NDA-24234 CHAPTER 3 Page 181 Revision 3.0 INSTALLATION PROCEDURE Figure 011-12 Inter-Frame Alarm Bus Cable Connection for IMG0-IMG2 NAP-200-011 Sheet 21/24 Inter-frame Cable Connections Multiple IMG Configuration Connect the inter-frame alarm bus cables between IMG0 and IMG2 as shown below. IMG 2IMG 0 TOPU DUMMY BASEULPM REAR VIEWFRONT VIEWTO P U BASEU (1) (2) PIM 0PIM 1 PIM 2 FA N U PIM 3 PIM 0 DSPPZ-DK223 ALMA LED2 ALM2
CHAPTER 3 NDA-24234 Pag e 18 2 Revision 3.0 INSTALLATION PROCEDURE NAP-200-011 Sheet 22/24 Inter-Frame Cable Connections Multiple IMG Configuration Table 011-12 Inter-Frame Alarm Bus Cable Connection for IMG0-IMG2 No.FROM TO CABLE NAME REMARKS UNIT/MODULECONNECTOR NAMEUNIT/MODULECONNECTOR NAME 1 LPM LED2 TOPU(IMG2) DSPM 16PH LED CA-B 2 LPM ALM2 PIM0 (IMG2) ALMA 16PH ALM CA-B
NDA-24234 CHAPTER 3 Page 183 Revision 3.0 INSTALLATION PROCEDURE Figure 011-13 Inter-Frame Alarm Bus Cable Connection for IMG0-IMG3 NAP-200-011 Sheet 23/24 Inter-frame Cable Connections Multiple IMG Configuration Connect the inter-frame alarm bus cables between IMG0 and IMG3 as shown below. ALM3LED3 (2)(1) IMG 3IMG 0 TOPU DUMMY BASEULPM REAR VIEWFRONT VIEWTO P U BASEU PIM 0PIM 1 PIM 2 FA N U PIM 3 PIM 0 DSPPZ-DK223 ALMA
CHAPTER 3 NDA-24234 Pag e 18 4 Revision 3.0 INSTALLATION PROCEDURE NAP-200-011 Sheet 24/24 Inter-frame Cable Connections Multiple IMG Configuration Table 011-13 Inter-Frame Alarm Bus Cable Connection for IMG0-IMG3 No.FROM TO CABLE NAME REMARKS UNIT/MODULECONNECTOR NAMEUNIT/MODULECONNECTOR NAME 1 LPM LED3 TOPU(IMG3) DSPM 16PH LED CA-C 2 LPM ALM3 PIM0 (IMG3) ALMA 16PH ALM CA-C
NDA-24234 CHAPTER 3 Page 185 Revision 3.0 INSTALLATION PROCEDURE This NAP describes front cable connections between circuit cards. Note:Protection against static electricity: A Portable Field Service Grounding Kit must be used to protect system components from static discharge. Figure 012-1 Front Cable Connections between Circuit Cards for CCIS/ISDN NAP-200-012 Sheet 1/1 Front Cable Connections between Circuit Cards START When CCH/DCH and DTI cards are mounted in PIM (For CCIS/ISDN), connect the front cable between CCH/DCH and DTI cards by referring to Figure 012-1. END TRK CN2 CCH /DCHDTI (PIM) Connecting Cable Specification Cable Name Desig. No. Color Label Length: 10AL-(10)FLT CA : NR-510247-001 : White : 10/4 (cm/inch) FRONT VIEW DCH/CCH
CHAPTER 3 NDA-24234 Pag e 18 6 Revision 3.0 INSTALLATION PROCEDURE This NAP explains the following work items: Cable Running from the PBX to the MDF and ATTCON (Desk Console) Cable Running from the PBX to the MAT and SMDR Connections at the PBX Side Cable Tying at the Equipment Frame Note:Compliance with EMI To comply with EMI, Shielded cables with CHAMP connector should be used for the following installation cables: Cable from the PBX to the MDF Cable from the PBX to Attendant Console Cable from the PBX to alarm indicating equipment Cable from the PBX to the external music-on-hold source Cable for line test (connected to TEST connection) NAP-200-013 Sheet 1/13 Cable Running from the PBX to MDF, ATTCON, MAT, and SMDR
NDA-24234 CHAPTER 3 Page 187 Revision 3.0 INSTALLATION PROCEDURE 1. CABLE RUNNING FROM THE PBX TO THE MDF AND ATTCON NAP-200-013 Sheet 2/13 Cable Running from the PBX to MDF, ATTCON, MAT, and SMDR START Cables (25P) for LT Connectors At the PBX side, verify the names of the connectors on the PIM backplane, then bring each LT cable up to the corresponding connector position. Refer to Figure 013-1. Cables for Desk Console Connectors Referring to NAP 200-016, run the installation cables for the Desk Console to the relevant connector positions. Cables (25P) for 16PH EX ALM ConnectorAt the PBX side, confirm the name of the connectors on the LPR backplane, then bring the 16PH EX ALM CA and installation cable up to the connector position. Cables (25P) for NCU Connectors At the PBX side, bring each NCU cable up to the connector on the front of the PFT cards to be mounted in the PIM. Refer to Figure 015-4. At the MDF side, confirm the location of the Terminal Block to which the cable is to be terminated, then bring the cable up to the terminal block. A
CHAPTER 3 NDA-24234 Pag e 18 8 Revision 3.0 INSTALLATION PROCEDURE NAP-200-013 Sheet 3/13 Cable Running from the PBX to MDF, ATTCON, MAT, and SMDR Cables for ODT Connectors Referring to description of 8TLT card in the Circuit Card Manual, connect each 2400 ODT CABLE/2400 ODT CABLE-A and the corresponding installation cables. At the PBX side, bring each 2400 ODT CABLE/2400 ODT CABLE-A up to the connector position on the front of the 8TLT cards to be mounted in the PIM. At the MDF side, confirm the location of the Terminal Blocks to which each cable is to be terminated, then bring the cables up to the terminal blocks. END A
NDA-24234 CHAPTER 3 Page 189 Revision 3.0 INSTALLATION PROCEDURE Figure 013-1 LT Cable Routing NAP-200-013 Sheet 4/13 Cable Running from the PBX to MDF, ATTCON, MAT, and SMDR (PIM3) (TOPU) (PIM2) (PIM1) (PIM0) (LPR) (BASEU) (FANU) REAR VIEW
CHAPTER 3 NDA-24234 Pag e 19 0 Revision 3.0 INSTALLATION PROCEDURE Figure 013-2 Cable Routing of Circuit Card Front Cable NAP-200-013 Sheet 5/13 Cable Running from the PBX to MDF, ATTCON, MAT, and SMDR Cable Duct SIDE VIEW FRONT VIEWCable Cable HoleCircuit Card Front Connector Circuit Card Up to three circuit card front cables can be run through the cable hole.Six circuit card front cables can be accommodated; three on the left side, and three on the right side.