    							NDA-24234 CHAPTER 5
    Page 321
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Test Outline:
    Tests are performed to see if system initialization can be executed. There are two kinds of test method; test by using
    START button on the TOPU, and test by Power ON/OFF.
    Figure 027-1  System Initialization via ‘Start’ Button
    NAP-200-027
    Sheet 1/2
    System Initialization Test
    START
    Perform system initialization (via “START” button)
    Set the SYSTEM DATA key on the TOPU to NON LOAD side, and set the PROGRAM key to 
    NON LOAD side.
    Perform system initialization by pressing the “START” button on the TOPU.
    Confirm When the system is initialized, the “CPU OPE” lamp (Green) 
    on the DSP circuit card lights.
    When the system is initialized, System Message “7-B” is 
    displayed on the MAT.
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    A
    *
    To perform system initialization, set the switch keys on the TOPU as shown below, then press the START button.
    ALM
    RSTPFT
    ON
    OFFINITIAL
    STARTEFFECT PROGRAM
    LOAD
    SYSTEM DATA
    NON LOAD
    ON
    OFF
    NON LOAD
    PZ-DK222 
    						
    							CHAPTER 5 NDA-24234
    Pag e 32 2
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-027
    Sheet 2/2
    System Initialization Test
    Perform system initialization (by powering ON/OFF).
    Initialization by powering 
    ON/OFF.On all PWR Supplies, set the circuit breaker OFF 
    (Down). If a module contains two PWR Supplies, 
    they must be turned ON/OFF simultaneously.
    Turn ON the PWR Supplies in each module in the 
    following order. If a module contains two PWR 
    Supplies, they must be turned ON/OFF 
    simultaneously.
    LPM
    →PIM0
    →PIM1
    →PIM2
    →PIM3
    Confirm When the system is initialized, the CPU OPE lamp 
    (Green) on the DSP turns ON.
    When the system is initialized, System Message “7-
    B” is displayed on the MAT.
    Assignment of Date and Time Upon completion of all the initialization tests, 
    assign data and time via MAT command “AT I M .”
    END
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    A
    * 
    						
    							NDA-24234 CHAPTER 5
    Page 323
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-028
    Sheet 1/1
    Circuit Card Initialization Test
    START
    Make the No. 0 CPU the ACT system.
    In each PIM, initialize any  
    Line/Trunk circuit card.On the selected Line/Trunk circuit card, set the MB switch UP.
    The OPE lamp goes out.
    System Message “7-K” is displayed.
    Set the MB switch DOWN.
    The OPE lamp turns ON.
    System Message “7-L” is displayed.
    Clear the alarm Clear the alarm indication by pressing the “ALM RST” button 
    on the TOPU.
    Make the No. 1 CUP the ACT system.
    In each PIM, initialize any 
    Line/Trunk circuit card.On the selected Line/Trunk circuit card, set the MB switch UP.
    The OPE lamp goes out.
    System Message “7-K” is displayed.
    Set the MB switch DOWN.
    The OPE lamp turns ON.
    System Message “7-L” is displayed.
    Clear the alarm Clear the alarm indication by pressing the “ALM RST” button 
    on the TOPU.
    END
    * 
    						
    							CHAPTER 5 NDA-24234
    Pag e 32 4
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    4. PORT CONNECTION TEST
    4.1 Outline
    Tests are to be performed on all the circuits of LC and Trunk circuit cards and PWR Supplies. LC and Trunk
    circuit cards are tested with respect to their operations and speech path conditions. PWR Supplies are tested with
    respect to howler tone and ringing signal.
    While tests are in progress, the No. 0 CPU and TSW systems must be ACT (active).
    4.2 Port Connection Test Procedure
    The connection test procedure for each type of circuit card is described in the NAP indicated to the right of each
    item in the following flowchart.
    START
    ORT (RST Card) Connection Test:NAP-200-029
    ATTCON (ATI Card) Connection Test:NAP-200-030
    Line (LC, ELC Card) Connection Test:NAP-200-031
    Outgoing Trunk (COT, TLT, DTI Card) Connection Test:NAP-200-032
    Incoming Trunk (COT, TLT, DTI Card) Connection Test:NAP-200-033
    Direct-In Termination Trunk (COT Card) Connection Test:NAP-200-034
    SND (RST Card) Connection Test:NAP-200-035
    3-Party Conference Trunk Function Test:NAP-200-036
    Connection Test - Announcement Trunk for Announcement Service:NAP-200-037
    Connection Test - Digital Announcement Trunk for Announcement Service:NAP-200-038
    Connection Test - Paging Trunk for Paging Access Service:NAP-200-039
    Connection Test - Paging Trunk for Paging Transfer Service:NAP-200-040
    Radio Paging Trunk (COT Card) Connection Test:NAP-200-041
    Howler and Ringing Signal Test:NAP-200-042
    END 
    						
    							NDA-24234 CHAPTER 5
    Page 325
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-029
    Sheet 1/2
    ORT (RST Card) Connection Test
    START
    Make busy all ORTs On the front of the RST card, set all MBR switches (0-7) to 
    the OFF position, making all ORTs busy.
    From Station “A” (DP), test 
    ORTs one circuit at a time.Un-busy (make idle) only the ORT to be tested.
    Station “A” goes off-hook and after hearing DT, dials the 
    station number of Station “B.”
    Station “A” confirms ringing to Station “B” and Station “B” 
    answers.
    Stations “A” and “B” go on-hook.
    From Station “B” (PB), test 
    ORTs on circuit at a time.Un-busy only the ORT to be tested.
    Station “B” goes off-hook and after hearing DT, dials the 
    station number of Station “A.”
    Station “B” confirms ringing to Station “A” and Station “A” 
    answers.
    Stations “A” and “B” go on-hook.
    LC
    ORT
    A (DP)DT, RBT
    LCB (PB)
    RG
    A
    *
    * 
    						
    							CHAPTER 5 NDA-24234
    Pag e 32 6
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-029
    Sheet 2/2
    ORT (RST Card) Connection Test
    Perform tests for a situation where all ORTs are busy.
    System Data SYS1, 
    INDEX 4, b
    0 =0Station “A” goes off-hook.
    Station “A” confirms that Reorder Tone (ROT) is heard
    Station “A” goes off-hook.
    System Data SYS1, 
    INDEX 4, b
    0 =1Station “A” goes off-hook.
    Station “A” confirms that no tone is heard.
    Un-busy (make idle) a single ORT circuit.
    Station “A” confirms that DT is heard.
    Station “A” goes off-hook.
    END
    A
    * 
    						
    							NDA-24234 CHAPTER 5
    Page 327
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-030
    Sheet 1/1
    ATTCON (ATI Card) Connection Test
    START
    A station repeats an ATTCON 
    call. Each ATTCON answers 
    the call.Station “A” dials the operator access code (normally, “0”).
    At each ATTCON, the operator confirms that the ATT lamp 
    flashes and the ringer sounds.
    At each ATTCON, the operator answers the call by pressing 
    the ATND key.
    Station “A” confirms speech with each ATTCON.
    The operator at each ATTCON releases by pressing the 
    CANCEL key.
    Station “A” goes on-hook.
    Each ATTCON calls a station 
    by pressing LOOP keys one at a 
    time.At each ATTCON, the operator dials the number of Station 
    “A” by using LOOP keys (L1-L6) one at a time.
    Ringing at Station “A” is confirmed.
    Station “A” answers the call and confirms speech.
    The operator at the ATTCON releases by pressing the 
    CANCEL key.
    Station “A” goes on-hook.
    END
    ATI
    DT, RBT
    LCA
    ATI
    ATTCON
    *
    * 
    						
    							CHAPTER 5 NDA-24234
    Pag e 32 8
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-031
    Sheet 1/1
    Line (LC, ELC, DLC, Card) Connection 
    Te s t
    An ATTCON or Dterm is called 
    from each station. The called 
    party confirms the station 
    number.On the MDF, a telephone set is connected to the line circuit 
    to be tested
    The station (XXXX) to be tested goes off-hook and 
    confirms DT (Dial Tone).
    The station (XXXX) calls an ATTCON or D
    term.
    The called ATTCON or D
    term answers the call, and confirms 
    speech and the station number of the calling station.
    The call is released.
    The ATTCON or D
    term calls a 
    station being tested.The ATTCON or Dterm dials the station number of the 
    station being tested.
    The called station answers and confirms speech.
    The ATTCON or D
    term confirms that the number dialed and 
    the number of the station being tested are the same.
    The call is released.
    The test conducted when the 
    station involved is assigned as a 
    Hot Line/House Phone.The station being tested goes off-hook and confirms Ring 
    Back Tone (RBT).
    The station checks whether the call is routed to the 
    predetermined station/ATTCON or that a call is originated 
    to a predetermined trunk.
    The called side answers the call and confirms speech.
    The call is released.
    END
    Line being 
    tested 
    (XXXX)
    ATTCON 
    D term
    ATI/ELC
    LC/ELC
    DT, RBT
    A
    *
    * 
    						
    							NDA-24234 CHAPTER 5
    Page 329
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Test Outline:
    The purpose of this test is to confirm, by setting up an outgoing connection test for each outgoing trunk, that speech
    can be made and that the call can be released.
    Outgoing trunks must be tested one at a time using the sequence of Routes and Trunk Numbers assigned at each
    office
    NAP-200-032
    Sheet 1/3
    Outgoing Trunk (COT, TLT, DTI Card) 
    Connection Test
    START
    When a C. O. Line or Tie Line is 
    not connected with a trunk circuit, 
    temporary cross connections 
    between the Outgoing trunk being 
    tested and the terminating trunk 
    should be set up on the MDF as a 
    loop-back circuit.Referring to Figures 032-1 through 032-3, make temporary 
    cross connections on the MDF for a loop-back circuit.
    Temporarily assign Office Data from the MAT so that a loop-
    back connection from the trunk can be established.
    Make busy all Outgoing Trunks. On the front of the Trunk circuit card, set the MB switch to 
    the OFF position, making the trunk busy.
    Test the trunk circuits one at a 
    time by establishing access from a 
    station.Un-busy (make idle) only the trunk to be tested.
    The station dials the Access Code of the trunk being tested 
    and the number for the call destination.
    The called side answers.
    The station confirms speech.
    The call is released.
    Make temporary cross connections for the next trunk to be 
    tested.
    Restore the temporary 
    connections, temporary Office 
    Data, etc. to the original.
    END 
    						
    							CHAPTER 5 NDA-24234
    Pag e 33 0
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Set up a loop-back connection between the COT (C.O. Trunk) to be tested and a station line.
    Figure 032-1  COT Test Configuration
    The trunk route must be assigned for Loop Start.
    Figure 032-2  TLT Test Configuration
    Set up a loop-back connection between the TLT (Tie Line Trunk) to be tested and another EMT.
    If the TLT is a DID (Direct Inward Dialing) Trunk, connected the related leads as shown below.
    If the TLT is a 2W E&M System, connect the related leads as shown below.
    NAP-200-032
    Sheet 2/3
    Outgoing Trunk (COT, TLT, DTI Card)
    Connection Test
    LCC
    LCB
    LCACOT
    LCTLTA
    LCBTLT 
    T 
    RT 
    RTLT TLT
    T 
    RT 
    R
    E 
    ME 
    M
    TLT TLT 
    						