts d ata ab out ATM c ell latenc y and c onnec tion times. In b oth of these c ommand s, you must supp ly the following information: nthe numb er of c onnec tions req uested, nthe averag e c onnec tion setup time in millisec ond s, nthe numb er of ATM network setup req uests required , and nthe averag e setup time for the ATM c onnec tions. Sep arate sets of measurements are availab le for the A and B sid es in c ritic al reliability systems. change/display atm pnc-pairs This c ommand lets you selec t 10 p airs of port networks for whic h measurements can be reported. Screen 6-16 shows the output for the c ommand .
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-42 Troubleshooting ATM-PNC 6 Screen 6-16. PNC measurements pairs screen (change/display atm pnc-pairs) Field descriptions list measurements atm pnc-latency This command reads and displays the collected information regarding ATM cell latenc y and c onnec tion times. The c ommand -line syntax is: nlist measurements atm pnc-latency [last-hour, today-peak, yesterday-peak ] [print | schedule] NOTE: If a PN p air is c hanged d uring a 24-hour p eriod, the p eak value rep orted for the (new) p air is the hig hest latenc y measured after the c hang e. If you typ e list measurements atm pnc-latency and press En t e r while the PNC d up lic ation feature is d isab led , the outp ut c ontains d ata for A-PNC only. Measurements are d isp layed only for administered p nc -p airs. That is, if 5 p airs were ad ministered on the ATM PNC Measurements Pairs sc reen, the list measurements atm pnc-latency outp ut c onsists of 5 measurement entries. If the system time has been mod ified throug h the set time c ommand d uring any measurement hour Y, that measurement hour is d isp layed as Y** instead of Y00, to ind ic ate that the d ata for that hour may b e invalid .Pair Id entifies the p ort network p air numb er (read only). Orig PN Dest PNThese entries id entify the originating port network and the d estination p ort network for the measured SVCs (values are b etween 1 and 44; d efault is blank ). change atm pnc-pairs PNC MEASUREMENTS PAIRS Pair Orig Dest PN PN 1 1 5 2 1 8 3 5 8 4 5 7 5 4 2 6 10 11 7 10 12 8 10 1 9 1 10
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-43 Troubleshooting ATM-PNC 6 If an ad ministered pnc -p air is c hang ed , the next time measurements are g athered , the today-peak entry for the old p nc -p air is rep lac ed with an entry for the new pair, and all c ounters are set to 0. Screen 6-17 shows the output for this c ommand . Screen 6-17. ATM-PNC latency measurements Field descriptions Conserving ATM bandwidth Port Networks in a DEFINITY ATM-PNC c onfig uration, when used with the Luc ent ac c ess c onc entrators or other ATM switc hes interfac ing to b and wid th-c onstric ted or c ong ested fac ilities, c an inc ur c ontention for b and wid th, resulting in failed c all c omp letions. Figure 6-4 rep resents a DEFINITY Orig PN/Dest PNId entifies the orig inating p ort network and the d estination p ort network for the measured SVCs (d efault is b lank). PN Count The numb er of setup attemp ts on the p ort network Connection ms The amount of time (in millisec ond s) for the c onnec tion ATM NW Count The numb er of setup attemp ts on the ATM network Setup ms The amount of time (in millisec ond s) to set up the c onnec tion. Hour The time of the d ata c ollec tion. list measurements atm pnc-latency last-hour Switch Name: _______________ Date: 7:23 pm SAT MAR 21, 1998 ATM PNC LATENCY MEASUREMENTS -----------A-PNC----------- ---------B-PNC---------- Orig Dest PN Connection ATM NW Setup Hour PN Connection ATM NW Setup Hour PN PN Count ms Count ms Count ms Count ms 1 5 2200 143 2055 153 1900 1 8 1219 78 1144 83 1900 5 8 2663 220 2386 245 1900 5 7 143 105 123 122 1900 4 2 7101 326 6845 338 1900 10 11 353 54 343 56 1900 10 12 3360 76 3326 77 1900 10 1 1570 71 1547 72 1900 1 10 1570 83 1547 84 1900 8 2 1100 62 1038 66 1900
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-44 Troubleshooting ATM-PNC 6 ATM-PNC c onfig uration in whic h Inverse Multip lexing for ATM (IMA) is used g oing into and c oming out of the network c loud . Figure 6-4. Bandwidth-constricted ATM network configuration In this c onfig uration c onnec tions from the DEFINITY ECS switc h and the ATM b ac kb one switc h and to the ATM ac c ess c onc entrator are OC-3/STM-1 throug h the TN2305/TN2306 ATM interfac e c irc uit p ac ks over fib er op tic c ab le. When traffic exc eed s the c ap ac ities of the IMA links, c ontention for ac c ess to the ATM Figure Notes 1 . D EFI N ITY EC S PPN 2 . D EFI N ITY EC S Ex p a n s io n Po r t N e t w o rk (EPN ) 3. OC-3/STM-1 c onnec tion 4. ATM switc h A 5. ATM switc h B6. DEFINITY ECS ac c ess terminal 7. IMA c onnec tion 8. ATM network 9. Ac c ess c onc entrator 1 0 . D EFIN I TY EC S EPN 1 2 3 3 6 778 945 cydaband LJK 020100 10
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-45 Troubleshooting ATM-PNC 6 network occurs. In such cases, SVC setups requested by DEFINITY can be d enied b y the ATM network and assoc iated c omp onents, and c alls are not completed. In this sec tion, a failed SVC setup means that the ATM network has ac tively rejec ted the req uest. A d elayed SVC setup means that the SVC setup exc eed ed a time threshold , sp ecified in milliseconds (ms). Performanc e ind ic ators of b oth failed and d elayed SVC setup s: nThe c alled p arty may hear ring ing , take the rec eiver off-hook, and hear nothing . The c alled p arty may eventually rec eive a d elayed c all, b ut never rec eives a failed c all. nIf the c all was d elayed, the c alling p arty hears silenc e if one of the SVCs is not up or hears the c alled p arty if it is up . nIf the c all is never c omp leted , the c aller eventually hang s up without knowing why the c all was not c omp leted . Therefore, SVC failures that oc c ur more often than normal are most often evid enc e of an ATM network that is out of sp ec ific ation. The tools to manag e the DEFINITY ECS switc h and the ATM network are nAlarming out-of-spec conditions nSVC latency commands nAdministration threshold s to either allow or d eny c ompletion of c alls that req uire a new SVC over a p ath that rec ently exp erienc ed a hig h numb er of delayed or failed SVCs. Alarming out-of-spec conditions Out-of-sp ec c ond itions in the ATM network are reported ag ainst the ATM-NTWK maintenanc e ob jec t in the Alarm Rep ort and the Hard ware Error Rep ort (display errors ). Refer to one of the following b ooks for an examp le of a Hard ware Error Rep ort with an ATM-NTWK alarm: nDEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8 r nDEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8 s i nDEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8 c s i
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-46 Troubleshooting ATM-PNC 6 SVC latency commands Two rep orts are availab le to help monitor the ATM network: 1. The ATM PNC Latenc y Histog ram rep ort (ac c essed throug h the list measurements atm latency-histogram command) shows: nSetup c ount nAd d Party c ount ntotal naverag e latenc ies nhistog ram (21 d ifferent time b ins rang ing from 0-9 msec . to + 10 sec .) Syn t a x : list measurements atm latency-histogram current-hour | last-hour | today-total | yesterday-total [print or schedule] Th e list measurements atm latency-histogram outp ut is shown in Screen 6-18 . Screen 6-18. ATM-PNC latency histogram report list measurements atm latency-histogram last-hour Page 1 SPE A Switch Name: Date: 10:27 am TUE OCT 25, 1999 ATM PNC LATENCY HISTOGRAM Setup Count: 770 Average Latency (msec): 53 Failure Count: 3 AddParty Count: 538 Average Latency (msec): 92 Failure Count: 1 Total Count: 1308 Average Latency (msec): 71 Failure Count: 4 Range (msec) Setup AddParty Total Range (sec) Setup AddParty Total 0-9 0 0 0 1-1.9 1 0 1 10-19 200 2 202 2-2.9 0 0 0 20-49 400 3 403 3-3.9 0 0 0 50-99 100 1 101 4-4.9 6 1 7 100-149 50 6 56 5-5.9 0 0 0 150-199 10 0 10 6-6.9 0 0 0 200-249 3 0 3 7-7.9 0 0 0 250-299 0 0 0 8-8.9 0 0 0 300-399 0 0 0 9-9.9 0 0 0 400-499 0 0 0 10 + 0 0 0 500-999 0 0 0