NDA-24306 CHAPTER 4 Page 273 Revision 1.0 CHAPTER 4 SYSTEM STARTUP 1. GENERAL This chapter describes the method to start up the system initially after completion of the installation of the PBX, and the method to check as to whether the system has started up normally. Before beginning the system startup, thoroughly read Section 2., “PRECAUTIONS BEFORE BEGINNING SYSTEM STARTUP” in this chapter, and observe the precautions while performing the system startup. Failure to so may delay the system cutover or may result in damage to the system equipment. 2. PRECAUTIONS BEFORE BEGINNING SYSTEM STARTUP 1. The system is to be started up using the basic system data. 2. When starting up the system, it is necessary to start up the MAT. 3. The following preparatory steps must be completed before the tests are begun: All circuit card switches should be correctly set. Flat cables should be securely connected. CHAMP connectors should be securely connected. All connector-ended cables should be secured at both ends. The –48 V (Blue) and G (Red) power supply leads must be correctly connected. An earth lead (less than 10 ohms) must be connected to the communication ground. The installer should confirm at this point that all installation steps have been completed. 4. Do not place any object (a tool, manual, etc.) on top of the Module Group or within a unit (module). An object such as a book, when placed on top of the Module Group, will adversely affect heat dissipa- tion from the Module Group. If an object placed on top of the Module Group or left within a unit (module) falls out, it may cause backplane pins, circuit cards, etc. to short-circuit. 5. Before initially turning ON power to the system, read the Power On Procedure (NAP-200-018). Until the normal operation of all circuit cards has been confirmed, leave power ON only during testing. 6. Observe the temperature in the switch room. Does the air-conditioning function properly at night? Does the temperature fluctuate constantly because people go in and out frequently, or rise above the rec- ommended level due to excessive heat being generated by any single piece of equipment? The fan should be left ON constantly until the installation tests are completed.
CHAPTER 4 NDA-24306 Page 274 Revision 1.0 SYSTEM STARTUP 7. A floppy disk (FD) copy of the programmed Office Data should be created. If a backup is not made, and the contents of the Data Memory are accidentally altered or destroyed, all the Office Data will have to be programmed again. 8. If any portion of the Office Data (especially data related to ringing patterns) has been changed via com- mands “ARTD/ARTDN,” “AKYD,” or “ASYD/ASYDL/ASYDN,” the system must be initialized and tests involving the changed data must be performed. 9. After the system is initialized, perform the following. Set the current date and time using MAT command “ATIM/ATIMN.” When the system is initialized, the system begins operating in Day Mode. To change over to Night Mode, press the NITE key on the Attendant Console. If no Attendant Console is equipped, the system begins operating in night mode. 10. The following cross connections must be made at the MDF: Complete necessary cross connections by extracting the related circuit cards from their mounting slots or by disconnecting the circuits with a cut plug if test springs are in use. If the connection to a D term is made incorrectly, the electronic fuse of the circuit card will blow out. (Repair Method: Correct the cross connections and flip the MB switch on the card Down-Up-Down). While a test is in progress, do not perform cross connections without first consulting with the person conducting the test (Ringing signal: AC 20 Hz, effective value 90 V, may be flowing through the termi- nals). Remove all temporary cross connections after the tests have been performed (If Office Data was as- signed for test purposes, restore the original Office Data). 11. Observe the following when connecting cables: Before connecting or disconnecting the control cable (Front & Backplane), turn OFF the power to the Module Group (LPM / PIM etc). Before connecting or disconnecting a CHAMP connector, turn OFF the power to the Module Group. This will prevent an accident from occurring in the event that a metal object such as a screw, screwdriver, etc. accidentally contacts the backplane circuitry or pins. When connecting or disconnecting the connector cable of the Attendant Console, first set the MB switch on the ATI circuit card to the UP position, then connect/disconnect the cable. 12. Precautions when Handling Circuit Cards When handling a circuit card, use a Field Service Kit to protect against static discharge (example: 3M No. 8012 Portable Field Service Kit; available from NEC). When touching a circuit card, be sure to wear the grounded wrist strap provided with the Portable Field Service Kit. Set the MB switch to the UP position and extract the circuit card from its mounting slot.
NDA-24306 CHAPTER 4 Page 275 Revision 1.0 SYSTEM STARTUP When holding a circuit card with bare hands, do not touch the component mounted side of the card or the connector portion. Wrist Strap Place the Circuit Card on a conductive sheet. Connect ground wire to the Earth terminal of the Module Group. (Component-Mounted Side) Connector (Contact) PortionFront Side Card Puller Tab
CHAPTER 4 NDA-24306 Page 276 Revision 1.0 SYSTEM STARTUP When placing a circuit card on a table or other flat surface, spread out a conductive sheet and set the card on the sheet. Set the MB switch of the circuit card to the UP position and confirm its mounting slot (Note). Then in- sert the card into its mounting slot. Note:Confirm that the color of the card puller tab is the same as the color of the label showing the Slot Number. 3. SYSTEM STARTUP PROCEDURE The NAPs indicated in the following flowchart describe the procedures for powering on, starting up the system, assigning Office Data, and checking the startup conditions. START Power ON:NAP-200-018 Program Install/Load:NAP-200-019 Office Data Assignment:NAP-200-020 Check of Lamp Indication and System Messages:NAP-200-021 Check of Alarm Lamps of the TOPU:NAP-200-022 END Circuit Card Perform work on the conductive sheet while wearing a grounded wrist strap.
NDA-24306 CHAPTER 4 Page 277 Revision 1.0 SYSTEM STARTUP NAP-200-018 Sheet 1/2 Powe r ON START Visual Inspection Check whether any pins are shorting on the backplane of each Module. Check whether any foreign matter such as a cleaning fluid residue is present on the connector portion of the circuit cards. On each circuit card equipped with ROM (CPU, etc.), check whether any pins of the ROM are bent or improperly seated. Leave all circuit cards inserted halfwayMount all circuit cards (including PWR Supplies) in the Module, leaving them inserted only halfway. (They should not be inserted into their connectors.) Check input voltage Check insulation across the -48 V and G terminals on the power receiving terminal of the Base Unit. Turn power to the rectifier ON and check the voltage (DC -48V ± 5V) and its polarity on the power receiving terminal of the Base Unit. Turn ON Fan Units Turn FAN UNIT ON. Verify that air is blown upwards. If the Fuse blows, the input polarity is reversed. Turn OFF the FAN UNIT. Correct polarity, replace the fuse and turn FAN UNIT ON. Verify that the FAN blows air upwards. Check PWR Supply Check the Power Supplies for each Module one at a time. Check Steps: 1. Turn circuit breaker OFF and insert the PWR Supply. 2. Turn circuit breaker ON (See Note). 3. Various lamps (Green) illuminate. 4. Observe the PWR Supply for a while and confirm that nothing abnormal (unusual smell, smoke, etc.) occurs. 5. Turn the circuit breaker ON/OFF a few times and observe the condition. 6. Turn the circuit breaker OFF and remove the PWR Supply. Note:If a Module is equipped with dual PWR Supplies, they must be turned ON/OFF simultaneously. ATTENTIONContents Static Sensitive Handling Precautions Required A
CHAPTER 4 NDA-24306 Page 278 Revision 1.0 SYSTEM STARTUP NAP-200-018 Sheet 2/2 Powe r ON Insert all PWR Supplies Insert all PWR Supplies into their positions. Insertion Steps: 1. Turn each Power Supply’s circuit breaker OFF and insert them one at a time. 2. Turn circuit breakers ON. 3. Confirm that there are no abnormal indications (unusual smell, smoke, alarm, etc.) Insert and check Line/Trunk circuit cardsInsert Line (16LC, etc.) and Trunk (16COT, etc.) circuit cards into their backplane connectors one at a time and confirm that no fuses are blown in the process. Check Steps: 1. Set MB switch UP and insert the card. 2. Set MB switch DOWN. 3. Confirm that there are no abnormal indications. 4. Set MB switch UP and remove the card. Insert and check control system cardsInsert control system circuit cards (TSW, MUX, etc.) one at a time and confirm that no fuses are blown in the process. Check Steps: 1. Set MB switch UP and insert the card. 2. Set MB switch DOWN. 3. Confirm that there are no abnormal indications. 4. Set MB switch UP and remove the card. Note:If a Module contains dual PWR Supplies, they must be turned ON or OFF simultaneously. For LNs: IMG3 → IMG2 → IMG1 → IMG0 IMG3: PIM0 → PIM1 → PIM2 → PIM3 IMG2: TSWM1 → PIM0 → PIM1 → PIM2 →PIM3 IMG1: TSWM0 → PIM0 → PIM1 → PIM2 → PIM3 IMG0: CPR0 → CPR1 → PIM0 → PIM1 → PIM2 → PIM3 For ISW: CPR0 → CPR1 → ISWM For LNs:IMG3 → IMG2 → IMG1 → IMG0 IMG3: PIM3 → PIM2 → PIM1 → PIM0 IMG2: PIM3 → PIM2 → PIM1 → PIM0 → TSWM1 IMG1: PIM3 → PIM2 → PIM1 → PIM0 → TSWM0 IMG0: PIM3 → PIM2 → PIM1 → PIM0 → CPR1 → CPR0 For ISW: ISWM → CPR1 → CPR0 END ATTENTIONContents Static Sensitive Handling Precautions Required A
NDA-24306 CHAPTER 4 Page 279 Revision 1.0 SYSTEM STARTUP Procedure for Program Install consists of the following items. Perform the procedures below for all the LNs and ISW, individually: Note:The control of 7-seg LED is the next page. (Case of program install and restart processing) NAP-200-019 Sheet 1/6 Program Install and Load ATTENTIONContents Static Sensitive Handling Precautions Required Generic Software 2~11 Internal MAT Software 1~2 TCP/IP Software 1 Install Application Software Install HD Initial Off-Line Star t Up Refer to (a) Procedure for Off-Line Start Up Refer to (b) Procedure for HD Initial HD format Generic Software (1) Install Making Directory in the HD Refer to (d) Procedure for Application Software Install START END Refer to (c) Procedure for Basic Software Install
CHAPTER 4 NDA-24306 Page 280 Revision 1.0 SYSTEM STARTUP Note: Procedures (a) through (e) must be performed in all LNs and ISW, individually. NAP-200-019 Sheet 2/6 Program Install and Load (a) Procedure for off-line start-up Status change of 7 Segment LED on the EMA card ATTENTIONContents Static Sensitive Handling Precautions Required START END Set the SENSE switch (CPU0, CPU1) to “c” on Push the CPURST button on the CPU Front Panel. or Turn Power-SW ON. Star tup end corresponding to the system to be initialized (OFF-LINE MODE) the CPU Front Panel.
NDA-24306 CHAPTER 4 Page 281 Revision 1.0 SYSTEM STARTUP Note: Procedures (a) through (e) must be performed in all LNs and ISW, individually. NAP-200-019 Sheet 3/6 Program Install and Load (b) Procedure for HD Initial Status change of 7 Segment LED on the CPU Front Panel. ATTENTIONContents Static Sensitive Handling Precautions Required START END HD Format Set the SENSE switch corresponding to the system to be initialized (CPU0, CPU1) to “1” on the CPU Front Panel. Insert the FD Generic Disk 1 into the FDD. Flip the MBR key on the CPU Front Panel [OFF → ON → OFF]. Display end 123 SENS SW 7SEG LED FUNCTION ‘1’FORMAT → COPY → MAKING DIRECTORY → →
CHAPTE R 4 NDA-2 4306 P ag e 282 R evis io n 1.0 S Y STEM S TA RTU P Note: Pro ced ures (a) t h rough ( e ) mu st b e p erf ormed in all LNs and I S W , i nd iv idua ll y . N AP-2 00-0 19 S hee t 4 /6 Pro gram In sta ll a nd Lo ad (c ) P roce dure f or Gene ric So ftw are (2 ~ 11) Inte rn al M AT S oftw are ( 1 ~ 2 ), T C P / IP S oftw are (1) I n sta ll S ta tus cha nge of 7 Segment LED on t h e CPU Front P an el. W ARNING: Rem oval or Ma ke Busy of th e HFD c ard is not allowed while the Floppy Disk or Hard Disk is being accessed. ATTENTIONContents Static Sensitive Handling Precautions Required START END * Repeat Insert the FD Generic Disk 2 into the FDD. * Set the SENSE switch to “3” on the CPU Front Panel. corresponding to the system to have DATA Flip the MBR key on the CPU Front Panel card OFF →ON→OFF. Generic Software 3 ~ 11 Internal MAT Software 1 ~ 2 TCP/IP Software 1 installed (CPU0, CPU1)