Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-7 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    LASER Product
    CLASS 1 LASER PRODUCT
    IEC 825 1993
    The DEFINITY ECS may contain a Class 1 LASER device if single-mode fiber 
    optic cable is connected to a remote Expansion Port Network (EPN). The LASER 
    device operates within the following parameters:
    nMaximum Power Output: -5dBm
    nWavelength: 1310 nm
    nMode Field Diameter: 8.8 µm
    !CAUTION:
    Use of controls or adjustments or performance of procedures other than 
    those specified herein may result in hazardous radiation exposure.
    Contact your Lucent Technologies representative for more information.
    Table 6-2. List of Parts Comcodes
    Quantity Description Comcode
    1 Pass-thru Tool  847978715
    1 Beige SC-SC Fiber Optic Adapter (multimode) 107118903
    1 Beige ST-SC Fiber Optic Adapter (multimode) 107087967
    1 Ten-foot (3 m) Fiber Optic Cable (single-mode) 107122640
    1 I/O Connector Adapter Plate 847978673
    1 Fiber Optic Cable Disconnect Label  848029286
    10 Cable Ties  407814672
    6 Cable Tie Mounts  403053150 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-8 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    Cabinet Preparation
    1. Remove the 2 perforated metal panels from the rear of the cabinet. See 
    Figure 6-2
    .
    Figure 6-2. Remove the Rear Panels
    2. Remove the front door.
    NOTE:
    Administration may be required before removing the circuit pack in 
    the following step.
    3. Determine which slot (1 or 2) will contain the new fiber optic circuit pack. 
    Remove the circuit pack or the blanking plate from this slot. 
    NOTE:
    If a circuit pack is removed from the required slot, it must be installed 
    into a different slot in the cabinet. All translations associated with this 
    circuit pack must also be moved.
    fodapnla LJK 041398 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-9 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    4. Remove the circuit pack or the blanking plate from the slot next to the slot 
    determined in step 3. Two consecutive open slots are required to install the 
    fiber optic adapter.
    NOTE:
    If a circuit pack was removed in step 4, it will be replaced into the 
    same slot, later in this section.
    5. From the rear, remove the I/O cable connector plate associated with the 
    slot that will contain the new fiber optic circuit pack.
    6. Using a supplied cable tie, secure the removed I/O connector plate to the 
    back of the cabinet or to nearby cabling. This will keep it from moving 
    loosely inside the cabinet.
    7. From the rear, remove the I/O cable connector associated with the slot that 
    will contain the new fiber optic circuit pack. See Figure 6-3
    .
    Figure 6-3. Remove the I/O Cable Connector
    fodacon LJK 041398 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-10 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    8. Using a supplied cable tie, secure the removed I/O connector to nearby 
    cabling. See Figure 6-4
    .
    Figure 6-4. Secure the I/O Cable Connector
    fodatie LJK 041398 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-11 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    Install the Pass-thru Kit
    Figure 6-5. Fiber Optic Adapter and Pass-Thru Tool
    1. Snap the beige SC-SC fiber optic adapter onto the pass-thru tool. See 
    Figure 6-5
    . Use the beige adapter even if single-mode fiber is being 
    installed. The beige adapter is better suited for cable routing in the next 
    steps.
    NOTE:
    If single-mode fiber is being installed, the beige adapter will be 
    replaced with a blue adapter, later in this section. Figure Notes
    1. Pass-thru Tool 2. Beige SC-SC Fiber Optic Adapter
    dafocoup RPY 062497
    1
    2 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-12 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    Figure 6-6. Insert the Pass-thru Tool 
    1. From the front of the cabinet, insert the pass-thru tool into the opening 
    between the bottom of the circuit packs and the circuit pack label. See 
    Figure 6-6
    .
    2. Slide the tool to the rear of the cabinet.
    !CAUTION:
    Avoid bending fiber optic cables to a radius smaller than 1.5 inches (3.8 cm), 
    to prevent mechanical stress on the cables. 
    !CAUTION:
    During the actual installation of fiber optic components, use either all beige 
    or all blue adapters. Beige denotes multimode fiber and blue denotes 
    single-mode fiber. Do not mix beige with blue.
    3. Attach the supplied fiber optic cable to the adapter. 
    fodainst LJK 041398 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-13 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    4. Pull the tool (with adapter and cable attached) out through the front of the 
    cabinet. See Figure 6-7
    .
    Figure 6-7. Fiber Optic Cable and Adapter
    5. Install the new circuit pack.
    6. Connect the fiber cable to the angled connector on the front of the new 
    circuit pack. See Figure 6-8
    .
    fodacbl2 LJK 041398 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-14 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    Figure 6-8. Connect Fiber Cable to Circuit Pack
    7. Route the fiber optic cable through the opening vacated by the I/O cable 
    connector plate.
    8. If necessary, remove the beige fiber adapter from the tool and plug the fiber 
    optic cable into the SC-SC (single-mode) or SC-ST (multimode) adapter. 
    See Figure 6-9
    .
    scdafo_4 KLC 051298
    C12 456789101112131415161718TONE -
    CL O CKPOWER UNIT EXPN
    INTFC3EX PN
    INTFC 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-15 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    Figure 6-9. Bracket Attachments
    9. From the front of the I/O connector adapter bracket (with fiber cable), snap 
    the adapter into the supplied I/O connector adapter bracket. 
    10. Snap the I/O connector adapter bracket into the I/O connector opening.
    11. Attach the outside fiber plant to the I/O connector on the rear of the 
    cabinet. 
    12. Wrap the cable disconnect label around the fiber optic cable. See 
    Figure 6-10
    . Figure Notes:
    1. Fiber cable
    2. I/O connector adapter bracket3. SC-SC adapter
    4. SC-ST adapter
    scdafo_2 KLC 042098
    12
    3
    4 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Adding or Removing Hardware 
    6-16 Installing Fiber Optic Cable Pass-Thru Kit (SCC) 
    6
    Figure 6-10. Cable Disconnect Label
    !CAUTION:
    Avoid bending fiber optic cables to a radius smaller than 1.5 inches 
    (3.8 cm), to prevent mechanical stress on the cables. Plan the use of 
    cable ties to avoid crimping the cable or creating a fixed stress point 
    where, at a later time, movement of the cable causes it to exceed the 
    minimum bend radius.
    13. If a circuit pack was removed to access 2 open slots (from ‘‘Cabinet 
    Preparation’’ on page 6-8), replace the circuit pack into its original slot.
    14. Replace the 2 perforated metal panels onto the rear of the cabinet. See 
    Figure 6-11
    .
    prda0001 RPY 020998 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual