    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    Section 3-5 - Installation Paperwork 3-23
    3-5-1-1 Rear Panel Connector (cont’d)
    Pin Assignment for Camera B/W
    NOTE: Output level of control signals indicated in the above tables are TTL level. Pin Assignment of Insite
    3-5-1-2 Front Connector Panel Located on the front panel are Microphone, LED, and Reset.  Table 3-16   Pin Assignment of Mini-Jack for Controlling B/W Camera
    Pin No
    Output Signal
    1P RIN T
    2 Signal GND
    Table 3-17   Pin Assignment of Mini-Jack for Controlling Color Camera
    Pin NoOutput Signal
    1 SHUTTER
    2 Signal GND
    Figure 3-9 Front Connector Panel
    7
    8
    Reset
    Microphone
    LED
    (HD access)
    Note:USB1.1. Some 
    systems do NOT have this 
    port. If your system has 
    this port, do NOT use this 
    port! Instead, use the 
    USB port located at the 
    rear connector panel.
    Serial
    For BT04 or later
    For BT03 or lower
    You can use
    the serial port. USB2.0 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    3-24Section 3-5 - Installation Paperwork
    3-5-1-3 B/W Printer Connector Panel
    3-5-1-4 Footswitch Connector Panel
    Round 5 pin connector.
    NOTE: Output level of control signals indicated in the above tables are TTL level. Table 3-18   Pin Assignment of Mini-Jack for Controlling B/W Printer
    Pin No
    Output Signal
    1P RIN T
    2 Signal GND
    Table 3-19   Pin Assignment of Mini-Jack for Footswitch
    Pin NoOutput Signal
    1S W1-W H
    2S W2-R D
    3S W3-G N
    4 SW1-BK, SW2-BK, SW3-BK
    5F ra m e G ND
    12
    3
    4
    5 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    Section 3-5 - Installation Paperwork 3-25
    This page was intentionally left blank. 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    3-26Section 3-5 - Installation Paperwork 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    Section 4-1 - Overview 4-1
    Chapter 4
    Functional Checks
    Section 4-1
    Overview
    4-1-1 Purpose for Chapter 4
    This chapter provides procedures for quickly checking major functions of the LOGIQ™ 7 console, 
    diagnostics by using the built-in service software, and power supply adjustments. 
    4-1-2 Special Equipment Required
    • An empty (blank) MO Disk.
    • At least one transducer.
    (normally you should check all the transducers used on the system.)
    Table 4-1   Contents in chapter 4
    SectionDescriptionPage Number
    4-1
    Overview 4-1
    4-2 General Procedure 4-2
    4-3 Functional Checks 4-20
    4-4 Application Turnover Check List 4-27
    4-5 Diagnostics 4-28
    4-6 Power Supply 4-29
    4-7 Site Log 4-30
    NOTICEMost of the information pertaining to this Functional Checks chapter is found in the LOGIQ™ 7 Quick 
    Guide (Direction Number 2291859-100).
    Look for the letters (QG) after a section in the Table of Contents to determine if the information is in this 
    chapter or in the Quick Guide. 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    4-2Section 4-2 - General Procedure
    Section 4-2
    General Procedure
    4-2-1 Lockout/Tagout Requirements
    Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the plug.
    4-2-2 Power On/Boot Up
    NOTE: After turning off the system, wait at least ten seconds before turning it on again. The system 
    may not be able to boot if power is recycled too quickly.
    4-2-2-1 Power Up 1.) Connect the Main Power Cable at the rear of the System.
    2.) Connect the Main Power cable to an appropriate mains power outlet.
    3.) Switch ON the Main Circuit Breaker at the rear of the System.
    When power is applied to the Scanner, and the Rear Circuit breaker is turned ON, Power is distributed 
    to the Fans, Control panel, Monitor, Internal and External I/O’s, Cage Boards, Peripherals and the 
    Backend Processor. When the Power ON/OFF key is pressed once, the Backend Processor starts and 
    its software code is distributed to initiate the scanner.
    CAUTIONSYSTEM REQUIRES ALL COVERS
    Operate this unit only when all board covers and frame panels are securely in place. The covers 
    are required for safe operation, good system performance and cooling purposes.
    WARNINGWARNINGPROTECTIVE EARTH MUST BE TAKEN WHEN CONNECTING AC POWER CABLE 
    (200V) WITHOUT ITS PLUG TO WALL OUTLET.
    Figure 4-1 Circuit Breaker
    Main Circuit Breaker Main Power Cable
    For BT04 or lator 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    Section 4-2 - General Procedure 4-3
    4-2-2-1 Power Up (cont’d)
    4.) Press the ON/OFF 
    key at the front of the System once.
    4-2-2-2 Power Up Sequence NOTE: For consoles with BEP4 (BT09), power switch lamp is darker compared to existing BT04-BT07  consoles with BEP3.  This is NOT abnormality and system will function normally regardless of 
    the brightness of the power button.
    1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON. Figure 4-2 Power On/Off Standby Switch Location
    Figure 4-3 Start Up Screen 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    4-4Section 4-2 - General Procedure
    2.) After initialization is complete, all lighted buttons on the Control Panel light and the default B-Mode 
    screen or Patient screen (no probes are connected) is displayed on the monitor display.
    4-2-2-3 Entering Maintenance Mode 4-2-2-3-1 R6.2.x or later 1.) Insert the service dongle into any USB port.
    2.) Wait for scanner boot-up.
    3.) Tap ON/OFF the power switch.
    4.) Click on  Exit.
    5.) Enter the proper password to enter the maintenance mode.
    6.) Click on  OK. Figure 4-4   Clicking on Exit
    Figure 4-5   Clicking on OK 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    Section 4-2 - General Procedure 4-5
    4-2-2-3 Entering Maintenance Mode (cont’d)
    7.) Click on  maintenance .
    8.) Click on  Exit to window .
    Figure 4-6   Clicking on Maintetance
    Figure 4-7   Clicking on Exit to Window
    7 7 
    						
    							GE HEALTHCARE
    DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
    4-6Section 4-2 - General Procedure
    4-2-2-3 Entering Maintenance Mode (cont’d)
    4-2-2-3-2 R 4.x.x to R6.0.x 1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
    2.) The “Probing for maintenance access” dialog appears. Enter  Password, then click on  OK.
    3.) Then Start Loader display will be shown on the Monitor display.Click on  Maintenance.
    4.) Click on  Exit to Windows  in maintenace diaglog window.Then the scanner is booted up 
    automatically.
    4-2-2-3-3 R2.x.x to R4.x.x 1.) Insert the service dongle in the Service port located at the rear panel.
    2.) The Start Up Screen will be shown on the Monitor display when the system is turned ON. 3.) Then Start Loader display will be shown on the Monitor display. Then the scanner is booted up  automatically.
    NOTE: To enter the Maintenance Mode, select Maintenance button.
    NOTE: Start is selected automatically when it time out. Figure 4-8   Clicking on Mainttenance
    Figure 4-9 Start Application Window 
    						