Home > NEC > Communications System > NEC Neax 2400 Imx Installation Manual

NEC Neax 2400 Imx Installation Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2400 Imx Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 410
    							NDA-24234 CHAPTER 3
    Page 101
    Revision 3.0
    INSTALLATION PROCEDURE
     
    NAP-200-010
    Sheet 6/71
    Internal Cable Connections 
    Table 010-1  Quick Reference Table (5/6)
    SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-21 010-14
    IMG3010-19 010-12
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-37-
    IMG3010-35-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-6 011-6
    IMG1-IMG3011-8 011-8
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    IMG0-IMG3011-13 011-13
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-21 010-14
    IMG3010-20 010-13
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-37-
    IMG3010-36-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-6 011-6
    IMG1-IMG3011-9 011-9
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    IMG0-IMG3011-13 011-13
    PIM0PIM0
    PIM0 PIM0
    LPM
    IMG0
    IMG1
    DUMMY
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1 PIM1
    PIM1
    PIM1 PIM2
    PIM2PIM3
    PIM3
    IMG3 IMG2
    14-PIM System
    FA N U
    BASEUTOPUTOPU
    TO P U
    TOPU
    BASEU BASEU
    BASEU FA N UFA N U
    PIM0PIM0
    PIM0 PIM0
    LPM
    IMG0
    IMG1
    DUMMY
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1 PIM1
    PIM1
    PIM1 PIM2
    PIM2PIM2 PIM3
    PIM3IMG3 IMG2
    BASEUTOP U
    FA N UFA N U
    FA N U FA N U TOPU TOPU TOPU
    BASEUBASEU
    BASEU15-PIM System 
    						
    							CHAPTER 3 NDA-24234
    Pag e 10 2
    Revision 3.0
    INSTALLATION PROCEDURE
     
    NAP-200-010
    Sheet 7/71
    Internal Cable Connections 
    Table 010-1  Quick Reference Table (6/6)
    SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-21 010-14
    IMG3010-21 010-14
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-37-
    IMG3010-37-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-6 011-6
    IMG1-IMG3011-10 011-10
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    IMG0-IMG3011-13 011-13
    PIM0PIM0
    PIM0 PIM0
    LPM
    IMG0
    IMG1
    DUMMY
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1 PIM1
    PIM1
    PIM1 PIM2
    PIM2PIM2PIM3 PIM3
    PIM3IMG3 IMG2
    TOPU
    FA N U
    BASEU
    BASEUBASEUBASEUFA N U FA N U
    FA N UTO P U TOPU TO P U
    16-PIM System 
    						
    							NDA-24234 CHAPTER 3
    Page 103
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 010-1  Locations of Connectors on the PIM Backplane
    NAP-200-010
    Sheet 8/71
    Internal Cable Connections
    26
    LT 7
    AT I 0
    1
    2
    3
    1
    2
    3
    4 1
    2
    3
    4
    2625
    01
    50
    PLO
    2501
    26
    50LT 6
    250126
    50LT 1 1 LT 8
    25
    01
    502501
    26 50LT 3
    25
    01
    26 50
    LT 2
    A
    B
    10
    01ALMBA
    B
    10
    01 AT I 1A
    B
    1001
    PWRA PWRB -48V1
    -48V0FA N
    25
    01
    50LT 4
    25
    01
    5025
    01
    50
    LT 5
    2501
    50LT 9
    2501
    50LT 1 02501
    26 50LT 1
    25
    01
    26 50
    LT 0
    A
    BA
    BA
    BALMA
    BUS1A2001
    20
    01BUS0A10
    01
    CONN12 CONN13
    CONN11
    CONN01
    CONN00CONN10
    PLO1
    PLO0
    MUSIC0MUSIC1
    CONN02
    CONN03
    26
    26
    26
    26
    26
    1
    1
    2
    3
    2
    3
    4 
    						
    							CHAPTER 3 NDA-24234
    Pag e 10 4
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 010-2  Locations of Connectors on the LPM Backplane
    NAP-200-010
    Sheet 9/71
    Internal Cable Connections
    FA L M
    DSP
    ALM
    PWRA0 PWRA1
    PWRB0
    PWRB1
    PA L M 1PA L M 0EBUS1
    EMA IOCMISC
    MISC
    MISC
    EBUS0BUS1 BUS0
    KEY FA N
    BZ-C21
    MISC1B
    MISC2B
    MISC3B
    MISC4B
    LED3LED2 LED1
    ALM3
    ALM2 MUSICALM1
    EXALM MISC1A
    MISC2A
    MISC3A
    MISC4A 
    						
    							NDA-24234 CHAPTER 3
    Page 105
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 010-3  Location of Connectors on the TSWM Backplane (Multiple IMG Configuration)
    NAP-200-010
    Sheet 10/71
    Internal Cable Connections
    PWRB
    MISC1B
    MISC2B
    MISC3B
    MIO31
    MUX003MUX002MUX001
    MUX000
    MUX013MUX012
    MUX011MUX010MUX023MUX022
    MUX021MUX020MUX033 MUX032
    MUX031MUX030MUX103 MUX102
    MUX101
    MUX100MUX113MUX112
    MUX111
    MUX110MUX123
    MUX122
    MUX121
    MUX120MUX133
    MUX132 MUX131MUX130
    EMAFHEXCLK0EXCLK1IOP1
    IOP0MIO30
    MIO20
    MIO0
    MIO21
    MIO1 MISC3AMISC2A
    MISC4B
    MISC5BMISC5A MISC4AMISC1A
    PWRA
    TIORES1TIORES0MIORES1
    MIORES0
    FA L M
    ALM EMA 
    						
    							CHAPTER 3 NDA-24234
    Pag e 10 6
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 010-4  Locations of Connectors on the Power Distribution Terminal Board (PZ-M371)
    NAP-200-010
    Sheet 11/71
    Internal Cable Connections
    PIM
    LPM
    BASEU
     POWER DISTRIBUTION TERMINAL BOARD     
    REAR VIEW
    DETAIL OF BOARD PA 0 P B 0 PA 1 P B 1 PA 2 P B 2 PA 3 P B 3 PA 4 P B 4
    GA0
    +80AGB0
    GB1 -48VB GA1 -48VA
    PZ-M371 
    						
    							NDA-24234 CHAPTER 3
    Page 107
    Revision 3.0
    INSTALLATION PROCEDURE
    Run the power cables, referring to Figure 010-6. Then, fasten the cables to the cabinet, referring to Figure 010-5.
    Figure 010-5  Power Cable Connections for 1-PIM System (Single IMG Configuration)
    NAP-200-010
    Sheet 12/71
    Internal Cable Connections
    Note:Normally, the cables are fastened onto the cabinet at the proposed locations, where small dots ( ) are pro-
    vided in this figure.
    PZ-M371 PKGBackplane
    FR
    O
    NTRE
    AR
    Below is the rough sketch of how to run the power cables for the 1-PIM system. For details on actual cable  
    runnings, see Figure 010-6. 
    						
    							CHAPTER 3 NDA-24234
    Page 108
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 010-6  Details on Power Cable Connections (for 1-PIM System) (Single IMG Configuration)
    NAP-200-010
    Sheet 13/71
    Internal Cable Connections
    INPWR
    PA L M
     OUT
    PWR
    PA L M
    PB 1PA  1PB 0PA  0
     PA L M  1 PA L M  0
     PWR B1  PWR A1
     PWR B  PWR A
     PWR A0 PWR B0
    0001 0203
    0405 06
    0001 02 03
    0405 06
    00 01
     PWR
    02 03
     PWR
    PZ-M371
     (1) (3) (5) (7)  (9)
     (2) (4)
     (6) (8) (10)
    (BASEU)(BASEU) (LPR)(LPR)
    BSCM(PIM 0)
    (PIM 0) TOPUTOPU
    NEAXFRONT VIEW REAR VIEW
    Connect the power cables as shown below. Cables represented in dotted-lines indicate power cable 
     -48V1  -48V0
    BSCM
    for a dual-system.
    INPWR
    OUT
    PWR
    -48V0-48V
    1 
    						
    							NDA-24234 CHAPTER 3
    Page 109
    Revision 3.0
    INSTALLATION PROCEDURE
    NAP-200-010
    Sheet 14/71
    Internal Cable Connections
    Table 010-2  Power Cable Connection for IMG0 (Single IMG Configuration)
    No.FROM TO
    CABLE NAME REMARKS
    UNIT/
    MODULECONNECTOR
    NAMEUNIT/
    MODULECONNECTOR
    NAME
    1 LPR INPWR BASEU PA0 4P-2P PWR CA-A
    2 LPR INPWR BASEU PB0 4P-2P PWR CA-B
    3 BASEU PA1 PIM0 PWR A 4P PWR CA-C
    4 BASEU PB1 PIM0 PWR B 4P PWR CA-D
    5 LPR PALM LPR PALM 0 10AL-(110) FLT CA
    6 LPR OUT PWR LPR PWR A1/PWR B1 6P-(4P-3P) PWR CA-B
    7 LPR OUT PWR LPR PWR A0/PWR B0 6P-(4P-3P) PWR CA-A
    8 LPR PALM LPR PALM 1 10AL-(130) FLT CA
    9 PIM0 (PWR) -48V IN CONN PIM0 -48V0 3P PWR CA-A -48V0
    10 PIM0 (PWR) -48V IN CONN PIM0 -48V1 3P PWR CA-B -48V1 
    						
    							CHAPTER 3 NDA-24234
    Page 110
    Revision 3.0
    INSTALLATION PROCEDURE
    Run the power cables, referring to Figure 010-6. Then, fasten the cables to the cabinet, referring to Figure 010-7.
    Figure 010-7  Power Cable Connections for 2-PIM System (Single IMG Configuration)
    NAP-200-010
    Sheet 15/71
    Internal Cable Connections
    Below is the rough sketch of how to run the power cables for the 2-PIM system. For details on actual cable run-
    nings, see Figure 010-6.
    Note:Normally, the cables are fastened onto the cabinet at the proposed locations, where small dots ( ) are
    provided in this figure.
    Backplane
    Backplane
    PZ-M371 PKG
    F
    RO
    NT
    R
    EAR
    Backplane
    Backplane
    PZ-M371 PKG 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2400 Imx Installation Manual