NEC Neax 2400 Imx Installation Manual
Have a look at the manual NEC Neax 2400 Imx Installation Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
NDA-24234 CHAPTER 3 Page 101 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 6/71 Internal Cable Connections Table 010-1 Quick Reference Table (5/6) SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE Power CableIMG0010-13 010-6 IMG1010-17 010-10 IMG2010-21 010-14 IMG3010-19 010-12 Internal CableIMG0010-30 010-19 IMG1010-34 010-23 IMG2010-37- IMG3010-35- Inter-Frame Bus CableIMG0-IMG1011-1 011-1 011-2 011-2 IMG1-IMG2011-6 011-6 IMG1-IMG3011-8 011-8 Inter-Frame Alarm Bus CableIMG0-IMG1011-11 011-11 IMG0-IMG2011-12 011-12 IMG0-IMG3011-13 011-13 Power CableIMG0010-13 010-6 IMG1010-17 010-10 IMG2010-21 010-14 IMG3010-20 010-13 Internal CableIMG0010-30 010-19 IMG1010-34 010-23 IMG2010-37- IMG3010-36- Inter-Frame Bus CableIMG0-IMG1011-1 011-1 011-2 011-2 IMG1-IMG2011-6 011-6 IMG1-IMG3011-9 011-9 Inter-Frame Alarm Bus CableIMG0-IMG1011-11 011-11 IMG0-IMG2011-12 011-12 IMG0-IMG3011-13 011-13 PIM0PIM0 PIM0 PIM0 LPM IMG0 IMG1 DUMMY PIM2 PIM3 TSWM DUMMY PIM1 PIM1 PIM1 PIM1 PIM2 PIM2PIM3 PIM3 IMG3 IMG2 14-PIM System FA N U BASEUTOPUTOPU TO P U TOPU BASEU BASEU BASEU FA N UFA N U PIM0PIM0 PIM0 PIM0 LPM IMG0 IMG1 DUMMY PIM2 PIM3 TSWM DUMMY PIM1 PIM1 PIM1 PIM1 PIM2 PIM2PIM2 PIM3 PIM3IMG3 IMG2 BASEUTOP U FA N UFA N U FA N U FA N U TOPU TOPU TOPU BASEUBASEU BASEU15-PIM System
CHAPTER 3 NDA-24234 Pag e 10 2 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 7/71 Internal Cable Connections Table 010-1 Quick Reference Table (6/6) SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE Power CableIMG0010-13 010-6 IMG1010-17 010-10 IMG2010-21 010-14 IMG3010-21 010-14 Internal CableIMG0010-30 010-19 IMG1010-34 010-23 IMG2010-37- IMG3010-37- Inter-Frame Bus CableIMG0-IMG1011-1 011-1 011-2 011-2 IMG1-IMG2011-6 011-6 IMG1-IMG3011-10 011-10 Inter-Frame Alarm Bus CableIMG0-IMG1011-11 011-11 IMG0-IMG2011-12 011-12 IMG0-IMG3011-13 011-13 PIM0PIM0 PIM0 PIM0 LPM IMG0 IMG1 DUMMY PIM2 PIM3 TSWM DUMMY PIM1 PIM1 PIM1 PIM1 PIM2 PIM2PIM2PIM3 PIM3 PIM3IMG3 IMG2 TOPU FA N U BASEU BASEUBASEUBASEUFA N U FA N U FA N UTO P U TOPU TO P U 16-PIM System
NDA-24234 CHAPTER 3 Page 103 Revision 3.0 INSTALLATION PROCEDURE Figure 010-1 Locations of Connectors on the PIM Backplane NAP-200-010 Sheet 8/71 Internal Cable Connections 26 LT 7 AT I 0 1 2 3 1 2 3 4 1 2 3 4 2625 01 50 PLO 2501 26 50LT 6 250126 50LT 1 1 LT 8 25 01 502501 26 50LT 3 25 01 26 50 LT 2 A B 10 01ALMBA B 10 01 AT I 1A B 1001 PWRA PWRB -48V1 -48V0FA N 25 01 50LT 4 25 01 5025 01 50 LT 5 2501 50LT 9 2501 50LT 1 02501 26 50LT 1 25 01 26 50 LT 0 A BA BA BALMA BUS1A2001 20 01BUS0A10 01 CONN12 CONN13 CONN11 CONN01 CONN00CONN10 PLO1 PLO0 MUSIC0MUSIC1 CONN02 CONN03 26 26 26 26 26 1 1 2 3 2 3 4
CHAPTER 3 NDA-24234 Pag e 10 4 Revision 3.0 INSTALLATION PROCEDURE Figure 010-2 Locations of Connectors on the LPM Backplane NAP-200-010 Sheet 9/71 Internal Cable Connections FA L M DSP ALM PWRA0 PWRA1 PWRB0 PWRB1 PA L M 1PA L M 0EBUS1 EMA IOCMISC MISC MISC EBUS0BUS1 BUS0 KEY FA N BZ-C21 MISC1B MISC2B MISC3B MISC4B LED3LED2 LED1 ALM3 ALM2 MUSICALM1 EXALM MISC1A MISC2A MISC3A MISC4A
NDA-24234 CHAPTER 3 Page 105 Revision 3.0 INSTALLATION PROCEDURE Figure 010-3 Location of Connectors on the TSWM Backplane (Multiple IMG Configuration) NAP-200-010 Sheet 10/71 Internal Cable Connections PWRB MISC1B MISC2B MISC3B MIO31 MUX003MUX002MUX001 MUX000 MUX013MUX012 MUX011MUX010MUX023MUX022 MUX021MUX020MUX033 MUX032 MUX031MUX030MUX103 MUX102 MUX101 MUX100MUX113MUX112 MUX111 MUX110MUX123 MUX122 MUX121 MUX120MUX133 MUX132 MUX131MUX130 EMAFHEXCLK0EXCLK1IOP1 IOP0MIO30 MIO20 MIO0 MIO21 MIO1 MISC3AMISC2A MISC4B MISC5BMISC5A MISC4AMISC1A PWRA TIORES1TIORES0MIORES1 MIORES0 FA L M ALM EMA
CHAPTER 3 NDA-24234 Pag e 10 6 Revision 3.0 INSTALLATION PROCEDURE Figure 010-4 Locations of Connectors on the Power Distribution Terminal Board (PZ-M371) NAP-200-010 Sheet 11/71 Internal Cable Connections PIM LPM BASEU POWER DISTRIBUTION TERMINAL BOARD REAR VIEW DETAIL OF BOARD PA 0 P B 0 PA 1 P B 1 PA 2 P B 2 PA 3 P B 3 PA 4 P B 4 GA0 +80AGB0 GB1 -48VB GA1 -48VA PZ-M371
NDA-24234 CHAPTER 3 Page 107 Revision 3.0 INSTALLATION PROCEDURE Run the power cables, referring to Figure 010-6. Then, fasten the cables to the cabinet, referring to Figure 010-5. Figure 010-5 Power Cable Connections for 1-PIM System (Single IMG Configuration) NAP-200-010 Sheet 12/71 Internal Cable Connections Note:Normally, the cables are fastened onto the cabinet at the proposed locations, where small dots ( ) are pro- vided in this figure. PZ-M371 PKGBackplane FR O NTRE AR Below is the rough sketch of how to run the power cables for the 1-PIM system. For details on actual cable runnings, see Figure 010-6.
CHAPTER 3 NDA-24234 Page 108 Revision 3.0 INSTALLATION PROCEDURE Figure 010-6 Details on Power Cable Connections (for 1-PIM System) (Single IMG Configuration) NAP-200-010 Sheet 13/71 Internal Cable Connections INPWR PA L M OUT PWR PA L M PB 1PA 1PB 0PA 0 PA L M 1 PA L M 0 PWR B1 PWR A1 PWR B PWR A PWR A0 PWR B0 0001 0203 0405 06 0001 02 03 0405 06 00 01 PWR 02 03 PWR PZ-M371 (1) (3) (5) (7) (9) (2) (4) (6) (8) (10) (BASEU)(BASEU) (LPR)(LPR) BSCM(PIM 0) (PIM 0) TOPUTOPU NEAXFRONT VIEW REAR VIEW Connect the power cables as shown below. Cables represented in dotted-lines indicate power cable -48V1 -48V0 BSCM for a dual-system. INPWR OUT PWR -48V0-48V 1
NDA-24234 CHAPTER 3 Page 109 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 14/71 Internal Cable Connections Table 010-2 Power Cable Connection for IMG0 (Single IMG Configuration) No.FROM TO CABLE NAME REMARKS UNIT/ MODULECONNECTOR NAMEUNIT/ MODULECONNECTOR NAME 1 LPR INPWR BASEU PA0 4P-2P PWR CA-A 2 LPR INPWR BASEU PB0 4P-2P PWR CA-B 3 BASEU PA1 PIM0 PWR A 4P PWR CA-C 4 BASEU PB1 PIM0 PWR B 4P PWR CA-D 5 LPR PALM LPR PALM 0 10AL-(110) FLT CA 6 LPR OUT PWR LPR PWR A1/PWR B1 6P-(4P-3P) PWR CA-B 7 LPR OUT PWR LPR PWR A0/PWR B0 6P-(4P-3P) PWR CA-A 8 LPR PALM LPR PALM 1 10AL-(130) FLT CA 9 PIM0 (PWR) -48V IN CONN PIM0 -48V0 3P PWR CA-A -48V0 10 PIM0 (PWR) -48V IN CONN PIM0 -48V1 3P PWR CA-B -48V1
CHAPTER 3 NDA-24234 Page 110 Revision 3.0 INSTALLATION PROCEDURE Run the power cables, referring to Figure 010-6. Then, fasten the cables to the cabinet, referring to Figure 010-7. Figure 010-7 Power Cable Connections for 2-PIM System (Single IMG Configuration) NAP-200-010 Sheet 15/71 Internal Cable Connections Below is the rough sketch of how to run the power cables for the 2-PIM system. For details on actual cable run- nings, see Figure 010-6. Note:Normally, the cables are fastened onto the cabinet at the proposed locations, where small dots ( ) are provided in this figure. Backplane Backplane PZ-M371 PKG F RO NT R EAR Backplane Backplane PZ-M371 PKG