NDA-24234 CHAPTER 3 Page 71 Revision 3.0 INSTALLATION PROCEDURE This NAP explains the procedures for installing the MDF. NAP-200-007 Sheet 1/1 Installation of the MDF START Install the MDF at the predetermined location on the floor or wall. Be sure to check the quantity of accessory items such as arresters, block terminals, etc. Install the MDF, taking into consideration the locations of lead-in holes for Local Cable, C.O. lines, Tie Lines, and Cable Running Routes. MDF Line Protector Ground must be separated from the Communication Ground connected to the rectifier. END
CHAPTER 3 NDA-24234 Page 72 Revision 3.0 INSTALLATION PROCEDURE This NAP explains the following work items. Connection of Power and Ground Cables Connection of DC-DC Converter for Telephone sets equipped with Message Waiting Lamps End Jointing of Power and Ground Cables Branching of Power Cables 1. CONNECTION OF THE POWER AND GROUND CABLES CAUTION: Grounding circuit continuity is vital for safe operation of telecommunication equipment. Never operate telecommunication equipment with grounding conductor disconnected. NAP-200-008 Sheet 1/13 Connection of Power and Ground Cables from the Power Equipment Cable Running Run the power and ground cables per Figure 008-1 and Figure 008-3. Running of power and ground cables to the Power Receiving Terminals in the BASEUAn example of cable running on a free access or computer floor is shown in Figure 008-1. Confirm that the Circuit Breaker (NFB) of the Rectifier is OFF. Connection of the power and ground cables Connect the power and ground cables to the Power Receiving Terminals on the BASEU per Figure 008-3. Connect the power and ground cables to the output terminals of the Rectifier. Check after cable connections Using a continuity tester, confirm that the -48 V power cable is not shorting to the G power cable or FE ground cable. START END
NDA-24234 CHAPTER 3 Page 73 Revision 3.0 INSTALLATION PROCEDURE Figure 008-1 Detail of Cable Running NAP-200-008 Sheet 2/13 Connection of Power and Ground Cables from the Power Equipment P OWER A N D GR O U N D CABL ES POWER RECEIVING TERMINALPBX PIM REARLPM
CHAPTER 3 NDA-24234 Page 74 Revision 3.0 INSTALLATION PROCEDURE Figure 008-2 Detail of Cable Running (Multiple IMG Configuration) NAP-200-008 Sheet 3/13 Connection of Power and Ground Cables from the Power Equipment REAR REAR REARLPM IMG3 REARTSWM IMG2 IMG1 IMG0 POWER RECEIVING TERMINAL T -B R AN C H C ON N E C TI O N P OWE R A N D G ROU N D C AB L ES M AI N C AB L E DUMMY DUMMY
NDA-24234 CHAPTER 3 Page 75 Revision 3.0 INSTALLATION PROCEDURE Figure 008-3 Connection of Power and Ground Cables to Power Receiving Terminal NAP-200-008 Sheet 4/13 Connection of Power and Ground Cables from the Power Equipment Note 1:For 1/2 PIM configuration, connect the cable only to the A terminal. Note 2:An example of End Jointing (using A Type-Clamp terminal) is explained in Section 3 of this NAP. +80V:Terminal -48V:B Terminal G:B Terminal -48V:A Terminal G:A Terminal FE Terminal POWER AND GROUND CABLES POWER RECEIVING TERMINAL REAR VIEWBASEU PIM0 LPR Note 1
CHAPTER 3 NDA-24234 Page 76 Revision 3.0 INSTALLATION PROCEDURE 2. CONNECTION OF DC-DC CONVERTER FOR TELEPHONE SETS EQUIPPED WITH MESSAGE WAITING LAMPS NAP-200-008 Sheet 5/13 Connection of Power and Ground Cables from the Power Equipment START Cable Running Referring to Figure 008-4, run the power and ground cables. Removal of shorting piece and cable connectionReferring to Figure 008-5, remove the shorting piece from the +80 V connector of PZ-M371 card, and then connect the cable provided on the +80 V Power Receiving Terminal Block to the +80 V connector. Confirm that the Circuit Breaker (NFB) of the Rectifier is OFF. Connection of Power and Ground Cables Referring to Figures 008-4 and 008-5, connect the power and ground cable to each terminal of the equipment. Check after cable connections Using a continuity tester, confirm that the –48 V and +80 V power cable are not short-circuiting with the G power cable or FE ground cables. END
NDA-24234 CHAPTER 3 Page 77 Revision 3.0 INSTALLATION PROCEDURE Figure 008-4 Example Connection Diagram-DC-DC Converter for Message Waiting Lamps NAP-200-008 Sheet 6/13 Connection of Power and Ground Cables from the Power Equipment Note:The current capacity of the DC-DC Converter is calculated by multiplying the (current capacity of the message waiting lamp) by the number of telephone sets. PBX IV(WHITE)+80V DC-DC CONVERTER OUTPUT INPUT G +80V G –48V IV (R) IV (BL) IV (G) TO RECTIFIERF G
CHAPTER 3 NDA-24234 Page 78 Revision 3.0 INSTALLATION PROCEDURE Figure 008-5 Removal of Shorting Piece and Cable Connection NAP-200-008 Sheet 7/13 Connection of Power and Ground Cables from the Power Equipment BASEU Power Receiving Terminal Block Remove the shorting piece Connect the Cable to the +80V Connector of PZ-M371 cardPZ-M371 +80V +80V Power Cable
NDA-24234 CHAPTER 3 Page 79 Revision 3.0 INSTALLATION PROCEDURE 3. END JOINTING OF POWER AND GROUND CABLES NAP-200-008 Sheet 8/13 Connection of Power and Ground Cables from the Power Equipment START Stripping of Insulation Sheath Strip the wire to exceed the length of the terminal body by 1 - 2 mm (1/8 inch). Clamping Referring to Figure 008-6, place the terminal body on the die with the soldered part facing upward. Referring to Figure 008-7, insert the stripped wire into the terminal body up to the insulation-sheath edge, and clamp the terminal. Wipe the terminal with a dry cloth. END WIRE SHEATH CONDUCTOR CLAMP TERMINAL 1/8 inch (1 - 2 mm)
CHAPTER 3 NDA-24234 Page 80 Revision 3.0 INSTALLATION PROCEDURE Figure 008-6 Placing the Clamp Terminal on the Die Figure 008-7 Clamping Method NAP-200-008 Sheet 9/13 Connection of Power and Ground Cables from the Power Equipment CONVEX DIE SOLDERED PART TERMINAL CONCAVE DIE 1/8 inch (1 - 2mm) CONVEX DIE A A INSULATION SHEATH TERMINAL CONCAVE DIE SOLDERED PART CLAMPED PORTION CLAMPED PORTION CONDUCTOR A-A