Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-15 Upgrade to Release 8si 
    1
    Remove Ground Connections
    1. Remove the 6 AWG (#40) (16 mm2) ground wire from the ground block on 
    the rear of the G3vs system. This wire later attaches to the new control 
    cabinet.
    2. Remove the 10 AWG (#25) (6 mm
    2) Coupled Bonding Conductor (CBC) 
    wire from the ground block on the rear of the G3vs system. This wire later 
    attaches to the new control cabinet.
    Move 25-Pair Cables from G3vs System to R8si 
    1. Remove any reusable 25-pair cables from the rear of the G3vs system. 
    NOTE:
    The distance from the wall-mount G3vs system and the Release 8si 
    system may require that all cables be replaced with longer cables.
    2. Attach any reusable 25-pair cables to the required connectors on the rear 
    of the Release 8si system.
    3. Attach any 
    new 25-pair cables to the required connectors on the rear of the 
    Release 8si system. Route the new cables to the MDF and attach.
    Move Management Terminal Cable from G3vs 
    System to R8si
    1. Remove the management terminal cable from the rear of the G3vs system.
    2. Attach the management terminal cable to the rear of the Release 8si 
    system.
    Move Circuit Packs from G3vs System to R8si
    1. Label each port circuit pack in the G3vs system with its slot number.
    2. Remove all circuit packs from the G3vs system. Store the circuit packs in 
    the static-proof packaging. 
    3. Remove and retain all apparatus blanks.
    4. Install the power unit and the remaining control circuit packs into the new 
    control cabinet. SeeTable 1-4
    . 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-16 Upgrade to Release 8si 
    1
     
    NOTE:
    A TN2182 Tone-Cloc k c an rep lac e the TN756 Tone-Detec tor/ 
    Generator. If using  a TN2182, you do not need  a TN748B 
    Tone-Detector.
    5. Install the circuit packs into the appropriate port slots in the control cabinet. 
    Because the new control cabinet has more port slots than the G3vs 
    cabinet, you should not need to retranslate these circuit packs.
    6. Install apparatus blanks in any vacated slots.
    7. Check the load number on the TN790B Processor label. Insert the 
    appropriate flashcard into the TN794 Network Control/Packet Interface 
    based on the following parameters:
    nIf the load number is the Release 8 load number, insert the new or 
    original translation card as directed in the Save Translation step and 
    Remove ISDN Interface Links step.
    nIf the load number is not the Release 8 load number, insert the 
    orange-labeled software memory card.
    Table 1-4. Circuit Packs for R8si
    Circuit Pack Name New or Used
    TN790B Processor New
    TN794 Network Control/Packet 
    InterfaceNew
    TN765 Processor Interface 
    1
    1. Only if BX.25 was administered.
    Reuse the circuit pack from G3vs 
    system
    TN780 Tone-Clock/Generator Reuse the circuit pack from G3vs 
    system
    Other port circuit 
    packsVarious Reuse the circuit packs from G3vs 
    system 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-17 Upgrade to Release 8si 
    1
    Connect Control Cabinet Power and Ground
    1. Connect the 6 AWG (#40) (16 mm2) wire (previously used on the G3vs 
    cabinet) from the single-point ground block on the control cabinet to the 
    approved ground. See Figure 1-3
    . 
    Figure 1-3. Typical AC Power and Ground Layout 
    2. Connect the 10 AWG (#25) (6 mm
    2) wire (previously used on the G3vs 
    cabinet) between the cabinet single-point ground block and the CBC.
    3. Connect the supplied cabinet AC power cord to the AC receptacle on the 
    rear of the control cabinet. Plug the opposite end of the cord into the 
    dedicated electrical outlet. Figure Notes
    1. Control Cabinet 
    2. Circuit Breaker
    3. AC Power Receptacle
    4. Single-Point Ground Block
    5. 8-ft (2.5-m) Power Cord6. NEMA 5-15 or 5-20 Receptacle or 
    Equivalent
    7. 6 AWG (16 mm
    2) Cabinet Ground 
    Wire to Approved Ground
    8. 10 AWG (6 mm
    2) Wire to CBC
    3
    4
    5
    1
    8
    2
    7
    On
    OffOn
    Off
    6r781851bCJL030896 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-18 Upgrade to Release 8si 
    1
    Power Up the System
    1. Set the cabinet circuit breaker to ON. The system performs the reset 
    level 4 reboot process and loads translations from the translation card, 
    which takes about 10 minutes.
    Administer the System
    1. Log in as craft at the login: prompt. 
    2. Check for the Translation Corruption Detected message before 
    proceeding with the upgrade. If corruption is detected, refer to ‘‘Translation 
    Corruption Detected’’ in Appendix B, ‘‘Troubleshooting an Upgrade’’ to 
    correct the problem. 
    !CAUTION:
    Do not continue with the upgrade process until the translations errors 
    are corrected. 
    3. Type status system 1 and press En te r to check the SPE Alarms field and 
    verify that the Tone Clock is active.
    Set Daylight Savings Rules
    You can set up to 15 customized daylight savings time rules. A daylight savings 
    time rule specifies the exact time when you want to transition to and from daylight 
    savings time. It also specifies the increment at which to transition 
    NOTE:
    The default daylight savings rule is 0, no daylight savings.
    1. Type change daylight-savings-rules and press 
    En te r. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-19 Upgrade to Release 8si 
    1
    2. Type the appropriate start and stop information in the Change Day, 
    Month, Date, Time, and Increment (for example, 1:00 equals one hour) 
    fields for each rule. 
    NOTE:
    You can change any rule except rule 0 (zero). You cannot delete a 
    daylight savings rule if it is in use on either the Locations or Date and 
    Time screens.
    3. When done, press 
    En t e r. 
    Set Date and Time
    1. Type set time and press En te r to bring up the Date and Time screen.
    Screen 1-1. Typical Date and Time Screen
     
    DAYLIGHT SAVINGS RULES
    Rule Change Day Month___Date Time____Increment
    0: No Daylight Savings
    1: Start: first Sunday
    ___  on or after April___ 1  at _2:00 01:00Stop:  first Sunday___  on or after October_ 25 at _2:00 
    2: Start: first _________  on or after ________ __  at __:__
    Stop:  first _________ on or after ________ __  at __:__
    3: Start: first _________ on or after ________ __ at __:__
    Stop:  first _________ on or after ________ __ at __:__
    4: Start: first _________ on or after ________ __ at __:__
    Stop:  first _________ on or after ________ __ at __:__
    5: Start: first _________ on or after ________ __ at __:__
    Stop:  first _________ on or after ________ __ at __:__
    6: Start: first _________ on or after ________ __ at __:__
    Stop:  first _________ on or after ________ __ at __:__
    7: Start: first _________ on or after ________ __ at __:__
    Stop:  first _________ on or after ________ __ at __:__
     
                               DATE AND TIME
    DATE
     Day of the Week: Tuesday
    Month: NovemberDay of the Month: 7 Year: 2000
    TIME
    Hour: 20 Minute: 30Second: XX Type: standardDaylight Savings Rule: 1 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-20 Upgrade to Release 8si 
    1
    2. Type the day in English (Sunday through Saturday) in the Day of the 
    Week: field. See Table 1-5
     for English day names. When done, press Ta b 
    to move to next field.
    3. Type the current month in English (January through December) in the 
    Month: field. See Table 1-6
     for English month names. When done, press 
    Ta b to move to next field.
    4. Type the day of month (1 through 31) in the Day of the Month: field 
    and press 
    Ta b to move to the next field.
    5. Type the current year in the Year: field and press 
    TA B to move to the next 
    field.
    6. Type the current hour for a 24-hour clock in the Hour: field and press
     Ta b to 
    move to the next field.
    7. Type the current minute (0 through 59) in the Minute: field (seconds 
    cannot be set). When done, press 
    Ta b to move to next field
    Table 1-5. English Day of the Week Names
    Day Number Day Name
    1 Sunday
    2 Monday
    3 Tuesday
    4 Wednesday
    5 Thursday
    6Friday
    7 Saturday
    Table 1-6. English Month Names
    Number Name Number Name
    1 January 7 July
    2 February 8 August
    3 March 9 September
    4 April 10 October
    5 May 11 November
    6 June 12 December 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-21 Upgrade to Release 8si 
    1
    8. Type standard or daylight savings in the Type field, according to the 
    current time in the local time zone. For example, if currently on standard 
    time, type standard.
    9. Type the rule number in the Daylight Savings Rule field.
    10. When all the information is correct, press 
    En te r.
    11. Type display time and press 
    En t e r to verify date and time data.
    Set Additional Administration
    For standard reliability:
    1. Type list configuration software-version and press 
    En t e r to verify the 
    system software version (in the Memory Resident field).
    For high or critical reliability:
    1. Type list configuration software-version long and press 
    En t e r to verify 
    the system software version (in the Memory Resident field)
    For all reliabilities:
    2. Perform a sanity check on the system by executing the following 
    commands to ensure the translations were read in properly:
    a. list station
    b. list trunk-group
    c. list hunt-group
    This ensures there is no translation corruption and the translations can be 
    saved with the new software.
    3. Notify the switch administrator that for any previous login names and 
    passwords that still exist, the passwords expire in 24 hours. When 
    changed, the new login names and passwords must conform to the 
    following requirements:
    As before, a login name must have 3 to 6 alphanumeric characters. A 
    password must have 4 to 11 characters, including at least 1 alphabetic 
    character and 1 numeric character. 
    4. Since an R1V3.0 G3-MA cannot notify users about expiring passwords, 
    disable password aging for any login name used with an R1V3.0 G3-MA.
    Enable TTI
    NOTE:
    Do this step only if the TTI is disabled and you want it enabled.
    1. Type change system-parameters features and press 
    En te r to change the 
    TTI field back to its value before the upgrade. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-22 Upgrade to Release 8si 
    1
    Resolve Alarms
    1. Type display alarms and press En te r to examine the alarm log. Resolve 
    any alarms that may exist using 
    DEFINITY Enterprise Communications 
    Server Maintenance for R8si
    . 
    Check Link Status
    1. Type display communication-interface links and press En t e r. 
    2. Type status link 
    number and press En t e r. Repeat this step for each link.
    NOTE:
    You can no longer status a link to find out if your ISDN D-channels are up. In 
    R7si and later systems, you must use the status signaling group 
    command.
    3. Type status signaling group 
    x and press En te r to determine if an 
    ISDN-PRI D-Channel is up.
    Enable Scheduled Maintenance
    1. Type change system-parameters maintenance and press En t e r to enable 
    the scheduled daily maintenance.
    2. Check the time fields.
    Enable Customer Options and Alarm Origination 
    to INADS
    1. Get the DOSS order number of the upgrade from the project manager and 
    ask the regional Customer Software Administration to complete the steps 
    in the shaded box. See ‘‘Where to Call for Technical Support’’ on page -xx
     
    for telephone numbers.
    NOTE:
    As part of the system registration process, the INADS Database 
    Administrator enables Alarm Origination.
    2. When administration is completed, log in as craft at the Login: prompt. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-23 Upgrade to Release 8si 
    1
    Save Translations
    1. Type save translation and press En t e r to copy upgraded translations in 
    memory to the upgraded translation card, which takes about 10 minutes.
    Restore Announcements (if necessary)
    1. Type restore announcements and press En t e r to copy announcements 
    from the upgraded translation flashcard to memory, which takes about 40 
    minutes.
    Power Up DEFINITY LAN Gateway System
    1. Log onto the DEFINITY LAN Gateway.
    2. On the main menu, select Maintenance > Reset System > Reboot 
    System.
    Power Up DEFINITY AUDIX System
    1. To power up the AUDIX assembly, refer to ‘‘DEFINITY AUDIX Power 
    Procedures’’ on page 1-26.
    init login administration:
    1. Log in as init.
    2. Type change system-parameters customer-options and press 
    En t e r 
    to verify that the customer options are properly set.
    3. Go to screen 6, QSIG Optional Features, and set the Basic Call 
    Setup field to y if the customer was using Supplementary Services 
    Protocol b or d on an ISDN-PRI trunk group before the upgrade.
    4. Type change system-parameters offer-options and press 
    En t e r.
    5. If the Activate Offer field is n, set it to y and press 
    Ta b. A warning 
    message lets you know whether you need to save translations and 
    reboot to make the change permanent.
    6. Press 
    En te r to effect the changes or Canc el if there were no changes.
    7. Contact the requester when done. 
    						
    							DEFINITY ECS Release 8.2
    Upgrades and Additions for R8.2si  555-233-122  Issue 1
    April 2000
    Upgrading G3vs (w/Intel 386) to R8si 
    1-24 Upgrade to Release 8si 
    1
    Display Memory-Configuration
    1. Log in as craft. If the Translation Corruption Detected message 
    appears, refer to ‘‘Translation Corruption Detected’’ on page B-5
    .
    2. Type display memory-configuration and press 
    En te r. Check the total 
    DRAM field. SIMM field “A” must contain a 16. 
    Disassemble the G3vs System
    1. Remove any unused 25-pair cables from the rear of the system.
    2. Loosen the 4 shoulder screws holding the cabinet to the mounting plate. 
    See Figure 1-4
    .
    3. Remove the locking screw holding the cabinet to the center of the mounting 
    plate.
    4. Return the system cabinet to its locked operating position.
    5. Align the 4 shoulder screws with the keyhole slots and remove the cabinet 
    from the mounting plate.
    6. Remove the 5 lower wood screws from the wall plate and loosen the top 2 
    wood screws. Remove the mounting assembly.
    7. Remove the top 2 wood screws. 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual