Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-9 Upgrade to Release 8si 
    2
    Install TDM/LAN Bus Terminators
    1. Verity that the two AHF110 TDM/LAN bus terminators are installed per 
    Figure 2-1
    .
    Figure 2-1. Location of TDM/LAN Bus Terminators
    Swing Existing System into Maintenance Position
    1. While lifting on the left side of the existing cabinet, allow the left side to 
    swing outward and to the right.
    Check Health of SPE
    Ty p e  status system 1 and press En te r to check the health of the system.  Figure Notes:
    1. Rear of Control Cabinet
    2. TDM/LAN Bus Terminator in Slot 223. TDM/LAN Bus Terminator in Slot 02
    2221 00010203 04 05 06 07 08
    09 10 11 12 13 14 15 16 17 18 19 20
    23
    scdf01a CJL 081396 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-10 Upgrade to Release 8si 
    2
    Disable Scheduled Maintenance and Alarm 
    Origination to INADS
    1. Type change system-parameters maintenance and press En te r to prevent 
    scheduled daily maintenance from interfering with the update or upgrade.
    2. If scheduled maintenance has begun, set the Stop Time field to 1 minute 
    after the current time.
    or
    If scheduled maintenance has not begun, set the Start Time field to a 
    time after the upgrade is completed. For example, if you start the upgrade 
    at 8:00 p.m. and the upgrade takes 90 minutes, set the Start Time field 
    to 21:30.
    !CAUTION:
    If you do not disable Alarm Origination, the system may generate 
    alarms, resulting in unnecessary trouble tickets.
    3. Type neither in the Alarm Origination to OSS Numbers field and 
    press 
    En t e r .
    NOTE:
    For some software loads, set the Cleared Alarm Notification 
    and Restart Notification fields to disable before pressing 
    En t e r.
    Disable TTI
    NOTE:
    Do this step only if the Terminal Translation Initialization (TTI) is disabled and you want 
    it enabled.
    !CAUTION:
    If you do not disable the TTI, the translations can be corrupted.
    1. Type change system-parameters features and press 
    En te r. 
    2. On the second screen, set the TTI Enable? field to n to de-activate the 
    TTI feature.
    Check TTI Status 
    1. Type status tti and press En te r. Wait until the Percent Complete field 
    shows 100%. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-11 Upgrade to Release 8si 
    2
    Check Link Status
    This optional step is to make sure the settings are the same after the upgrade.
    1. Type display communication-interface links and press 
    En t e r. Write down 
    all enabled links.
    2. Type status link 
    number and press En t e r for each enabled link.
    3. Write down which links are in service. 
    Save Translations 
    1. Type save translation and press En t e r to write all translation information 
    from memory to the original translation flashcard, which takes about 10 
    minutes.
    When the save translations command is successful, the error code must be 
    a zero; otherwise, the translations are not copied. If the translations were 
    corrupted, the following error message displays when logging in:
    !WARNING:
    Translation corruption detected; call Lucent Technologies distributor 
    immediately.
    NOTE:
    The save translation command cannot function if the translation 
    corruption message appears. Refer to ‘‘Translation Corruption 
    Detected’’ on page B-5 to clear the problem.
    NOTE:
    This translation card may or not be used in the remainder of the upgrade procedure, 
    depending on the outcome of the Remove ISDN Interface Links step. This card is 
    referred to as the original translation card.
    Remove ISDN Interface Links
    NOTE:
    ISDN-PRI resides on the new TN794 (NetCon) circuit pack in R7si and later 
    releases. It is no longer on the processor interface circuit pack.
    The translations are the same as those in pre-R7 when a packet control 
    circuit pack was used and the System Parameters Customer Options 
    field had the PACCON field set to yes. That field was removed with the R7 or 
    later upgrade.
    1. Type display communication-interface 
    links and press En t e r. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-12 Upgrade to Release 8si 
    2
    2. Write down all BX.25 links. This information is used in the ‘‘Move Circuit 
    Packs from G3vs System to R8si’’ section. 
    3. Write down all ISDN links. If you found no ISDN links, go to ‘‘Save 
    Announcements (if necessary)’’.
    4. For each link where the Prot field is set to ISDN, record the information in 
    all fields (in case you need to back out of the upgrade). 
    5. For each ISDN link, type busyout link 
    link number and press En te r.
    6. Type change communication-interface links and press 
    En t e r.
    7. For each link where the Prot field is set to ISDN, set the Enable field to n 
    and press 
    En t e r.
    8. Type display communication-interface processor-channels and press 
    En t e r.
    9. For each processor channel where the Application field is set to ISDN, 
    record the information in all fields (in case you need to back out of the 
    upgrade). 
    10. Type change communication-interface processor-channels and press 
    En t e r.
    11. For each processor channel where the Application field is set to ISDN, 
    clear all fields and press 
    En t e r.
    12. Type change communication-interface links and press 
    En t e r.
    13. For 
    each PI extension where the Prot field is set to ISDN:
    a. Set the Est Conn field to n.
    b. Set the Prot field to bx25.
    c. Set the DTE/DCE field to dte.
    d. Leave the Identification field blank and press 
    En te r.
    14. For 
    each PI extension where the Prot field was set to ISDN:
    a. Type display data-module 
    PI Ext number and press En t e r.
    b. Record the information in each field (in case you need to back out of 
    the upgrade).
    c. Type remove data-module 
    PI Ext number and press En te r.
    15. Insert the new translation card, which is formatted for use with Release 5 
    or later.
    16. Type save translation and press 
    En t e r. Save this card for rebooting after 
    you install the new hardware.
    NOTE:
    In this case, the original translation card is not be used for the 
    remainder of the upgrade procedure. The original translation card is 
    used only if you need to back out of the upgrade. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-13 Upgrade to Release 8si 
    2
    Save Announcements (if necessary)
    NOTE:
    The TN750C Announcement circuit pack stores announcements in 
    nonvolatile memory; saving the announcements is optional.
    1. If the PPN contains a TN750/B Announcement circuit pack, type display 
    announcements and press 
    En t e r.
    2. If administered recorded announcements are listed, type save 
    announcements 
    cabinet carrier slot and press En te r. For example, 
    01
    D03. This takes about 30 minutes.
    NOTE:
    For some software loads, type save announcements from cabinet 
    carrier slot
    . Type help and press En t e r for a list of correct commands.
    Verify Software Version
    If standard reliability:
    1. Type list configuration software-version and press 
    En t e r. Under the 
    UPDATE FILE column, note whether any patches have been applied.
    NOTE:
    If you restore the system to the old software, you must download 
    these patches onto the system.
    If high or critical reliability:
    1. Type list configuration software-version long and press 
    En t e r.
    Shut Down DEFINITY LAN Gateway System
    !WA R N I N G :
    Neglecting to shut down the LAN Gateway assembly before powering down the system 
    cabinet where it resides can damage the LAN Gateway disk.
    1. Log onto the DEFINITY LAN Gateway.
    2. On the main menu, select Maintenance > Reset System > Shutdown. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-14 Upgrade to Release 8si 
    2
    Shut Down DEFINITY AUDIX System
    !WA R N I N G :
    Neglecting to shut down the AUDIX assembly before powering down the system 
    cabinet where it resides can damage the AUDIX disk.
    1. Shut down the AUDIX assembly and allow the disk to completely spin 
    down. Refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 1-26
    .
    Power Down Existing System
    !CAUTION:
    Powering down the control cabinet causes important system data, such as BCMS data, 
    records of queued ACD calls, Automatic Wakeup request, and Do Not Disturb requests, 
    to be lost. 
    1. Behind the G3vs cabinet, set the circuit breaker to OFF. See Figure 2-2
    . 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-15 Upgrade to Release 8si 
    2
    Figure 2-2. Rear of G3vs System Cabinet
    Remove Ground Connections
    1. Remove the 6 AWG (#40) (16 mm2) ground wire from the ground block on 
    the rear of the G3vs system. This wire later attaches to the new control 
    cabinet.
    2. Remove the 10 AWG (#25) (6 mm
    2) Coupled Bonding Conductor (CBC) 
    wire from the ground block on the rear of the G3vs system. This wire later 
    attaches to the new control cabinet. Figure Notes
    1. 10 AWG (#25) (6 mm
    2) Wire to 
    Coupled Bonding Conductor (CBC)
    2. Backplane Connectors 1-4
    3. Backplane Connectors 5-10
    4. TERM Connector5. 6 AWG (#40) (16 mm2) Wire to 
    Approved Ground
    6. AC Power Receptacle
    7. Ground Block
    8. Circuit Breaker
    10
    94
    83
    72
    61
    5AUX
    PI DCE TERM
    120/240 V
    60/50~
    6/3A
    3
    2
    scdf CJL 102596 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-16 Upgrade to Release 8si 
    2
    Move 25-Pair Cables from G3vs System to R8si 
    1. Remove any reusable 25-pair cables from the rear of the G3vs system. 
    NOTE:
    The distance from the wall-mount G3vs system and the Release 8si 
    system may require that all cables be replaced with longer cables.
    2. Attach any reusable 25-pair cables to the required connectors on the rear 
    of the Release 8si system.
    3. Attach any 
    new 25-pair cables to the required connectors on the rear of the 
    Release 8si system. Route the new cables to the MDF and attach.
    Move Management Terminal Cable from G3vs 
    System to R8si
    1. Remove the management terminal cable from the rear of the G3vs system.
    2. Attach the management terminal cable to the rear of the Release 8si 
    system.
    Move Circuit Packs from G3vs System to R8si
    1. Label each port circuit pack in the G3vs system with its slot number.
    2. Remove all circuit packs from the G3vs system. Store the circuit packs in 
    the static-proof packaging. 
    3. Remove and retain all circuit pack blanks.
    4. Install the power unit and the remaining control circuit packs into the new 
    control cabinet. See Table 2-4
    . 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-17 Upgrade to Release 8si 
    2
    NOTE:
    A TN2182 Tone-Cloc k c an rep lac e the TN756 Tone-Detec tor/ 
    Generator. If a TN2182 is used , a TN748B Tone-Detec tor is not 
    req uired .
    5. Install the port circuit packs into the control cabinet. Since the new control 
    cabinet has more port slots than the G3vs cabinet, there should not be a 
    need to retranslate these circuit packs.
    6. Install blank faceplates in any vacated slots.
    7. Check the load number on the TN790B Processor label. Insert the 
    appropriate flashcard into the TN794 Network Control/Packet Interface 
    based on the following parameters:
    nIf the load number is the Release 8 load number, insert the new or 
    original translation card as directed in the Save Translation step and 
    Remove ISDN Interface Links step.
    nIf the load number is not the Release 8 load number, insert the 
    orange-labeled software memory card.
    Table 2-4. Circuit Packs for R8si
    Circuit Pack Name New or Used
    TN790B Processor New
    TN794 Network Control/Packet 
    InterfaceNew
    TN765 Processor Interface 
    1
    1. Only if BX.25 was administered.
    Reuse the circuit pack from G3vs 
    system
    TN780 Tone-Clock/Generator Reuse the circuit pack from G3vs 
    system
    Other port circuit 
    packsVarious Reuse the circuit packs from G3vs 
    system 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading R5vs/R6vs to R8si 
    2-18 Upgrade to Release 8si 
    2
    Connect Control Cabinet Power and Ground
    1. Connect a 6 AWG (#40) (16 mm2) wire (previously used on the G3vs 
    cabinet) from the single-point ground block on the control cabinet to the 
    approved ground. See Figure 2-3
    . 
    Figure 2-3. Typical AC Power and Ground Layout 
    2. Connect a 10 AWG (#25) (6 mm
    2) wire (previously used on the G3vs 
    cabinet) between the cabinet single-point ground block and the CBC.
    3. Connect the supplied cabinet AC power cord to the AC receptacle on the 
    rear of the control cabinet. Plug the opposite end of the cord into the 
    dedicated electrical outlet. Figure Notes
    1.  Control Cabinet 
    2. Circuit Breaker
    3. AC Power Receptacle
    4. Single-Point Ground Block
    5. 8-ft (2.5-m) Power Cord6. NEMA 5-15 or 5-20 Receptacle or 
    Equivalent
    7. 6 AWG (16 mm
    2) Cabinet Ground 
    Wire to Approved Ground
    8. 10 AWG (6 mm
    2) Wire to CBC
    3
    4
    5
    1
    8
    2
    7
    On
    OffOn
    Off
    6r781851bCJL030896 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual