Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-5 Read This First 
    1
    Table 1-2. Carriers that use the TN794 NetCon circuit pack
    DEFINITY R7.1 or later 
    Carrier/Backplane Equipment Notes
    SCC Processor Cabinet J58890L-2 List 25 This replaces List 10 
    SCC Processor Cabinet 
    (Survivable Remote)J58890L-2 List 31 This replaces List 30 
    SCC Processor Cabinet (Knock 
    Down)J58890L-2 List 52 This replaces List 51 
    Backplane for the J58890L-2 
    List 25, List 31, and List 52 
    CabinetsPWJ58890AL-1 List 3 This backplane replaces List 2
    SCC Duplication Processor 
    CabinetJ58890M-2 List 15 This replaces List 7 
    SCC Duplication Processor 
    Cabinet (Knock Down)J58890M-2 List 52 This replaces List 51 
    Backplane for the J58890M-2 
    List 15 and List 52 CabinetsPWJ58890AM-1 List 3 This backplane replaces List 2
    MCC SI Processor Carrier J58890AH-2 List 13 This replaces List 10 
    MCC SI Processor Carrier 
    (Knock Down)J58890AH-2 List 55 This replaces List 54 
    Backplane for the J58890AH-2 
    List 13 and List 55 CabinetsPWJ58906AA-1 List 4  This backplane replaces List 3
    MCC SI Duplication Processor 
    CarrierJ58890AJ-2 List 12 This replaces List 9 
    MCC SI Duplication Processor 
    Carrier (Knock Down)J58890AJ-2 List 55 This replaces List 54 
    Material required in addition to 
    L55 (Knock Down)J58890AJ-2 List 56 This replaces List 53 
    Backplane for the J58890AJ-2 
    List 12 and List 55 CabinetsPWJ58906AB-1 List 3 This backplane replaces List 2
    Fiber Optic Cable: MCC Dup-Int 848204434 14-in. cable
    Fiber Optic Cable: SCC Dup-Int LL2SC-SC-10
    10712264010-ft cable 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-6 Task Table 
    1
    Ta s k  Ta b l e
    Table 1-3 lists the high-level tasks to perform the upgrades. Refer to the 
    appropriate page for instructions for each step.
    Table 1-3. Tasks to Upgrade to Release 8si
    áTask Description Page
    Unpack and Inspect Control Cabinet1-7
    Install Control Cabinet1-8
    Add Earthquake Protection1-8
    Label Existing Cables1-8
    Install TDM/LAN Bus Terminators1-8
    Swing Existing System into Maintenance Position1-8
    Check SPE1-9
    Disable Scheduled Maintenance and Alarm Origination to INADS1-9
    Disable TTI1-10
    Check TTI Status1-10
    Check Link Status1-10
    Save Translations1-11
    Remove ISDN Interface Links 1-11
    Save Announcements (if necessary)1-12
    Verify Software Version1-13
    Shut Down DEFINITY LAN Gateway System1-13
    Shut Down DEFINITY AUDIX System1-13
    Power Down Existing System1-14
    Remove Ground Connections1-15
    Move 25-Pair Cables from G3vs System to R8si 1-15
    Move Management Terminal Cable from G3vs System to R8si1-15
    Move Circuit Packs from G3vs System to R8si 1-15
    Connect Control Cabinet Power and Ground1-17
    Power Up the System1-18
    Administer the System1-18
    Enable TTI1-21
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-7 Upgrade to Release 8si 
    1
    Upgrade to Release 8si
    Unpack and Inspect Control Cabinet 
    1. Unpack the J58890L-1 L5 Single-Carrier Control Cabinet and verify  
    comcode vintage of the control carrier.
    !CAUTION:
    Take care to avoid injury while cutting and removing bands.
    NOTE:
    Verify the vintage of the control carrier and check it against Table 1-2. 
    If your carrier is NOT listed, you need a TN794/TN2400 circuit pack.
    2. Inspect cabinet for any shipping damage. Report any damage per local 
    procedures.
    3. Remove all of the packing material from the cabinet. Check Link Status
    1-22
    Enable Scheduled Maintenance1-22
    Enable Customer Options and Alarm Origination to INADS1-22
    Save Translations1-23
    Restore Announcements (if necessary)1-23
    Power Up DEFINITY LAN Gateway System1-23
    Power Up DEFINITY AUDIX System1-26
    Display Memory-Configuration1-24
    Disassemble the G3vs System1-24
    Return Replaced Equipment1-25
    Table 1-3. Tasks to Upgrade to Release 8si
    áTask Description Page
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-8 Upgrade to Release 8si 
    1
    Install Control Cabinet
    1. Position the control cabinet at the desired location (as close to the Main 
    Distribution Frame [MDF] as possible).
    !CAUTION:
    The cabinet may weigh as much as 130 pounds (58 kg). Use lifting 
    precautions to avoid injury.
    2. If earthquake protection is not required, install hole plugs (provided with 
    cabinet) in the holes previously occupied by the 2 carriage bolts at the 
    bottom rear of the cabinet.
    Add Earthquake Protection
    1. If earthquake protection is required, refer to Chapter 6, ‘‘Adding or 
    Removing Hardware’’.
    Label Existing Cables
    1. To make reconnecting the cables simpler and more reliable, label every 
    reusable connector cable in the system.
    NOTE:
    The cables connecting to the existing system are probably too short. 
    Replace these cables with new, longer cables (if necessary).
    2. Install new connector cables, as necessary, onto the connectors on the 
    rear of the cabinet.
    3. Route the cables to the MDF and cross-connect as necessary.
    Install TDM/LAN Bus Terminators
    1. Verity that the two AHF110 TDM/LAN bus terminators are installed per 
    Figure 1-1
    . 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-9 Upgrade to Release 8si 
    1
    Figure 1-1. Location of TDM/LAN Bus Terminators
    Swing Existing System into Maintenance Position
    1. While lifting on the left side of the existing cabinet, allow the left side to 
    swing outward and to the right.
    Check SPE
    Ty p e  status system 1 and press En te r to check the health of the system. 
    Disable Scheduled Maintenance and Alarm 
    Origination to INADS
    1. Type change system-parameters maintenance and press En te r to prevent 
    scheduled daily maintenance from interfering with the update or upgrade.
    2. If scheduled maintenance has begun, set the Stop Time field to 1 minute 
    after the current time.
    or Figure Notes:
    1. Rear of Control Cabinet
    2. TDM/LAN Bus Terminator in Slot 223. TDM/LAN Bus Terminator in Slot 02
    2221 00010203 04 05 06 07 08
    09 10 11 12 13 14 15 16 17 18 19 20 23
    scdf01a CJL 081396 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-10 Upgrade to Release 8si 
    1
    If scheduled maintenance has not begun, set the Start Time field to a 
    time after the upgrade is completed. For example, if you start the upgrade 
    at 8:00 p.m. and the upgrade takes 90 minutes, set the Start Time field 
    to 21:30.
    !CAUTION:
    If you do not disable Alarm Origination, the system may generate 
    alarms, resulting in unnecessary trouble tickets.
    3. Type neither in the Alarm Origination to OSS Numbers field and 
    press 
    En t e r .
    NOTE:
    For some software loads, set the Cleared Alarm Notification 
    and Restart Notification fields to disable before pressing 
    En t e r.
    Disable TTI
    NOTE:
    Do this step only if the Terminal Translation Initialization (TTI) is enabled.
    !CAUTION:
    If you do not disable the TTI, the translations can be corrupted.
    1. Type change system-parameters features and press En te r. 
    2. On the second screen, set the TTI Enable? field to n to de-activate the 
    TTI feature.
    Check TTI Status 
    1. Type status tti and press En te r. Wait until the Percent Complete field 
    shows 100%.
    Check Link Status
    This optional step is to make sure the settings are the same after the upgrade.
    1. Type display communication-interface links and press 
    En t e r. Write down 
    all enabled links.
    2. Type status link 
    number and press En t e r for each enabled link.
    3. Write down which links are in service.  
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-11 Upgrade to Release 8si 
    1
    Save Translations 
    1. Type save translation and press En t e r to write all translation information 
    from memory to the original translation flashcard, which takes about 10 
    minutes.
    When the save translations command is successful, the error code must be 
    a zero; otherwise, the translations are not copied. If the translations were 
    corrupted, the following error message displays when logging in:
    !WARNING:
    Translation corruption detected; call Lucent Technologies distributor 
    immediately.
    NOTE:
    The save translation command cannot function if the translation 
    corruption message appears. Refer to ‘‘Translation Corruption 
    Detected’’ on page B-5 to clear the problem.
    NOTE:
    This translation card may or not be used in the remainder of the upgrade 
    procedure, depending on the outcome of the Remove ISDN Interface Links 
    step. This card is referred to as the original translation card.
    Remove ISDN Interface Links
    NOTE:
    ISDN-PRI resides on the new TN794 (NetCon) circuit pack in R7si and later 
    releases. It is no longer on the processor interface circuit pack.
    The translations are the same as those in pre-R7 when a packet control 
    circuit pack was used and the System Parameters Customer Options 
    field had the PACCON field set to yes. That field was removed with the R7 or 
    later upgrade.
    1. Type display communication-interface 
    links and press En t e r.
    2. Write down all BX.25 links. This information is used in the ‘‘Move Circuit 
    Packs from G3vs System to R8si’’ section. 
    3. Write down all ISDN links. If you found no ISDN links, go to ‘‘Save 
    Announcements (if necessary)’’.
    4. For each link where the Prot field is set to ISDN, record the information in 
    all fields (in case you need to back out of the upgrade). 
    5. For each ISDN link, type busyout link 
    link number and press En te r.
    6. Type change communication-interface links and press 
    En t e r. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-12 Upgrade to Release 8si 
    1
    7. For each link where the Prot field is set to ISDN, set the Enable field to n 
    and press 
    En t e r.
    8. Type display communication-interface processor-channels and press 
    En t e r.
    9. For each processor channel where the Application field is set to ISDN, 
    record the information in all fields (in case you need to back out of the 
    upgrade). 
    10. Type change communication-interface processor-channels and press 
    En t e r.
    11. For each processor channel where the Application field is set to ISDN, 
    clear all fields and press 
    En t e r.
    12. Type change communication-interface links and press 
    En t e r.
    13. For 
    each PI extension where the Prot field is set to ISDN:
    a. Set the Est Conn field to n.
    b. Set the Prot field to bx25.
    c. Set the DTE/DCE field to dte.
    d. Leave the Identification field blank and press 
    En te r.
    14. For 
    each PI extension where the Prot field was set to ISDN:
    a. Type display data-module 
    PI Ext number and press En t e r.
    b. Record the information in each field (in case you need to back out of 
    the upgrade).
    c. Type remove data-module 
    PI Ext number and press En te r.
    15. Insert the new translation card, which is formatted for use with Release 5 
    or later.
    16. Type save translation and press 
    En t e r. Save this card for rebooting after 
    you install the new hardware.
    NOTE:
    In this case, the original translation card is not be used for the 
    remainder of the upgrade procedure. The original translation card is 
    used only if you need to back out of the upgrade.
    Save Announcements (if necessary)
    NOTE:
    The TN750C Announcement circuit pack stores announcements in nonvolatile 
    memory; saving the announcements is optional.
    1. If the PPN contains a TN750/B Announcement circuit pack, type display 
    announcements and press 
    En t e r. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-13 Upgrade to Release 8si 
    1
    2. If administered recorded announcements are listed, type save 
    announcements 
    cabinet carrier slot and press En te r. For example, 
    01
    D03. This takes about 30 minutes.
    NOTE:
    For some software loads, type save announcements from cabinet 
    carrier slot
    . Type help and press En t e r for complete command 
    syntax.
    Verify Software Version
    If standard reliability:
    1. Type list configuration software-version and press 
    En t e r. Under the 
    UPDATE FILE column, note whether any patches have been applied.
    NOTE:
    If you restore the system to the old software, you must download 
    these patches onto the system.
    If high or critical reliability:
    1. Type list configuration software-version long and press 
    En t e r.
    Shut Down DEFINITY LAN Gateway System
    !WA R N I N G :
    Neglecting to shut down the LAN Gateway assembly before powering down the system 
    cabinet where it resides can damage the LAN Gateway disk.
    1. Log onto the DEFINITY LAN Gateway.
    2. On the main menu, select Maintenance > Reset System > Shutdown.
    Shut Down DEFINITY AUDIX System
    !WA R N I N G :
    Neglecting to shut down the AUDIX assembly before powering down the system 
    cabinet where it resides can damage the AUDIX disk.
    1. Shut down the AUDIX assembly and allow the disk to completely spin 
    down. Refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 1-26
    . 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-14 Upgrade to Release 8si 
    1
    Power Down Existing System
    !CAUTION:
    Powering down the control cabinet causes important system data, such as BCMS data, 
    records of queued ACD calls, Automatic Wakeup request, and Do Not Disturb requests, 
    to be lost. 
    1. Behind the G3vs cabinet, set the circuit breaker to OFF. See Figure 1-2
    .
    Figure 1-2. Rear of G3vs System Cabinet Figure Notes
    1. 10 AWG (#25) (6 mm
    2) Wire to 
    Coupled Bonding Conductor (CBC)
    2. Backplane Connectors 1-4
    3. Backplane Connectors 5-10
    4. TERM Connector5. 6 AWG (#40) (16 mm2) Wire to 
    Approved Ground
    6. AC Power Receptacle
    7. Ground Block
    8. Circuit Breaker
    10
    94
    83
    72
    61
    5AUX
    PI DCE TERM
    120/240 V
    60/50~
    6/3A
    3
    2
    scdf CJL 102596 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual