    							NDA-24234 CHAPTER 3
    Page 71
    Revision 3.0
    INSTALLATION PROCEDURE
    This NAP explains the procedures for installing the MDF.
    NAP-200-007
    Sheet 1/1
    Installation of the MDF
    START
    Install the MDF at the predetermined location on the floor or wall. Be sure to check the quantity of 
    accessory items such as arresters, block terminals, etc.
    Install the MDF, taking into consideration the locations of lead-in holes for Local Cable, C.O. lines, Tie 
    Lines, and Cable Running Routes.
    MDF Line Protector Ground must be separated from the Communication Ground connected to the 
    rectifier.
    END 
    						
    							CHAPTER 3 NDA-24234
    Page 72
    Revision 3.0
    INSTALLATION PROCEDURE
    This NAP explains the following work items.
    Connection of Power and Ground Cables
    Connection of DC-DC Converter for Telephone sets equipped with Message Waiting Lamps
    End Jointing of Power and Ground Cables
    Branching of Power Cables
    1. CONNECTION OF THE POWER AND GROUND CABLES
    CAUTION:
    Grounding circuit continuity is vital for safe operation of telecommunication equipment.
    Never operate telecommunication equipment with grounding conductor disconnected.
    NAP-200-008
    Sheet 1/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    Cable Running Run the power and ground cables per 
    Figure 008-1 and Figure 008-3.
    Running of power and ground cables to the 
    Power Receiving Terminals in the BASEUAn example of cable running on a free access or 
    computer floor is shown in Figure 008-1.
    Confirm that the Circuit Breaker (NFB) of the Rectifier is OFF.
    Connection of the power and ground cables Connect the power and ground cables to the 
    Power Receiving Terminals on the BASEU per 
    Figure 008-3.
    Connect the power and ground cables to the 
    output terminals of the Rectifier.
    Check  after  cable  connections Using a continuity tester, confirm that the -48 V 
    power cable is not shorting to the G power cable 
    or FE ground cable.
    START
    END 
    						
    							NDA-24234 CHAPTER 3
    Page 73
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 008-1  Detail of Cable Running
    NAP-200-008
    Sheet 2/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    P
    OWER
     A
    N
    D
     
    GR
    O
    U
    N
    D
     
    CABL
    ES
    POWER RECEIVING TERMINALPBX
    PIM
    REARLPM 
    						
    							CHAPTER 3 NDA-24234
    Page 74
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 008-2  Detail of Cable Running (Multiple IMG Configuration)
    NAP-200-008
    Sheet 3/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    REAR REAR
    REARLPM
    IMG3
    REARTSWM
    IMG2
    IMG1
    IMG0 POWER RECEIVING TERMINAL
    T
    -B
    R
    AN
    C
    H
     C
    ON
    N
    E
    C
    TI
    O
    N
    P
    OWE
    R
     A
    N
    D 
    G
    ROU
    N
    D 
    C
    AB
    L
    ES
    M
    AI
    N C
    AB
    L
    E
    DUMMY
    DUMMY 
    						
    							NDA-24234 CHAPTER 3
    Page 75
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 008-3  Connection of Power and Ground Cables to Power Receiving Terminal
    NAP-200-008
    Sheet 4/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    Note 1:For 1/2 PIM configuration, connect the cable only to the A terminal.
    Note 2:An example of End Jointing (using A Type-Clamp terminal) is explained in Section 3 of this NAP.
    +80V:Terminal
    -48V:B Terminal
    G:B Terminal
    -48V:A Terminal
    G:A Terminal
    FE Terminal
    POWER AND GROUND CABLES
    POWER RECEIVING TERMINAL
    REAR VIEWBASEU
    PIM0
    LPR
    Note 1 
    						
    							CHAPTER 3 NDA-24234
    Page 76
    Revision 3.0
    INSTALLATION PROCEDURE
    2. CONNECTION OF DC-DC CONVERTER FOR TELEPHONE SETS EQUIPPED WITH MESSAGE WAITING
    LAMPS
    NAP-200-008
    Sheet 5/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    START
    Cable Running Referring to Figure 008-4, run the power and 
    ground cables.
    Removal of shorting piece and cable 
    connectionReferring to Figure 008-5, remove the shorting 
    piece from the +80 V connector of PZ-M371 card, 
    and then connect the cable provided on the +80 V 
    Power Receiving Terminal Block to the +80 V 
    connector.
    Confirm that the Circuit Breaker (NFB) of the Rectifier is OFF.
    Connection of Power and Ground Cables Referring to Figures 008-4 and 008-5, connect the 
    power and ground cable to each terminal of the 
    equipment.
    Check after cable connections Using a continuity tester, confirm that the –48 V 
    and +80 V power cable are not short-circuiting with 
    the G power cable or FE ground cables.
    END 
    						
    							NDA-24234 CHAPTER 3
    Page 77
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 008-4  Example Connection Diagram-DC-DC Converter for Message Waiting Lamps
    NAP-200-008
    Sheet 6/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    Note:The current capacity of the DC-DC Converter is calculated by multiplying the (current capacity of
    the message waiting lamp) by the number of telephone sets.
    PBX
    IV(WHITE)+80V
    DC-DC 
    CONVERTER
    OUTPUT
    INPUT G +80V
    G –48V
    IV (R)
    IV (BL)
    IV (G) TO RECTIFIERF 
    G 
    						
    							CHAPTER 3 NDA-24234
    Page 78
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 008-5  Removal of Shorting Piece and Cable Connection
    NAP-200-008
    Sheet 7/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    BASEU Power Receiving Terminal Block
    Remove the shorting piece
    Connect the Cable to the +80V Connector of PZ-M371 cardPZ-M371
    +80V +80V
    Power Cable 
    						
    							NDA-24234 CHAPTER 3
    Page 79
    Revision 3.0
    INSTALLATION PROCEDURE
    3. END JOINTING OF POWER AND GROUND CABLES
    NAP-200-008
    Sheet 8/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    START
    Stripping  of  Insulation  Sheath Strip the wire to exceed the length of the terminal body 
    by 1 - 2 mm (1/8 inch).
    Clamping Referring to Figure 008-6, place the terminal body on 
    the die with the soldered part facing upward.
    Referring to Figure 008-7, insert the stripped wire into 
    the terminal body up to the insulation-sheath edge, and 
    clamp the terminal.
    Wipe the terminal with a dry cloth.
    END
    WIRE SHEATH
    CONDUCTOR
    CLAMP TERMINAL
    1/8 inch (1 - 2 mm) 
    						
    							CHAPTER 3 NDA-24234
    Page 80
    Revision 3.0
    INSTALLATION PROCEDURE
    Figure 008-6  Placing the Clamp Terminal on the Die
    Figure 008-7  Clamping Method
    NAP-200-008
    Sheet 9/13
    Connection of Power and Ground 
    Cables from the Power Equipment
    CONVEX DIE
    SOLDERED PART
    TERMINAL
    CONCAVE DIE
    1/8 inch (1 - 2mm)
    CONVEX DIE
    A
    A
    INSULATION SHEATH
    TERMINAL
    CONCAVE DIE
    SOLDERED PART
    CLAMPED PORTION
    CLAMPED PORTION
    CONDUCTOR
    A-A 
    						