Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-15 Upgrade to Release 8si 1 Remove Ground Connections 1. Remove the 6 AWG (#40) (16 mm2) ground wire from the ground block on the rear of the G3vs system. This wire later attaches to the new control cabinet. 2. Remove the 10 AWG (#25) (6 mm 2) Coupled Bonding Conductor (CBC) wire from the ground block on the rear of the G3vs system. This wire later attaches to the new control cabinet. Move 25-Pair Cables from G3vs System to R8si 1. Remove any reusable 25-pair cables from the rear of the G3vs system. NOTE: The distance from the wall-mount G3vs system and the Release 8si system may require that all cables be replaced with longer cables. 2. Attach any reusable 25-pair cables to the required connectors on the rear of the Release 8si system. 3. Attach any new 25-pair cables to the required connectors on the rear of the Release 8si system. Route the new cables to the MDF and attach. Move Management Terminal Cable from G3vs System to R8si 1. Remove the management terminal cable from the rear of the G3vs system. 2. Attach the management terminal cable to the rear of the Release 8si system. Move Circuit Packs from G3vs System to R8si 1. Label each port circuit pack in the G3vs system with its slot number. 2. Remove all circuit packs from the G3vs system. Store the circuit packs in the static-proof packaging. 3. Remove and retain all apparatus blanks. 4. Install the power unit and the remaining control circuit packs into the new control cabinet. SeeTable 1-4 .
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-16 Upgrade to Release 8si 1 NOTE: A TN2182 Tone-Cloc k c an rep lac e the TN756 Tone-Detec tor/ Generator. If using a TN2182, you do not need a TN748B Tone-Detector. 5. Install the circuit packs into the appropriate port slots in the control cabinet. Because the new control cabinet has more port slots than the G3vs cabinet, you should not need to retranslate these circuit packs. 6. Install apparatus blanks in any vacated slots. 7. Check the load number on the TN790B Processor label. Insert the appropriate flashcard into the TN794 Network Control/Packet Interface based on the following parameters: nIf the load number is the Release 8 load number, insert the new or original translation card as directed in the Save Translation step and Remove ISDN Interface Links step. nIf the load number is not the Release 8 load number, insert the orange-labeled software memory card. Table 1-4. Circuit Packs for R8si Circuit Pack Name New or Used TN790B Processor New TN794 Network Control/Packet InterfaceNew TN765 Processor Interface 1 1. Only if BX.25 was administered. Reuse the circuit pack from G3vs system TN780 Tone-Clock/Generator Reuse the circuit pack from G3vs system Other port circuit packsVarious Reuse the circuit packs from G3vs system
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-17 Upgrade to Release 8si 1 Connect Control Cabinet Power and Ground 1. Connect the 6 AWG (#40) (16 mm2) wire (previously used on the G3vs cabinet) from the single-point ground block on the control cabinet to the approved ground. See Figure 1-3 . Figure 1-3. Typical AC Power and Ground Layout 2. Connect the 10 AWG (#25) (6 mm 2) wire (previously used on the G3vs cabinet) between the cabinet single-point ground block and the CBC. 3. Connect the supplied cabinet AC power cord to the AC receptacle on the rear of the control cabinet. Plug the opposite end of the cord into the dedicated electrical outlet. Figure Notes 1. Control Cabinet 2. Circuit Breaker 3. AC Power Receptacle 4. Single-Point Ground Block 5. 8-ft (2.5-m) Power Cord6. NEMA 5-15 or 5-20 Receptacle or Equivalent 7. 6 AWG (16 mm 2) Cabinet Ground Wire to Approved Ground 8. 10 AWG (6 mm 2) Wire to CBC 3 4 5 1 8 2 7 On OffOn Off 6r781851bCJL030896
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-18 Upgrade to Release 8si 1 Power Up the System 1. Set the cabinet circuit breaker to ON. The system performs the reset level 4 reboot process and loads translations from the translation card, which takes about 10 minutes. Administer the System 1. Log in as craft at the login: prompt. 2. Check for the Translation Corruption Detected message before proceeding with the upgrade. If corruption is detected, refer to ‘‘Translation Corruption Detected’’ in Appendix B, ‘‘Troubleshooting an Upgrade’’ to correct the problem. !CAUTION: Do not continue with the upgrade process until the translations errors are corrected. 3. Type status system 1 and press En te r to check the SPE Alarms field and verify that the Tone Clock is active. Set Daylight Savings Rules You can set up to 15 customized daylight savings time rules. A daylight savings time rule specifies the exact time when you want to transition to and from daylight savings time. It also specifies the increment at which to transition NOTE: The default daylight savings rule is 0, no daylight savings. 1. Type change daylight-savings-rules and press En te r.
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-19 Upgrade to Release 8si 1 2. Type the appropriate start and stop information in the Change Day, Month, Date, Time, and Increment (for example, 1:00 equals one hour) fields for each rule. NOTE: You can change any rule except rule 0 (zero). You cannot delete a daylight savings rule if it is in use on either the Locations or Date and Time screens. 3. When done, press En t e r. Set Date and Time 1. Type set time and press En te r to bring up the Date and Time screen. Screen 1-1. Typical Date and Time Screen DAYLIGHT SAVINGS RULES Rule Change Day Month___Date Time____Increment 0: No Daylight Savings 1: Start: first Sunday ___ on or after April___ 1 at _2:00 01:00Stop: first Sunday___ on or after October_ 25 at _2:00 2: Start: first _________ on or after ________ __ at __:__ Stop: first _________ on or after ________ __ at __:__ 3: Start: first _________ on or after ________ __ at __:__ Stop: first _________ on or after ________ __ at __:__ 4: Start: first _________ on or after ________ __ at __:__ Stop: first _________ on or after ________ __ at __:__ 5: Start: first _________ on or after ________ __ at __:__ Stop: first _________ on or after ________ __ at __:__ 6: Start: first _________ on or after ________ __ at __:__ Stop: first _________ on or after ________ __ at __:__ 7: Start: first _________ on or after ________ __ at __:__ Stop: first _________ on or after ________ __ at __:__ DATE AND TIME DATE Day of the Week: Tuesday Month: NovemberDay of the Month: 7 Year: 2000 TIME Hour: 20 Minute: 30Second: XX Type: standardDaylight Savings Rule: 1
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-20 Upgrade to Release 8si 1 2. Type the day in English (Sunday through Saturday) in the Day of the Week: field. See Table 1-5 for English day names. When done, press Ta b to move to next field. 3. Type the current month in English (January through December) in the Month: field. See Table 1-6 for English month names. When done, press Ta b to move to next field. 4. Type the day of month (1 through 31) in the Day of the Month: field and press Ta b to move to the next field. 5. Type the current year in the Year: field and press TA B to move to the next field. 6. Type the current hour for a 24-hour clock in the Hour: field and press Ta b to move to the next field. 7. Type the current minute (0 through 59) in the Minute: field (seconds cannot be set). When done, press Ta b to move to next field Table 1-5. English Day of the Week Names Day Number Day Name 1 Sunday 2 Monday 3 Tuesday 4 Wednesday 5 Thursday 6Friday 7 Saturday Table 1-6. English Month Names Number Name Number Name 1 January 7 July 2 February 8 August 3 March 9 September 4 April 10 October 5 May 11 November 6 June 12 December
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-21 Upgrade to Release 8si 1 8. Type standard or daylight savings in the Type field, according to the current time in the local time zone. For example, if currently on standard time, type standard. 9. Type the rule number in the Daylight Savings Rule field. 10. When all the information is correct, press En te r. 11. Type display time and press En t e r to verify date and time data. Set Additional Administration For standard reliability: 1. Type list configuration software-version and press En t e r to verify the system software version (in the Memory Resident field). For high or critical reliability: 1. Type list configuration software-version long and press En t e r to verify the system software version (in the Memory Resident field) For all reliabilities: 2. Perform a sanity check on the system by executing the following commands to ensure the translations were read in properly: a. list station b. list trunk-group c. list hunt-group This ensures there is no translation corruption and the translations can be saved with the new software. 3. Notify the switch administrator that for any previous login names and passwords that still exist, the passwords expire in 24 hours. When changed, the new login names and passwords must conform to the following requirements: As before, a login name must have 3 to 6 alphanumeric characters. A password must have 4 to 11 characters, including at least 1 alphabetic character and 1 numeric character. 4. Since an R1V3.0 G3-MA cannot notify users about expiring passwords, disable password aging for any login name used with an R1V3.0 G3-MA. Enable TTI NOTE: Do this step only if the TTI is disabled and you want it enabled. 1. Type change system-parameters features and press En te r to change the TTI field back to its value before the upgrade.
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-22 Upgrade to Release 8si 1 Resolve Alarms 1. Type display alarms and press En te r to examine the alarm log. Resolve any alarms that may exist using DEFINITY Enterprise Communications Server Maintenance for R8si . Check Link Status 1. Type display communication-interface links and press En t e r. 2. Type status link number and press En t e r. Repeat this step for each link. NOTE: You can no longer status a link to find out if your ISDN D-channels are up. In R7si and later systems, you must use the status signaling group command. 3. Type status signaling group x and press En te r to determine if an ISDN-PRI D-Channel is up. Enable Scheduled Maintenance 1. Type change system-parameters maintenance and press En t e r to enable the scheduled daily maintenance. 2. Check the time fields. Enable Customer Options and Alarm Origination to INADS 1. Get the DOSS order number of the upgrade from the project manager and ask the regional Customer Software Administration to complete the steps in the shaded box. See ‘‘Where to Call for Technical Support’’ on page -xx for telephone numbers. NOTE: As part of the system registration process, the INADS Database Administrator enables Alarm Origination. 2. When administration is completed, log in as craft at the Login: prompt.
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-23 Upgrade to Release 8si 1 Save Translations 1. Type save translation and press En t e r to copy upgraded translations in memory to the upgraded translation card, which takes about 10 minutes. Restore Announcements (if necessary) 1. Type restore announcements and press En t e r to copy announcements from the upgraded translation flashcard to memory, which takes about 40 minutes. Power Up DEFINITY LAN Gateway System 1. Log onto the DEFINITY LAN Gateway. 2. On the main menu, select Maintenance > Reset System > Reboot System. Power Up DEFINITY AUDIX System 1. To power up the AUDIX assembly, refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 1-26. init login administration: 1. Log in as init. 2. Type change system-parameters customer-options and press En t e r to verify that the customer options are properly set. 3. Go to screen 6, QSIG Optional Features, and set the Basic Call Setup field to y if the customer was using Supplementary Services Protocol b or d on an ISDN-PRI trunk group before the upgrade. 4. Type change system-parameters offer-options and press En t e r. 5. If the Activate Offer field is n, set it to y and press Ta b. A warning message lets you know whether you need to save translations and reboot to make the change permanent. 6. Press En te r to effect the changes or Canc el if there were no changes. 7. Contact the requester when done.
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading G3vs (w/Intel 386) to R8si 1-24 Upgrade to Release 8si 1 Display Memory-Configuration 1. Log in as craft. If the Translation Corruption Detected message appears, refer to ‘‘Translation Corruption Detected’’ on page B-5 . 2. Type display memory-configuration and press En te r. Check the total DRAM field. SIMM field “A” must contain a 16. Disassemble the G3vs System 1. Remove any unused 25-pair cables from the rear of the system. 2. Loosen the 4 shoulder screws holding the cabinet to the mounting plate. See Figure 1-4 . 3. Remove the locking screw holding the cabinet to the center of the mounting plate. 4. Return the system cabinet to its locked operating position. 5. Align the 4 shoulder screws with the keyhole slots and remove the cabinet from the mounting plate. 6. Remove the 5 lower wood screws from the wall plate and loosen the top 2 wood screws. Remove the mounting assembly. 7. Remove the top 2 wood screws.