2012 Na Yamaha Super Tenere Manual
Have a look at the manual 2012 Na Yamaha Super Tenere Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
haha LUBRICATION SYSTEM CHART AND DIAGRAMS2-40 1. Oil pump assembly 2. Oil filter cartridge 3. Oil strainer cover 4. Oil strainer (oil pan) 5. Oil pan 6. Lower crankcase 7. Upper crankcase 8. Rear balancer shaft
haha COOLING SYSTEM DIAGRAMS 2-41 EAS20420 COOLING SYSTEM DIAGRAMS 4 2 5 1 4 2 3 8 7 6 3 4
haha COOLING SYSTEM DIAGRAMS 2-42 1. Radiator cap 2. Radiator inlet hose 3. Radiator outlet hose 4. Radiator 5. Thermostat 6. Radiator outlet pipe 7. Water pump inlet hose 8. Water pump
haha CABLE ROUTING 2-43 EAS20430 CABLE ROUTING Headlight assembly (front and rear view) A B C D E F G 1 2 1 2 2 2 22 3 4 56 6 7 8 9 6
haha CABLE ROUTING 2-44 1. Meter assembly lead 2. Front left turn signal light lead 3. Auxiliary DC jack 4. Front right turn signal light lead 5. Auxiliary DC jack lead 6. Headlight sub-wire harness 7. Meter assembly 8. Left auxiliary light socket 9. Right auxiliary light socket A. Route the meter lead through the hole in the windshield bracket. B. Position the plastic locking tie at the location shown in the illustration. C. Point the end of the plastic locking tie forward. D. Route the headlight sub-wire harness, auxiliary DC jack lead, front left turn signal light lead, front right turn signal light lead, and meter assembly lead though the hole in the headlight assembly bracket. E. Route the meter assembly lead to the rear of the headlight sub-wire harness. Make sure that the meter assembly lead crosses the headlight sub- wire harness between the holder and the right auxiliary light socket. F. Fit the headlight sub-wire harness in between the cap and the headlight assembly, making sure to push the headlight sub-wire harness all the way in. G. Point the open ends of the holder forward.
haha CABLE ROUTING 2-45 Handlebar (front view) AB C D EF GI H J KK K 1 12 5 5 345 7 1 1 1 1 5 5 5 5 6 6 6 7 8 9 F N6 6 L M 10
haha CABLE ROUTING 2-46 1. Right handlebar switch lead 2. Throttle cable (accelerator cable) 3. Throttle cable (decelerator cable) 4. Clutch hose 5. Left handlebar switch lead 6. Main switch lead 7. Horn lead 8. Front wheel sensor lead 9. Brake hose (hydraulic unit to left front brake caliper) 10. Brake hose (front brake master cylinder to hydraulic unit) A. Fasten the right handlebar switch lead to the handlebar with the plastic band at the location shown in the illustration. B. Fasten the left handlebar switch lead to the handlebar with the plastic band at the location shown in the illustration. C. Route the main switch lead to the front of the left handlebar switch lead. D. Connect the horn connectors, turn the handlebar completely to the right, and then fasten the horn lead to the brake hose holder at the white tape with a plastic locking tie. E. Route the horn lead over the brake hose (hydraulic unit to left front brake caliper) and front wheel sensor lead. F. Face the buckle of the plastic band forward with the end pointing downward. Do not cut off the excess end of the plastic band. G. Fasten the horn lead with a plastic locking tie so that the lead does not contact the horn. Be sure to fasten the plastic locking tie around the protective sleeve of the lead, not the lead itself. H. Position the plastic locking tie at the location shown in the illustration. I. Make sure that there is no slack in the leads in the area shown in the illustration. J. Point the end of the plastic band downward. Do not cut off the excess end of the plastic band. K. To electrical components tray L. Face the catch of the holder upward. M. Face the buckle of the plastic locking tie inward with the end pointing downward so that the end does not protrude to the outside of the frame. Do not cut off the excess end of the plastic locking tie. N. Fasten the right handlebar switch lead, left handlebar switch lead, and main switch lead at the white tape on each lead with a plastic locking tie. Point the end of the plastic locking tie downward. Do not cut off the excess end of the plastic locking tie.
haha CABLE ROUTING 2-47 Front brake hose (left side view) A B 1 1 1 24 3 3 3 34 4 4 9 7 2 2 2 6 8 8 9 10 10 11 4 7 7 4 67 I I J K E F G H L M N NN P YXXZ S 7 7 7 T U V W 12 12 AA AB 6 C 5 Q 4 D R O AC
haha CABLE ROUTING 2-48 1. Clutch hose 2. Throttle cable (decelerator cable) 3. Throttle cable (accelerator cable) 4. Front wheel sensor lead 5. Brake hose (left front brake caliper to right front brake caliper) 6. Brake hose (hydraulic unit to left front brake caliper) 7. Horn lead 8. Brake hose (front brake master cylinder to hydraulic unit) 9. Front wheel sensor coupler 10. Radiator fan motor coupler 11. Coolant reservoir hose 12. Radiator fan motor lead A. Route the front wheel sensor lead and horn lead to the inside of the brake hose (hydraulic unit to left front brake caliper). B. Fasten the front wheel sensor lead and horn lead to the pipe section of the brake hose (hydraulic unit to left front brake caliper) with a plastic locking tie at the location shown in the illustration. C. Fasten the front wheel sensor lead to the brake hose (hydraulic unit to left front brake caliper) with the holder, making sure that the lead is positioned to the rear of the hose. Align the holder with the line shown extending from the brake hose holder bolt in the illustration. D. Make sure that the protective sleeve of the front wheel sensor lead is positioned 0 –2 mm (0 –0.08 in) from the grommet on the lead. E. Route the throttle cable (decelerator cable) to the outside of the throttle cable (accelerator cable) between the guide on the upper bracket and the holder. Make sure that the throttle cables do not cross between the holder and the throttle body. F. Cross the throttle cables at the location shown in the illustration. Either throttle cable may be routed to the inside. G. Route the horn lead to the inside of the clutch hose and throttle cables. H. Make sure that the throttle cables do not cross between the guide and the throttle cable housing. I. Route the throttle cables to the outside of the leads. J. Route the horn lead to the inside of the throttle cables. K. Face the catch of the holder downward. L. Fasten the front wheel sensor lead, and horn lead at the white tape on each lead with the plastic band. Point the end of the plastic band inward. Do not cut off the excess end of the plastic band. M. Point the end of the plastic locking tie outward, and then cut off the excess end of the tie to 0 –2 mm (0 –0.08 in). N. Route the front wheel sensor lead, brake hose (hydraulic unit to left front brake caliper), and horn lead in the order shown in the illustration. O. Fasten the front wheel sensor lead and horn lead at the white tape on each lead to the brake hose (hydraulic unit to left front brake caliper) with the holder. Position the holder 0 –5 mm (0 –0.20 in) from the end of the hose protector on the brake hose. The catch of the holder may be facing in any direction. P. Route the brake hose (front brake master cylinder to hydraulic unit) through the guide. Q. Insert the projection on the radiator fan motor coupler into the hole in the frame. R. Route the front wheel sensor lead over the throttle cables. S. Fasten the front wheel sensor lead with the plastic band. Position the plastic band to the left of the radiator fan motor coupler. T. After assembling the headlight assembly, pass a plastic locking tie through the hole in the frame, and then fasten the radiator fan motor lead at the white tape with the tie. Point the end of the plastic locking tie forward. Do not cut off the excess end of the plastic locking tie. U. Route the radiator fan motor lead over the coolant reservoir hose. V. Route the radiator fan motor lead under the frame. W. U p w a r d X. Route the throttle cables between the brake hose (front brake master cylinder to hydraulic unit) and the clutch hose. Y. Route the front wheel sensor lead to the outside of the brake hose (front brake master cylinder to hydraulic unit), clutch hose, and throttle cables. Z. Route the radiator fan motor lead over the front wheel sensor lead. AA. Route the horn lead between the brake hose (front brake master cylinder to hydraulic unit) and the clutch hose, and to the inside of the throttle cables. AB. Forward AC. Face the buckle of the plastic band rearward with the end pointing downward. Do not cut off the excess end of the plastic locking tie.
haha CABLE ROUTING 2-49 Fuel tank and throttle bodies (left side view) AB C D E F G 1 2 3 3 5 3 4 6