GE Logiq 7 Service Manual
Have a look at the manual GE Logiq 7 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-5 8-2-10 - System Set- tingsSoftware Versionexpected version R8.x.xver. Check Local Data FlowLocal Archive – Int.HDD OK NG Computer Name and connectivitySet parameters OK NG Software OptionsCheck OK NG Set VCR parameters Set parameters OK N/A Set LanguageSet Language options OK N/A Printer RegistrationSet printer OK N/A Report TemplateSet user template OK N/A Regional PresetSet Regional Preset. OK N/A Analog PeripheralSet analog peripheral parameters. OK N/A UP-D897Set UP-D897 parameter. OK N/A 8-2-11 - Functional CheckService PlatformBe able to enter SV platform OK NG Probe RecognitionNo artifacts or no problem’ OK NG SectionItemCheck ParameterResult
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-6Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-5 Software Loading Steering Guide This section and the following pages should provide detailed guide of the system and application installation procedures. Figure 8-55 BT07 Software Loading Procedures 8-2-6 - PRE-INSTALLATION PROCEDURES 8-2-7 - INSTALL BASE SYSTEM OS + ApplicationInstalling 8-2-10 - SYSTEM SETTINGS 8-2-11 - FUNCTIONAL CHECK 8-2-9 - INSTALLING R8.X.X APPLICATION SOFTWARE 8-2-8 - MODIFY SYSTEM/ WINDOWS SETTINGS
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-7 8-2-5-1 Processes prior to R8.x.x Installation 8-2-5-2 Processes to install R8.x.xFigure 8-56 Pre-installation Procedures NOTICE*1: Loading R8.x.x application software procedures requires, at minimum, C: Drives to be ghosted (as opposed to full ghost). In such case, patient image data, preset parameters, and customer data will be maintained. Nonetheless, for safe-keeping customer data, it is recommended to back up all data prior to R8.x.x installation. In case of Full Ghost, customer data/setting must be saved for restoration after the process. Figure 8-57 Software Loading Procedures NOTICE*1: Do not power ON the peripherals when installing base system image. Disconnecting LAN is also recommended procedure to ensure stable process. *2: Press the N key at start of process should FE wish to abort installation process. Pop-up window may appear to notify process in progress - FE does not have to click OK as it disappears automatically. Do NOT operate mouse or keyboard during process. It may cause abnormal system shutdown during installation. The system will shut down and restart automatically during process of application loading. Caution Item Check SW Level POWER ON Save Customer Setting *1 POWEROFF Important Item Power OFF USB Devices
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-8Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-5-3 After installation of R8.x.x Figure 8-58 Post Installation Procedures NOTICE*1: Verify that Probes are not connected to the scanner. Other peripheral devices such as printers should be turned ON at this time. *2: If Operator logon window appears, select adm(administrator) and enter the password that is configured already (default value is no password ? just press enter key). *3: If FE cannot see login window for Service Platform, then installation of the platform have failed. FE must double check the installation setting, and repeat ghost/appli load procedure. For entering password, make sure CAPS (lock) is OFF. *4: Each computer name is unique. Check the scanner serial number printed on the label located at the rear lower side of the scanner. For example, if 123456YM1 is printed, then enter L7-123456YM1 . Regional Preset, Analog Peripheral, and UP-D897 setting must be required. Make sure to press Save Setting before exiting scanner setup window, or otherwise operator cannot enter the new patient screen.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-9 8-2-6 Pre-installation Procedures The following section describes activities necessary before system and application installation. 8-2-6-1 Disabling USB Devices 1.) Turn OFF all USB peripherals connected to the scanner. 8-2-6-2 Save Customer Data / Setting Save the following user data. - Patient image data (Refer to operation manual.) Please confirm the user if the user has the Media (CD/DVD-R) that is not finalized on the system. You should finalize the Media before R8.x.x Upgrade. Because once the system is upgraded to R8.x.x, The system never recognizes the no-finalized media (CD/DVD-R). 8-2-6-3 Operator Login Password The Operator Login Password will be deleted even if the BECOMP is not replaced. So, write down the password if necessary. CAUTIONLoading R8.x.x application software procedures requires basically C drives to be ghosted. In this case, patient image data, preset parameters, and customer data will be kept. However , in case full ghost will be required, you MUST back up before starting this procedure as follows. For customer data safe, we recommend you to back up even for the C ghost only. Figure 8-59 Login Password ParametersDescriptions Operator Login Password Table 8-2 Login Password
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-10Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-6-4 Saving Connectivity Before starting upgrading, write down the Connectivity Setting for back-up. 1.) Touch Utility > Connectivity on the touch panel and click the TCP/IP tab. 2.) Write down the following parameters: Figure 8-60 TCP/IP ParametersDescriptions (Entry for Stand-Alone System) Computer NameEnable DHCP This parameter must NOT be selected. IP-Address (192.168.1.2) Subnet Mask(255.255.255.0) Default Gateway(192.168.1.1) Note : For a stand-alone system, preset values of IP adress, subnet mask, and default gateway, shown above, must entered. Table 8-3 TCP/IP Remove the Check mark.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-11 8-2-6-5 Software Option 1.) Touch Utility > Admin. 2.) Click on System Admin tab and write down HW Number and Installed Option Keys.. Figure 8-61 System Admin ItemsDescriptions HW Number Installed Option Key Table 8-4 System Admin
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-12Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-6-6 Regional Preset 1.) Go to Utility > System > About . 2.) Write down the current Preset Region. Figure 8-62 Preset Region
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-13 8-2-6-7 Printer Registration 1.) Select Utility > Connectivity > Button . 2.) Write down the printer names which are registered to Print1 through Print4. 3.) Click on >> to add Printflow View. Figure 8-63 Printer Registration ButtonActive Image Printer Print1 Print2 Print3 Print4 Table 8-5 Printer Registration Select Print x button to display the printer name here.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-14Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-7 Install Base System 1.) Power OFF the scanner, wait more than 5 seconds, then power ON the scanner. 2.) Open the DVD drive and set the Ghost DVD. DVD drive reads Ghost DVD automatically and go to next step. 3.) After loading software, when the following screen appears, press the Enter key. NOTICEBefore starting to install base system, all printer must be disconnected from the system. Figure 8-64 Enter