    							NDA-24234 CHAPTER 5
    Page 341
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-040
    Sheet 2/2
    Connection Test-Paging Trunk for Paging 
    Transfer Service
    Connection
    For Non-Delay-System
    Station “C” is connected to Station “A”.
    When Station “A” hangs up, Stations “B” and “C” are automatically connected 
    with each other.
    For a Delay-System
    Station “A” rings and picks up handset
    Station “A” is connected to Stations “C”.
    When Station “A” hangs up, Stations “B” and “C” are automatically connected 
    with each other.
    For Paging Transfer Supervision
    Station “C” is connected to Station “B”.
    Release
    END
    A 
    						
    							CHAPTER 5 NDA-24234
    Pag e 34 2
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-041
    Sheet 1/1
    Radio Paging Trunk (COT Card) 
    Connection Test
    START
    Call the Radio Paging Equipment Station “A” dials the radio paging access code and hears 
    Special Dial Tone from the Radio Paging Equipment, then 
    dials the slave station number.
    The paging radio of the slave station starts ringing.
    By hearing CRBT (Continuous Ring Back Tone) from the
    Radio Paging Equipment, Station “A” confirms that the slave
    station is being paged, then goes on-hook.
    The paged party answers The slave station (the radio-pages party) dials the paging an-
    swer code at the nearby Station “B”, hears SPDT through the
    Radio Paging Equipment, then dials the paging answer code.
    Station “A” rings and picks up the handset.
    Confirm that Stations “A” and “B” can talk with each other.
    Release Stations “A” and “B” both go on-hook.
    END
    LCCOT
    ARG
    LCB
    RBT
    COT
    RADIO PAGING 
    SLAVE STATION 
    						
    							NDA-24234 CHAPTER 5
    Page 343
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Test Outline:
    The Howler Tone Generator and the Ringing Generator are equipped on the PWR Supply.
    The purpose of the test is to confirm ringing signal by setting up a station to station connection and a howler tone
    connection from a station accommodated in any PIM.
    NAP-200-042
    Sheet 1/2
    Howler & Ringing Signal Test
    START
    Check PWR0 in each PIM.
    While both PWR Supplies are OFF, turn power to PWR0 ON. Leave PWR1 OFF.
    Check howler tone.
    A station accommodated in the PIM for which the PWR Supply is to be tested goes off-
    hook. (analog port only)
    The station hears DT.
    In about 12 seconds, the station hears ROT.
    About 30 seconds later, the station should confirm hearing howler tone.
    Check ringing signal.
    Set up a station-to-station connection between two stations accommodated in the IM 
    inm which the PWR Supply is to be tested. (analog port only)
    Confirm that ringing signal is sent out.
    LCB
    RBT
    LC
    C
    RG
    LC
    Howler Signal
    A
    A
    *
    * 
    						
    							CHAPTER 5 NDA-24234
    Pag e 34 4
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-042
    Sheet 2/2
    Howler & Ringing Signal Test
    Check PWR1 in each PIM.
    While both PWR Supplies are OFF, turn power to PWR1 ON. Leave PWR0 OFF.
    Check howler tone.
    A station accommodated in the PIM for which the PWR Supply is to be tested goes off-
    hook. (analog port only)
    The station hears DT.
    In about 12 seconds, the station hears ROT.
    About 30 seconds later, the station should confirm hearing howler tone.
    Check ringing signal.
    Set up a station-to-station connection between two stations accommodated in the IM 
    inm which the PWR Supply is to be tested. (analog port only)
    Confirm that ringing signal is sent out.
    END
    A
    *
    * 
    						
    							NDA-24234 CHAPTER 5
    Page 345
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    5. OVERALL TEST
    5.1 Outline
    Tests are to be performed to check C.O. Lines and/or Tie Lines by connecting them to a trunk on an individual
    basis.
    The speech path conditions (speech level, presence of noise, one-way speech, no speech, etc.) over the connec-
    tion to the distant office will be checked.  Release of the trunk used will also be checked.
    5.2 Overall Test Procedure
    The procedure for performing the Overall Test is described in the NAPs indicated to the right of each item in
    the following flowchart.
    START
    Overall Test of C.O. Line Outgoing Call:NAP-200-043
    Overall Test of C.O. Line Incoming Call:NAP-200-044
    Overall Test of CCIS Tie Line Outgoing Call:NAP-200-045
    Overall Test of CCIS Tie Line Incoming Call:NAP-200-046
    Test of Connection Alternate Routing to All Tie Lines:NAP-200-047
    Test of Tandem Connection to Tie Line:NAP-200-048
    PAD Setting:NAP-200-049
    END 
    						
    							CHAPTER 5 NDA-24234
    Pag e 34 6
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-043
    Sheet 1/1
    Overall Test for C.O. Line Outgoing Call
    START
    Seizure of trunk to be tested
    When seizing from a 
    stationPlace the trunk to be tested into idle state, and make all other 
    trunks busy.
    Station “A” dials the trunk access number.
    Station “A”, after hearing dial tone from the C.O., dials the 
    pilot number for the local office and allows the call to be 
    terminated to that office via loop-back at the C.O.
    When seizing from an 
    ATTCONAn ATTCON sets up the connection with a specific trunk 
    designated via Individual Trunk Access service.
    The ATTCON, after hearing dial tone from the C.O., dials 
    the pilot number for the local office and allows the call to be 
    terminated to that office via loop-back at the C.O.
    Call termination to ATTCON The call looped back at the C.O. terminates to the 
    ATTCON.
    Check of speech conditions After the call has been answered at the ATTCON, check the 
    speech conditions including speech level, presence of noise, 
    and one-way speech state.
    Release
    When all COTs have been 
    checked and a fault is detected.Perform a trunk loop-back test at the C.O., and determine 
    whether the trunk side or the C.O. Line side is faulty.
    If the C.O. Line is faulty, make a request to the C.O. for 
    repair.
    END
    AT T C O N
    AT T C O N
    LC
    PBX 
     
    A
    AT I
    AT I
    COT
    COT
    COT
    Central 
    Office 
    Exchange 
    						
    							NDA-24234 CHAPTER 5
    Page 347
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Test Outline:
    The tests comprising this NAP are to be performed according to the C.O. Line Number Table provided by the C.O.
    If the C.O. Line Numbers are not known, tests cannot be performed because loop-back cannot be performed at the
    C.O.
    In addition, tests cannot be performed which involve Direct Inward Dialing.  Under such circumstances, the C.O.
    must be asked to perform an incoming test.
    NAP-200-044
    Sheet 1/1
    Overall Test for C.O. Line Incoming Call
    START
    Seizure  of trunk  to  be  tested From the ATTCON, set up a connection with a specific trunk 
    designated via Individual Trunk Access.
    After hearing dial tone from the C.O., dial the C.O. Line 
    number of the trunk being tested from the ATTCON.
    Call termination to ATTCON The call looped back at the C.O. terminates to the 
    ATTCON.
    Speech Condition Check After the call has been answered at the ATTCON, check the 
    speech conditions including speech level, presence of noise, 
    and one-way speech.
    Release
    When all COT trunks have been 
    checked and a fault is detected.Perform a trunk loop-back test at the C.O. and identify 
    whether the trunk side or the C.O. Line side is faulty.
    If the C.O. Line side is faulty, make a request to the C.O. for 
    repair.
    END
    AT T C O N
    AT T C O NLC
    PBX 
     
    AT I
    COT
    COT
    COT
    Central 
    Office 
    Exchange 
    						
    							CHAPTER 5 NDA-24234
    Pag e 34 8
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-045
    Sheet 1/2
    Overall Test of CCIS Tie Line Outgoing 
    Call
    START
    Seizure of trunk to be tested
    When seizing from a 
    stationPlace the trunk to be tested into idle state, and make busy all 
    other trunks.
    Station “A” dials the number for station “B” in the PBX-B
    When seizing from an 
    ATTCONAn ATTCON sets up the connection with a specific trunk 
    designated by Individual Trunk Access for CCIS TRK 
    service and dials the number for Station “B” in the PBX-B.
    Call termination to Station “B” 
    in the PBX-BThe call terminates to Station “B” via a CCIS Tie Line.
    Check of speech conditions After the call has been answered at the ATTCON, check the 
    speech conditions including speech level, presence of noise 
    and one-way speech state.
    Release
    When all CCIS Tie Line Trunks 
    have been checked and a fault 
    has been detectedPerform fault localization procedure when a fault has 
    occurred to CCIS Tie Line (See Procedure A).
    If the distant office is faulty, make a request to the distant 
    office for repair.
    END
    ATTCONPBX-A
    AT I
    LCLC
    Station APBX-BStation B
    (PBX to be tested) 
    						
    							NDA-24234 CHAPTER 5
    Page 349
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    (Procedure A)
    NAP-200-045
    Sheet 2/2
    Overall Test of CCIS Tie Line Outgoing 
    Call
    START
    On the DTI/CCT card, set its MB switch UP.
    In any office other than the Primary Office (Clock-Source-Office), disconnect the DTI/CCT cable 
    connector at the DTI/CCT side (Backplane of PIM)
    PLO alarm is generated, but ignore it.
    The PLO starts running by itself.
    Make the following connection at the MDF using a paired wire.
    The DTI does not recover. (CCH/ 
    CCT Link Failure may occur, but 
    ignore it.)System message “3-J” is not displayed.
    The DTI/CCT is faulty.
    The DTI recovered. (CCH/CCT 
    Link Failure may occur, but ignore 
    it.)System message “3-J” is displayed.
    The DTI/CCT is normal.
    Call the distant office and ask for repair.
    END
    TA
    TB
    RA
    RB
    DTI/CCT 
    LEADS
    CROSS 
    CONNECTION MDF 
    						
    							CHAPTER 5 NDA-24234
    Pag e 35 0
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-046
    Sheet 1/1
    Overall Test of CCIS Tie Line Incoming 
    Call
    START
    Seizure of trunk to be tested Place the trunk to be tested into idle state, and make busy all 
    other trunks.
    Termination of incoming call to 
    station “A” in the self officeAn incoming call from the distant office terminates to 
    Station “A”.
    Check of speech After the call has been answered at Station “A”, check the 
    speech conditions including speech level, presence of noise 
    and one-way speech state.
    Release
    When all CCIS Tie Line Trunks 
    have been checked and a fault has 
    been detectedPerform fault localization procedure when a fault has 
    occurred to CCIS Tie Line. (See Procedure A of NAP-200-
    045.)
    If the distant office is faulty, make a request to the distant 
    office for repair.
    END
    PBX-A
    LCLC
    Station APBX-BStation B
    (PBX to be tested) 
    						