Mitel SX-200 DIGITAL Pabx Information Manual
Have a look at the manual Mitel SX-200 DIGITAL Pabx Information Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 55 Mitel manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
CHART 5-3 INSPECT EQUIPMENT Step 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Action Comments Remove keys taped to top of cabinet. Unlock and open cabinet front door. Ensure that cabinet doors open and close easily. Tighten all shelf retaining screws. Make sure that all components within the cabinet are secure and undamaged. Verify cards received against invoices. DO NOT UNPACK PCB CARTONS OR REMOVE cards from their antistatic bags at this time. Visually check shelves for damage. Ensure that all connector contacts are free of foreign matter and undamaged. Tag any damaged items and complete relevant section of Damage Report. Close and lock cabinet door. Remove shipping screws from rear door Not applicable for single shelf power supply. cabinet. Unlock and open rear door. Open power supply door, if present. Visually inspect power supply for loose or damaged components. Check that power supply cable harness is secure and free from damage. Tag any defective item and continue with inspection; complete relevant portion of Damage Report. Check that all cable connectors are seated firmly and free from damage. Visually inspect backplane for damage. Close power supply door. Tag defective items and continue. Fill in relevant portion of Damage Report. Repack tagged items and return according to local procedures. Page 5-5
Shipping, Receiving, And installation information CHART 5-4 INSTALL CONTROL CABINET Note: Ideally, a Control cabinet is installed to the left of a Peripheral cabinet (existing SX-200@ cabinet if upgrading). The cabinets may be separated by up to the length of the PCM cable which connects them together. Step 1. 2. Action Place the Control cabinet into its assigned position. Ensure that the doors open freely, that there is adequate room for access, and that the AC receptacle and cross-connect blocks are within reach of the cables from the cabinet. Comments 3. 4. Before making any connections, perform the “Verify Ground Connection” chart to ensure an adequate ground. When the ground has been verified, connect the ground wire to the ground stud within the Control cabinet. Allow enough room for cables to enter the base of the Control cabinet from the sides or rear. WARNING THE FANS INSTALLED IN THE UPPER BACK DOOR OF THE CONTROL CABINET ARE HIGH AIR-FLOW DEVICES. LOOSE FOREIGN OBJECTS PLACED IN CLOSE PROXIMITY TO THE FANS MAY BE PULLED INTO THE IMPELLERS. SERVICE AND INSTALLATION PERSONNEL MUST MAINTAIN A SAFE DISTANCE FROM THE FANS IN ORDER TO PREVENT LOOSE PARTS OF CLOTHING OR HAIR FROM BECOMING ENTANGLED IN THE FAN. THE COVERS OVER THE FANS PREVENT ACCIDENTAL CONTACT WITH THE ROTATING PARTS, AND MUST ALWAYS BE IN- STALLED. Page 5-6
Shipping, Receiving, And Installation Information CHART 5-5 VERIFY GROUND CONNECTION Note: Before installation can begin a #6 AWG green ground wire must be connected between the equipment location and an approved ground (metallic cold water pipe or equivalent where it enters building). Step 1. Action Before plugging any cards into the cabinet, or connecting the Equipment Ground wire, ensure the equipment circuit breakers are turned off. Comments Do not power up the PABX. 2. Plug the AC line cord into the building AC receptacle. The #6 AWG green ground wire should be connected to an approved ground, but not to the PABX. 3. Measure the AC voltage between the PABX Use a good quality, calibrated digital ground lug and the “approved” ground wire. multimeter, and always begin measurements at the highest range setting. 4. 5. If the voltage is greater than 1.0 V, stop, and If help is needed, consult your locate another approved ground. engineering support group. When the voltage is less than 1.0 V, measure Begin the measurements at the the resistance; it should be less than 5 highest resistance range. If help is ohms. If the resistance is greater than 5 needed, consult your engineering ohms, take corrective action to reduce the support group. resistance to less than 5 ohms. 6. Connect the verified ground wire to the common ground stud in the control cabinet. Page 5-7
Shipping, Receiving, And Installation Information CHART 5-6 INSTALL PERIPHERAL CABINET Step 1. Action Unpack the cabinet and other items, except printed circuit cards. Check items received against packing list. Comments 2. Inspect the cabinet, shelf, and other items for Ensure that the doors open and loose, missing, or damaged parts. close freely, and all cables are secure and in place. Remove shipping screws from rear door. 3. Place the peripheral cabinet on the right side of the control cabinet. 4. Route PCM cable PN9 108-026OOO-NA between the two cabinets; at this time connect only the ground braid to the ground stud in each cabinet, and the Control cabinet end to J17B of the Control shelf backplane. 5. Install Surge Clamp on Bay 4, Slot 16, pin 10, as shown in Figure 4-5. Ensure that the top of Surge Clamp is towards the top of the shelf. The top of the connector plugs onto pins 9 and 10. Page 5-6
Shipping, Receiving, And Installation information CHART 5-7 INSTALL ANALOG BAY 3 KIT Step 1. Action Unpack kit and inspect contents for loose, damaged, or missing items. Comments 2. Open Control cabinet doors, set power switches to OFF, set main breaker on rear door to OFF, and remove line cord from wall outlet. 3. Remove rear door fan assembly - unplug fan supply cord, detach cord strain relief at stud - remove door ground wire at door stud - remove door 4. Remove rear door - unplug AC distribution unit supply cord and unfasten cord strain relief - remove door ground wire at door stud - loosen four screws securing rear door retaining bar - slide retaining bar up, releasing the rear door - replace lower right hand retaining bar securing screw with #lO x 7/8” screw from kit (to secure main power cable strain relief). 5. Unpack the Interconnect and Power Fail Transfer (PFT) cards; inspect for loose, damaged, or missing items. The optional PFT card should be installed concurrently. 6. Install the Interconnect card on the upper left side of the cabinet (from rear) with six sets (screws, lockwashers, and flat washers). 7. If a PFT card is to be installed also, remove the six securing screws from the front of the Control shelf and slide it forward. 8. Install the PFT card below the Interconnect The PFT card is optional. card with six sets (8-32 x 3/8” screws, lockwashers, flat washers). 9. Replace the Control shelf with its associated Be sure that the antistatic wrist hardware. strap is securely in its original location. Page 5-9
Shipping, Receiving, And Installation Information CHART 5-7 (CONT’D) INSTALL ANALOG BAY 3 KIT Step 10. 11. Action Connect the wiring harness, 2”d D.C., (pn 103148501) between the Interconnect card and the PFT card. Interconnect Colour PFT TB301-1 Brown TB-3 TB30 1-2 Blue TB-5 TB30 1-3 TB30 l-4 White TB-6 ‘TB30 1-5 Red TB-7 TB30 1-6 Orange TB-4 TB30 1-7 Yellow TB-2 Install cutover monitor cable (pn 114905501) from P18 on Interconnect card to TB-7 on PFT card. Secure connector with a tie wrap. Comments 12. Connect ground strap (pn 105671501) from TB301-3 to Control shelf frame with 6-32 x 5/16” screw, lockwasher and external tooth lockwasher. 13. 14. Unpack shelf; refer to Figure 5-2. Check backplane and shelf for cracks, bent pins, loose or missing items, or other damage. Connect brown backplane wire near TBl to shelf frame with 6-32 x 3/8” screw, external tooth lockwasher, lockwasher, nut. 15. Place shelf onto shelf guides and secure from front with eight lo-32 screws, lockwashers, and flat washers. 16. Connect ground wire found attached to upper right corner of Control shelf frame to lower right corner of Peripheral shelf (Bay 3), using 6-32 x 3/8” screw, external lock washer, lockwasher, and nut. 17. Route the DC power cable (pn 114904501) within the cabinet. The cable is routed up from the power supply, across the top of the cabinet, and down to the terminal blocks on the backplane and interconnect card. Page 5-10
Shipping, Receiving, And Installation Information EQIJJEy;NT POLVETHVLENE PACKING PIECES END SUPPORT KA0185ROEO Figure 5-2 Equipment Analog Shelf Packaging Page 5-l 1
Shipping, Receiving, And Installation Information CHART 5-7 (CONT’D) INSTALL ANALOG BAY 3 KIT Step 18. Action Connect the DC power cable leads to the Bay 3 backplane, as shown in Figure 4-l 1. Comments 19. Connect the DC power cable to the Interconnect card as follows: TB301-1 brown TB301-2 blue TB301-3 braided gnd cable to Control shelf frame TB301-4 nc TB301-5 nc TB301-6 orange TB30 1-7 yellow 20. Connect connectors from Maintenance Panel cable to P301 and P303 of Interconnect Card. 21. Route intershelf PCM Control cabinet cable into space between shelves; connect marked end to J17A on the Control backplane. 22. Install cables between Bay 3 and Interconnect card; 18 inch (pn 114909501) between P6 and P16, and 25 inch (pn 114910501) between P5 and P17. Secure each cable with a cable tie and a connector screw. 23. Install a surge clamp onto the Bay 3 backplane at slot 16, pins 9 to 32; ensure that surge clamp is installed right side up (see label on clamp). Refer to Figure 4-11. 24. Install cables between Bay 3 and distribution frame. 25. 26. Unpack rear door power supply assembly (pn If damaged or wrong type, repack in 102966503); inspect for physical damage, and original container and return with correct type. completed Damage Report. Place rear door power supply onto lower door support and lock into closed position (this will hold the rear door power supply while installing upper support). Page 5-12
Shipping, Receiving, And installation information CHART 5-7 (CONT’D) INSTALL ANALOG BAY 3 KIT Step 27. Action Install upper support over power supply hinge pin and secure to cabinet with four screws and lockwashers. Comments 27. Connect ground lead to rear door power supply using hardware from original door. 29. Plug AC distribution unit assembly supply cord into the power supply outlet. Attach cable strain relief to power supply door by removing power supply cover screw and replacing it with an 8-32 x 5/8” long screw which also secures the cable strain relief. 30. Connect the DC power cable connector to the power supply. Attach power cable strain relief by removing a power supply cover hold down screw and replacing it with an 8-32 x 5/8” screw to fasten cable strain relief to cover. 31. Install rear door fan assembly and two nuts on hinge bracket. 32. Attach door ground wire to door ground stud, using hardware removed from old door. 33. Plug fan power supply cord into connector on fan door and attach cord strain relief to stud on fan door; use previously removed hardware. 34. Put on the antistatic wrist strap. Always wear the antistatic wrist strap when handling printed circuit cards. 35. Unpack each printed circuit card and insert it into its assigned slot. 36. Connect PCM cable previously routed between the shelves to connector J2 on the front of the Digital Interface Card at Bay 3, Slot 18. 37. Power up PABX and reprogram using Customer Data Entry. Page 5-13
Shipping, Receiving, And Installation Information CHART 5-8 INSTALL BAY 3 KIT INTO AN SX-200@ UNIVERSAL CABINET Step 1. Action Unpack kit contents and inspect for loose, damaged, or missing items. Comments 2. Open Control cabinet doors, set BPS switches to OFF, set main breaker on rear door to OFF, and remove line cord from wall outlet. 3. 4. 5. 6. Install Interconnect card with six screws on Top right mounting hole goes to the upper left side of the cabinet (viewed sixth hole from top of center side from rear). rail Install shelf rails l/2 inch above Control Screws into third hole above shelf, and secure to cabinet vertical frame Control shelf, with horizontal using IO-32 x l/2 screws. support below, pointing inward Unpack shelf; refer to Figure 5-2. Check backplane and shelf for cracks, bent pins, loose or missing items, or other damage. 7. 8. Connect ground wires from backplane to card file side panel. Place shelf onto shelf rails and secure to front frame with eight lo-32 screws. Refer to Figure 5-3, 5-4 and 5-5 for installation details 9. Install blank panel above shelf and route leads from switch and LED to rear of cabinet. 10. At rear of cabinet, disconnect AC wiring from door, fan assembly, and remove ground strap from frame stud; retain hardware. Remove door. 11. Connect braided wire from upper side panel to Interconnect card (TB301-3). Connect green wire from lower side panel to frame, using an external tooth washer between terminal and frame. 12. Route the DC power cable (pn 114904501) within the cabinet. The cable is routed up from the power supply, across the top of the cabinet, and down to the terminal blocks on the backplane and Interconnect card. Page 5-14