    							NDA-24234 CHAPTER 3
    Page 91
    Revision 3.0
    INSTALLATION PROCEDURE
    5. INSTALLATION OF CPR
    This Section explains the procedure to install the CPR into the LPM. Perform the following ([1] through [5]) for
    both CPR0 and CPR1.
    1. Using the Phillips Screwdriver, remove the 4 + 8 screws. Then, detach the front panel and top cover from
    the CPR. (Refer to Figure 009-4.)
    Figure 009-4  Removal of Front Panel and Top Cover from CPR
    NAP-200-009
    Sheet 7/11
    Setting of Switch Positions and 
    Mounting of Circuit Cards
    AT T E N T I O NContents
    Static Sensitive
    Handling
    Precautions Required
    Top Cover
    CPRFront Panel
    As shown in the figure below, detach the front panel of the CPR by removing the 4 screws. Then, lift away 
    the top cover after removing the 8 screws. 
    						
    							CHAPTER 3 NDA-24234
    Page 92
    Revision 3.0
    INSTALLATION PROCEDURE
    2. Depending on the system configuration, insert the ISAGT (PZ-GT13/16) and LANI
    (PZ-PC19) cards into the following slots of the CPR (refer to Figure 009-5):
    ISAGT (PZ-GT13/16)
    →Slot #6 (ISA) (Fixed)
    LANI 
    →Slot #0 (PCI) (For Fusion Link)
    LANI 
    →Slot #1 (PCI) (When connecting MAT via 10-BASE T and PCI buses)
    LANI 
    →Slot #3 (PCI) (When LANI for Fusion Link is in dual configuration: avail-
    able for Release 3 or later software)
    Figure 009-5  Insertion of ISAGT and LANI Cards into CPR Slots
    NAP-200-009
    Sheet 8/11
    Setting of Switch Positions and 
    Mounting of Circuit Cards
    AT T E N T I O NContents
    Static Sensitive
    Handling
    Precautions Required
    CPRSlot 0 (PCI)
    LANIISAGT
    Slot 1 (PCI)Slot 3 (PCI)
    Slot 6 (ISA)
    This figure (example) shows how to insert the ISAGT and LANI cards into CPR Slots #6 (ISA), and #0, #1
    and #3 (PCI), respectively.
    Note:The LANI card for PCI Slot 3 is available for Release 3 or later software.  
    						
    							NDA-24234 CHAPTER 3
    Page 93
    Revision 3.0
    INSTALLATION PROCEDURE
    3. Attach the top cover and front panel again by fastening the removed screws. (Refer
    to Figure 009-6.)
    Figure 009-6  Reattachment of CPR Top Cover and Front Panel
    NAP-200-009
    Sheet 9/11
    Setting of Switch Positions and 
    Mounting of Circuit Cards
    AT T E N T I O NContents
    Static Sensitive
    Handling
    Precautions Required
    Top Cover
    CPRFront Panel
    After mounting the ISAGT/LANI cards, reattach the top cover by tightening the 8 screws.
    Then, also attach the Front Panel by fastening the 4 screws. 
    						
    							CHAPTER 3 NDA-24234
    Page 94
    Revision 3.0
    INSTALLATION PROCEDURE
    4. After turning “ON” the MBR key on the DSP of the CPR, insert the CPR into the
    LPM. Then, fasten the four screws. (Refer to Figure 009-7.)
    Figure 009-7  Accommodation of New CPR into LPM
    NAP-200-009
    Sheet 10/11
    Setting of Switch Positions and 
    Mounting of Circuit Cards
    AT T E N T I O NContents
    Static Sensitive
    Handling
    Precautions Required
    CPR LPM
    As shown in the figure below, insert the CPR into the LPM. Then, fasten the four screws.  
    						
    							NDA-24234 CHAPTER 3
    Page 95
    Revision 3.0
    INSTALLATION PROCEDURE
    5. Finally, insert the HFD into the CPR. Then, fasten the two screws. (Refer to Figure
    009-8.)
    Figure 009-8  Insertion of New HFD into CPR
    NAP-200-009
    Sheet 11/11
    Setting of Switch Positions and 
    Mounting of Circuit Cards
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    LPM
    HFD (PZ-IO27/28)
    By using the two screws, fasten the HFD onto the CPR. 
    						
    							CHAPTER 3 NDA-24234
    Pag e 96
    Revision 3.0
    INSTALLATION PROCEDURE
    This NAP explains how to run the following internal cables between Modules.
    NAP-200-010
    Sheet 1/71
    Internal Cable Connections
    START
    Confirm connector locations Referring to Figures 010-1 through 010-4, 
    confirm the locations of the connectors into 
    which the internal cables are inserted.
    Connection of FANU cables Referring to the figures listed in Figures 010-4 
    through 010-9, connect FANU cables.
    Connection of Internal Power Cables Referring to the figures shown in Figures 010-
    18 through 010-26, connect internal power 
    cables.
    Connection of Internal Bus Cables  Referring to figures shown in Figures 010-35 
    through 010-37, connect internal bus cables.
    END 
    						
    							NDA-24234 CHAPTER 3
    Page 97
    Revision 3.0
    INSTALLATION PROCEDURE
     
    Since Cable connections vary depending on the system configuration which includes how many Port Interface Mod-
    ules (PIMs) are accommodated in the system or whether redundancy is taken into account as to the CPU. Before
    starting cable connections, find your system in “Quick Reference Table.” When you find your system in the table,
    open the related pages, on which necessary information is provided, and then set about the cable connections.
    NAP-200-010
    Sheet 2/71
    Internal Cable Connections
    Table 010-1  Quick Reference Table (1/6)
    SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE
    Single IMG Configuration
    Power Cable IMG0010-5 ~ 
    010-12010-2 ~ 010-5
    Internal Cable IMG0010-22 ~ 
    010-29010-15 ~ 
    010-18
    Multiple IMG Configuration
    Power CableIMG0010-13 010-6
    IMG1010-14 010-7
    Internal CableIMG0010-30 010-19
    IMG1010-31 010-20
    Inter-Frame Bus Cable IMG0-IMG1011-1 011-1
    011-2 011-2
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    Power CableIMG0010-13 010-6
    IMG1010-15 010-8
    Internal CableIMG0010-30 010-19
    IMG1010-32 010-21
    Inter-Frame Bus Cable IMG0-IMG1011-1 011-1
    011-2 011-2
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    PIM0
    LPM IMG
    PIM2 PIM3
    PIM1
    TOPU
    FA N U
    BASEU
    PIM0PIM0
    LPM
    IMG0
    IMG1
    TSWM PIM2 PIM3
    PIM1
    TO P U
    BASEU FA N U TO P U
    BASEU
    5-PIM System
    PIM0PIM0
    LPM
    IMG0
    IMG1
    PIM2 PIM3
    TSWM
    PIM1PIM1
    BASEUTO P U
    FA N UTOPU
    BASEU6-PIM System 
    						
    							CHAPTER 3 NDA-24234
    Pag e 98
    Revision 3.0
    INSTALLATION PROCEDURE
    NAP-200-010
    Sheet 3/71
    Internal Cable Connections 
    Table 010-1  Quick Reference Table (2/6)
    SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE
    Power CableIMG0010-13 010-6
    IMG1010-16 010-9
    Internal CableIMG0010-30 010-19
    IMG1010-33 010-22
    Inter-Frame Bus Cable IMG0-IMG1011-1 011-1
    011-2 011-2
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    Inter-Frame Bus Cable IMG0-IMG1011-1 011-1
    011-2 011-2
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-18 010-11
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-3 011-3
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    PIM0PIM0
    LPM
    IMG0
    PIM2 PIM3
    TSWM PIM1
    PIM1 PIM2 IMG1
    TO P U
    BASEU FA N U
    BASEUTOPU
    7-PIM System
    PIM0PIM0
    LPM
    IMG0 IMG1
    PIM2 PIM3
    TSWM PIM1
    PIM1 PIM2 PIM3
    TO P U
    BASEUFA N UFA N U
    BASEU TO P U
    8-PIM System
    PIM0PIM0
    PIM0
    LPM
    IMG0IMG1
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1
    PIM1 PIM2 PIM3
    IMG2
    BASEUTOPU
    FA N U
    BASEU BASEUTO P U
    TOPU FA N U9-PIM System 
    						
    							NDA-24234 CHAPTER 3
    Page 99
    Revision 3.0
    INSTALLATION PROCEDURE
    NAP-200-010
    Sheet 4/71
    Internal Cable Connections 
    Table 010-1  Quick Reference Table (3/6)
    SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-19 010-12
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-35-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-4 011-4
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-20 010-13
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-36-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-5 011-5
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    PIM0PIM0
    PIM0
    LPM
    IMG0IMG1
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1
    PIM1
    PIM1 PIM2 PIM3
    IMG2
    10-PIM SystemBASEU TOPU
    FA N U
    FA N UTOPU TO P U
    BASEU
    BASEU
    PIM0PIM0
    PIM0
    LPM
    IMG0
    IMG1
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1
    PIM1
    PIM1 PIM2PIM2 PIM3IMG2
    11-PIM SystemBASEUTO P U
    FANU FANU FANU
    BASEU BASEUTOPU
    TOPU 
    						
    							CHAPTER 3 NDA-24234
    Pag e 10 0
    Revision 3.0
    INSTALLATION PROCEDURE
     
    NAP-200-010
    Sheet 5/71
    Internal Cable Connections 
    Table 010-1  Quick Reference Table (4/6)
    SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-21 010-14
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-37-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-6 011-6
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    Power CableIMG0010-13 010-6
    IMG1010-17 010-10
    IMG2010-21 010-14
    IMG3010-18 010-11
    Internal CableIMG0010-30 010-19
    IMG1010-34 010-23
    IMG2010-37-
    Inter-Frame Bus CableIMG0-IMG1011-1 011-1
    011-2 011-2
    IMG1-IMG2011-6 011-6
    IMG1-IMG3011-7 011-7
    Inter-Frame
    Alarm Bus CableIMG0-IMG1011-11 011-11
    IMG0-IMG2011-12 011-12
    IMG0-IMG3011-13 011-13
    PIM0PIM0
    PIM0
    LPM
    IMG0
    IMG1
    DUMMY
    PIM2 PIM3
    TSWMPIM1 PIM1
    PIM1 PIM2
    PIM2PIM3
    PIM3IMG2
    BASEUTO P U
    FA N UFA N U FA N U TO P U
    TO P U
    BASEU BASEU12-PIM System
    PIM0PIM0
    PIM0 PIM0
    LPM
    IMG0
    IMG1
    DUMMY
    PIM2 PIM3
    TSWM
    DUMMY
    PIM1 PIM1
    PIM1 PIM2
    PIM2PIM3
    PIM3
    IMG3 IMG2
    13-PIM System
    FA N U
    BASEUTOPU
    TOPUTOPU
    TOPU
    BASEU BASEU
    BASEU FA N UFA N U 
    						
    All NEC manuals Comments (0)