    							NDA-24234 CHAPTER 5
    Page 311
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-025
    Sheet 1/1
    Station to Station Connection Test
    START
    Confirm that a connection can be established between Station “A” and Station “B.”
    Station “A” goes off-hook.
    Station “A” hears DT.
    Station “A” dials the station number of Station “B.”
    Station “A” confirms that DT stops when the first digit has been dialed.
    Station “A” confirms that RBT (Ring Back Tone) is heard after dialing ends.
    Station “B” hears ringing on the telephone set.
    Station “B” lifts handset and answers the call.
    After answering, both Stations “A” and “B” confirm that they can talk with 
    each other.
    Stations “A” and “B” hang up. The connection is released.
    END
    LC
    ORT
    ADT, ROT
    LCB
    RG
    *
    *
    *
    *
    * 
    						
    							CHAPTER 5 NDA-24234
    Pag e 31 2
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    3. SYSTEM INITIALIZED TEST
    3.1 Outline
    Tests are to be performed on the restart processing (reinitialization) and system changeover functions which en-
    able the system to restart its operations and services.
    3.2 System Initialized Test Procedure
    The System Changeover Test and Initialization Tests are to be performed per the NAP Numbers indicated to the
    right of each item in the following flowchart.
    START
    System Changeover Test:NAP-200-026
    System Initialization Test:NAP-200-027
    Circuit Card Initialization Test:NAP-200-028
    END 
    						
    							NDA-24234 CHAPTER 5
    Page 313
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Test Outline:
    Tests are performed to see if a changeover of the dual systems (Control Systems and Speech Path Systems) of the
    PBX can be executed.
    NAP-200-026
    Sheet 1/7
    System Changeover Test Single IMG and Multiple IMG Configuration
    START
    Perform a Control System Changeover test by switch operations
    Control System change-
    over via MBR switch on 
    the DSP (PZ-DK224) 
    cardOn the DSP card of which OPE lamp is turning ON, flip the 
    “MBR” switch DOWN➝UP➝DOWN (OFF➝ON➝OFF).
    The lamp indication of the DSP changes to “DSP in ST-BY 
    mode” shown in Figure 026-1.
    System message “7-C” and “7-D” are displayed in 
    succession.
    CPU changeover via 
    switch (Forced Change-
    over)Designate CPU changeover via the “CPU SEL” switch on 
    the EMA (PH-PC 40) card.
    CPU SEL SW UP Position: No. 0 ACT
    CPU SEL SW DOWN Position: No. 1 ACT
    System Messages “7-C” and “7-D” are displayed in 
    succession.
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    A 
    						
    							CHAPTER 5 NDA-24234
    Pag e 31 4
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Figure 026-1  How to Perform a Control System Changeover (Single IMG Configuration)
    Figure 026-2  How to Perform a Control System Changeover (Multiple IMG Configuration)
    NAP-200-026
    Sheet 2/7
    System Changeover Test Single IMG and Multiple IMG Configuration
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    Flip the MBR switch
    on the DSP.CPUOPEWDT
    IMG0
    IMG1
    IMG2 IMG3 MBR
    LegendDSP in ACT modeDSP in ST-BY mode
    : Lamp is OFF : Lamp is Flashing (Green) : Lamp is ON (Green)
    CPUOPEWDT
    IMG0
    IMG1
    IMG2 IMG3 MBR
    Flip the MBR switch
    on the DSP.CPUOPEWOT
    IMG0
    IMG1
    IMG2 IMG3 MBR
    LegendDSP in ACT modeDSP in ST-BY mode
    : Lamp is OFF : Lamp is Flashing (Green) : Lamp is ON (Green)CPUOPEWDT
    IMG0
    IMG1
    IMG2
    IMG3 MBR 
    						
    							NDA-24234 CHAPTER 5
    Page 315
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Figure 026-3  LEDs and Switches on TSW/MUX
    NAP-200-026
    Sheet 3/7
    System Changeover Test Single IMG Configuration
    Perform a TSW system changeover test by means of switch operations. (Refer to Figure 026-3)
    TSW changeover via 
    switch.On the TSW (PH-SW10) card on which the “TSW 
    ACT” lamp is turning ON, flip the “TSW MBR” switch 
    DOWN-UP-DOWN.
    System Messages “7-E,” “7-F” and “1-T” are displayed 
    in succession.
    Perform a PLO system changeover test, if TSW (PH-SW10) is provided in dual.
    On the TSW card of which PLO ACT lamp is turning 
    ON, flip the “PLO MBR” switch DOWN-UP-DOWN.
    System message “7-G” and “7-H” are displayed in 
    succession.
    END
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    A
    FRONT VIEW
    TSW (PH-SW10) MUX (PH-PC36)
    TSW ACT
    MUX ACTMUX ACT
    MB PLO ACT
    MB
    TSW MBR
    PLO MBR 
    						
    							CHAPTER 5 NDA-24234
    Pag e 31 6
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    NAP-200-026
    Sheet 4/7
    System Changeover Test Multiple IMG Configuration
    Perform a Speech Path system changeover test by switch operations. (Refer to Figure 026-4)
    TSW changeover via 
    switchOn the active GT (PA-GT09) card on which the “OPE/MB” 
    lamp is illuminating, flip the “MBR” switch DOWN-UP-
    DOWN.
    Make sure that the active Speech Path system has been 
    changed over to the ST-BY mode. (Check all the related 
    circuit cards, which were formerly active, have been totally 
    changed over to the ST-BY mode. 
    Analyze the system messages “7-E,” “7-F” and “1-T” to be 
    displayed automatically.
    Perform a PLO system changeover test by switch operations. (Refer to Figure 026-3)
    PLO changeover via 
    switch.On the PLO card on which the “ACT/OPE” lamp is 
    illuminating, flip the “MB” switch DOWN-UP-DOWN.
    Note
    Make sure that the active PLO system has been changed over 
    to the ST-BY mode (“ACT/O PE” lamp goes OFF).
    END
    Analyze the system messages “7-U” and “7-V” to be 
    displayed automatically.
    Note:As the PLO, any of the following cards can be used:
    PH-CK16
    PH-CK17
    PH-CK16-A
    PH-CK17-A
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    A
    Circuit Cards to be affected
    TSW (PH-SW12)
    DLKC (PH-PC20)
    MUX (PH-PC36)
    Note:Refer to Figure 026-4. 
    						
    							NDA-24234 CHAPTER 5
    Page 317
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Figure 026-4  LEDs and Switches for System Changeover (Multiple IMG Configuration)
    NAP-200-026
    Sheet 5/7
    System Changeover Test Multiple IMG Configuration
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    MUX (PH-PC36)
    MUX ACT
    MBTSW (PH-SW12)GT (PA-GT09)
    OPE/MB
    MBRMBDLKC (PH-PC20)
    OPE/MB
    MB
    FRONT VIEW
    TSW ACT
    TSW MBRMB
    PLO Note 1
    OPE/ACT Note 2
    MB
    Note 1:PH-CK16/PH-CK17, or PH-CK16-A/PH-CK17-A
    Note 2:“OPE” for PH-CK16-A/PH-CK17-A, “ACT” for PH-CK16/PH-CK17 
    						
    							CHAPTER 5 NDA-24234
    Pag e 31 8
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Figure 026-5  System Block Diagram (TSW and MUX) (Multiple IMG Configuration)
    NAP-200-026
    Sheet 6/7
    System Changeover Test Single IMG Configuration
    LC/TRK
    LC/TRK
    LC/TRK
    LC/TRK
    MUX
    MUX
    MUX
    MUX TSW/INT/PLO
    CPU
    GT
    LANI
    PCM HW
    PM BUS
    PCM HW
    PM BUS
    PCM HW
    PM BUS
    PCM HW
    PM BUS
    D
    T
    GTSW/INT
    PLOLV D S
    MUX
    CFT From EM A
    MUSIC
    MUX
    LC/TRK
    PHSW10DTI DCS
    CPR 
    						
    							NDA-24234 CHAPTER 5
    Page 319
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Figure 026-6  System Block Diagram (GT and Other Controlling Blocks) (Multiple IMG Configuration)
    NAP-200-026
    Sheet 7/7
    System Changeover Test Multiple IMG Configuration
    This figure shows a system block diagram centering on the CPU and its controlling GT. Although each side ap-
    pears to have complicated connections, the controlling route of CPU 0 goes directly to GT 0, and that of CPU 1
    to GT 1. Therefore, if the system of CPU  is once changed over, the ACT/ST-BY of GT is also changed over.
    MUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUX
    IMG 0 IMG 1 IMG 2 IMG 3
    TSW 00TSW 10
    TSW 11 TSW 12
    TSW 03TSW 13
    DLKC 0
    DLKC 1
    TSW 01TSW 02
    TSW I/O BUSTSW I/O BUS
    GT 0GT 1
    LANILANI
    CPR 1
    LANILANI
    CPR 0
    PLO 1
    PLO 0
    ISAGT
    CPU 1ISAGT
    CPU 0
    EMA
    IOC/
    MISC
    MISC BUS
    ISAGT:  PZ-GT13
    DLKC:  PH-PC20 LANI:  PZ-PC19
    EMA:   PH-PC40 GT:  PH-GT09
    IOC: PH-IO24TSW: PH-SW12
    PLO:   PH-CK16/17, or PH-CK16-A/17AMUX: PH-PC36
    Note:Because the ACT/ST-BY changeover of CPU also affects the GT status, the MBR key on the GT card is
    not used for GT system changeover. The key is used to switch over the Speech Path System, involving the
    TSW, DLKC, and MUX circuit cards. (See the next page.)
    As shown below, though an ex-
    ternal cable is physically con-
    nected between ISAGT #0 and
    GT #1, the actual control signal
    is sent/received only between IS-
    AGT 0 and GT 0 via the back-
    board bus.
    GT 0GT 1
    ISAGT0
    CPU
    IOP0
    Backboard
    External Cable
    Backboard BusT 
    						
    							CHAPTER 5 NDA-24234
    Pag e 32 0
    Revision 3.0
    INSTALLATION TEST PROCEDURE
    Figure 026-7  System Block Diagram (Speech Path) (Multiple IMG Configuration)
    NAP-200-026
    Sheet 8/8
    System Changeover Test Multiple IMG Configuration
    This figure shows a system block diagram centering on the GT and its controlling Speech Path System. By chang-
    ing over the ACT/ST-BY of the Speech Path System, all the related systems, such as TSW/INT, DLKC, and MUX,
    are totally switched over. The changeover can be executed by a key operation on the active GT card.
    MUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUXMUX
    IMG 0 IMG 1 IMG 2 IMG 3
    TSW 00TSW 10
    TSW 11 TSW 12
    TSW 03TSW 13
    DLKC 0
    DLKC 1
    TSW 01TSW 02
    TSW I/O BUSTSW I/O BUS
    LANILANI
    CPR 1
    LANILANI
    CPR 0
    PLO 1
    PLO 0
    ISAGT:  PZ-GT13
    DLKC:  PH-PC20 LANI:  PZ-PC19  GT:  PH-GT09 TSW: PH-SW12
    PLO:   PH-CK16/17, or PH-CK16-A/17AMUX: PH-PC36
    Note:If the MBR key is once flipped on the active GT card, all the Speech Path related systems (TSW/INT,
    DLKC, and MUX) in the same switching block are totally changed over. However, the ACT/ST of GT and
    PLO is not affected.
    PM BUS
    PCM HW PM BUS PM BUS PM BUS PM BUS
    PM BUS PM BUS PM BUS PM BUS PM BUS PM BUS PM BUS PM BUS PM BUS PM BUSPM BUS
    PCM HW PCM HW
    PCM HW PCM HW PCM HW PCM HW
    PCM HW PCM HW PCM HW PCM HW PCM HWPCM HW PCM HW PCM HW PCM HW
    Line/Trunk PM Line/Trunk PM Line/Trunk PM Line/Trunk PM
    ISAGT
    CPU 0
    GT 0
    GT 1
    CPU 1
    ISAGT 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2400 Imx Installation Manual