NDA-24234 CHAPTER 5 Page 331 Revision 3.0 INSTALLATION TEST PROCEDURE If the TLT is a 4W E&M System, connect the related leads as shown below. Set up a loop-back connection between the DTI Trunk to be tested and another DTI Trunk as shown below: Figure 032-3 DTI Test Configuration If the office is the primary office (Clock-Source-Office), perform the tests by disconnecting the PLO and the M-OSC. (The mode of the PLO becomes “Self Operation Mode.”) NAP-200-032 Sheet 3/3 Outgoing Trunk (COT, TLT, DTI Card) Connection Test T RT R T R E MT R E MRe- ceive SendRe- ceive Send TLT TLT E ME M LCDTIA LCBDTI RA RBRA RB TA TBTA TBRe- ceive SendRe- ceive Send DTI DTI
CHAPTER 5 NDA-24234 Pag e 33 2 Revision 3.0 INSTALLATION TEST PROCEDURE Test Outline: The purpose of this test is to confirm, by setting up an incoming trunk connection test for each incoming trunk, that speech can be made with the ATTCON when a Ringdown Signal Interface is used, or with a station when a Dial-In Signal Interface is used. This test also confirms that the call can be released. Incoming trunks must be tested one at a time using the sequence of Route and Trunk Numbers assigned at each office. NAP-200-033 Sheet 1/2 Incoming Trunk (COT, TLT, DTI Card) Connection Test START On the MDF, make temporary cross connections between the Incoming Trunk to be tested and an outgoing trunk as a loop-back circuit.Referring to Figures 032-1 through 032-3 in NAP-200-032, make temporary cross connections on the MDF for a loop- back circuit. Temporarily assign Office Data from the MAT so that a loop- back connection from the trunk can be established. Make busy all outgoing trunks other than the cross-connected trunk. Test Incoming trunk circuits one at a time. For Ringdown Signal Interface.Station “A” dials the station number of Station “C”. The call terminates to an Attendant Console. The Attendant Console answers the call and confirms speech. The call is released. Make temporary connections for the next trunk to be tested. A B
NDA-24234 CHAPTER 5 Page 333 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-033 Sheet 2/2 Incoming Trunk (COT, TLT, DTI Card) Connection Test For a Dial-In Signal Interface.Station “A” dials the access code for the outgoing trunk and the number of Station “B”. Station “B” answers the call and confirms speech. The call is released. Make temporary cross connections for the next trunk to be tested. Restore the temporary cross connections, temporary Office Data, etc. to the original. A ENDB
CHAPTER 5 NDA-24234 Pag e 33 4 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-034 Sheet 1/1 Direct-In Termination Trunk (COT Card) Connection Test START On the MDF, make temporary cross connections between the Trunk for Direct-In Termination (DIT) and an LC. C.O.Line Incoming Call Station “B” dials the number of LC “C” (Station “C”). Incoming Call to Station via DIT Trunk.The call terminates to Station “A”; Station “A” rings. Confirm that the ringing is distinct from that of an intra- office call or ordinary C.O. call. The ringing signal for Direct-In Termination calls can be the same as that used for C.O. calls if the related Office Data is assigned. System Data SYS1, INDEX 72, SYS3, INDEX 0, and parameter DR of Command “ARTD”. Answer and Talk Station “A” goes off-hook. Stations “A” and “B” talk with each other. Release Station “A” and “B” both go on-hook. Remove the temporary cross connections. END B LCC LCA DIT LC COT
NDA-24234 CHAPTER 5 Page 335 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-035 Sheet 1/1 SND (RST Card) Connection Test START When a C.O. Line or Tie Line is not connected with the trunk, make an arrangement for trunk loop-back as illustrated above.On the MDF, make temporary cross connections for a loop back circuit. Temporarily assign Office Data from the MAT so that a connection can be set up with Station “B” via a SND. Make busy all SNDs On the front of the RST circuit card, set all MBS switches (0-7) to the OFF position, thereby making all SNDs busy. Test SNDs one after another Un-busy (make idle) only the SND to be tested. Station “A” dials the access code of the trunk and the station number of Station “B”. Station “B” answers and talks The call is released. Restore the temporary cross connections, temporary Office Data etc. to the original. END B LC LC A COT LC SND ORT MAT
CHAPTER 5 NDA-24234 Pag e 33 6 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-036 Sheet 1/1 3-party Conference Trunk Function Test START Made busy all CFTs Made busy all CFTs using MAT command “MBTK”. Test CFTs one at a time Un-busy (make idle) only the CFT to be tested. Stations “A” and “B” are engaged in a station to station connection. Station “A” makes a Switch Hook Flash (SHF) and after hearing DT, dials the station number of Station “C”. Station “C” answers the call. Station “A”, after having talked with Station “C”, makes a SHF and confirms that a three-way connection has been set up. The call is released. Cancel the Make Busy of the CFTUn-busy (make idle) the CFT using the “MBTK” command. END B LC C LC A LC SPDT,RBT RC C F T TSW/INT CARD
NDA-24234 CHAPTER 5 Page 337 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-037 Sheet 1/1 Connection Test-Announcement Trunk for Announcement Service START Dial the announcement service codeStation “A” dials the announcement service code. Check the contents of the announcementStation “A” is connected to the announcement machine and hears the announcement. Dial the announcement service codeStation “B” dials the announcement service code. Check the contents of the announcementStation “B” is connected to the announcement machine and hears the announcement. Release Confirm that the announcement machine stops when both Stations “A” and “B” goes on-hook. END LCA LC B ANNOUNCEMENT TRK ANNOUNCEMENT MACHINE
CHAPTER 5 NDA-24234 Pag e 33 8 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-038 Sheet 1/1 Connection Test-Digital Announcement Trunk for Announcement Service START Dial the announcement service code Station “A” dials the announcement service code. Check the contents of the announcementStation “A” is connected to the announcement trunk and hears the announcement. Dial the announcement service code Station “B” dials the announcement service code. Check the contents of the announcementStation “B” is connected to the announcement trunk and hears the announcement. Release Confirm that the announcement stops when both Stations “A” and “B” goes on-hook. END LCA LC B ANNOUNCEMENT TRK DAT
NDA-24234 CHAPTER 5 Page 339 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-039 Sheet 1/1 Connection Test-Paging Trunk for Paging Access Service START Dial the paging access code Station “A”/ATTCON dials the paging access code and hears CRBT (Continuous Ringback Tone). In about 1 second, CRBT stops. Speaker Paging Check whether speaker paging is possible after CRBT has stopped. Release Station “A” goes on-hook or the ATTCON depresses the CANCEL key. END LCA ATTCON PGT AMP SP
CHAPTER 5 NDA-24234 Pag e 34 0 Revision 3.0 INSTALLATION TEST PROCEDURE Paging Transfer Service can be selected according to System Data (SYS1, INDEX 73). 1. Non-Delay System 2. Delay and Non-Delay System 3. Paging Transfer Supervision NAP-200-040 Sheet 1/2 Connection Test-Paging Trunk for Paging Transfer Service START Call the Paging Trunk Stations “A” and “B” are engaged in a station to station connection. Station “A” makes a Switch Hook Flash (SHF) and hears SPDT. Station “B” is held on the line. Station “A” dials the paging access code and hears CRBT. In about 1 sec., CRBT is no longer heard and Station “A” is able to page through the loudspeaker. The paging party For a Non-Delay System: Station “A” remains on hold. For a Delay System with Paging Transfer Supervision: Station “A” hangs up. The paged party answers Station “C” (the paged party) dials the paging access code (answer). LCA PGT AMP SP LCB LCC Paged Station Hold Station Paging Station A