GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-25 8-2-8-5 TCP/IP Filter Setup (cont’d) 7.) If your system has no TCP port numbers as follows, perform these procedure to add the TCP port numbers. If the TCP port already have been set, skip these procedures. (This depends on the network card installed in the PC box.) * At first check mark Enable TCP/IP Filtering (All adapters) . *Check mark Permit Only in TCP ports box *Click Add... button. * Enter 21 (port number) as the TCP Port ,then click OK button to apply it. * Repeat these procedures to register 21, 23, 80, 104, 512, 3003, 5800, 5801, 5900, and 5901 for TCP ports. Figure 8-81 TCP port number NOTICEUDP Ports and IP Protocols must be kept default settings. The TCP port numbers, 21, 23, 80, 104, 512, 3003, 5800, 5801, 5900, and 5901 , have been set.No TCP port number is set. They must be set.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-26Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-8-5 TCP/IP Filter Setup (cont’d) 8.) Verify that the proper TCP port numbers are entered in TCP Ports box, then click OK buttons for all opened window to complete the TCP/IP Filter Setup . 9.) The following dialog box appears. Click No to proceed the other settings. (After completion of all system checks, the system is shut down.) Figure 8-82 TCP/IP Filter Setup Figure 8-83 No NOTICEIn case the last dialog box to restart the computer does NOT appear, check the TCP/IP Filter setup again. Connectivity check will be performed in 8-2-10 System Settings.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-27 8-2-8-6 Date and Time Setting 1.) Select Start > Settings > Control Panel > Date and Time. I 2.) Click on Time Zone tab. 3.) Select the appropriate time zone. Then click on Apply. 4.) Then click on Date & Time tab. Figure 8-84 Date and Time Figure 8-85 Time Zone
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-28Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-8-6 Date and Time Setting (cont’d) 5.) Set the current date and time. 6.) Click on Apply. 7.) Click on OK to close the Date and Time window. 8.) Select Start > Shutdown > OK to power OFF the scanner. Figure 8-86 Date & Time Month and Year Day Time
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-29 8-2-9 Installing R8.x.x Application Software 8-2-9-1 Installing R8.x.x Application Software 1.) Power ON the scanner. The windows desktop appears. 2.) Insert the Application Software CD-ROM into the DVD drive. NOTICEYou must install BT09 Base image before Application Software installation. If not, Application shows the error message, “Service platform is out of date. You must reghost the C drive and reinstall the software.” NOTICEIf you are attempting to install only application software, you MUST first check current Regional Preset Value. Press Utility > System > About (Details in 4-2-6 - Archiving and Loading Presets for BT07 (Including R7.5.x)). Figure 8-87 Desktop NOTICEAt this time, the DVD writing software screen appears, but you can ignore the screen. NOTICEWait approx. 20 seconds until the disk can be read.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-30Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-9-1 Installing R8.x.x Application Software (cont’d) 3.) Double-click on LoadSoftware.bat. 4.) The Installation program will start, and the command prompt screen will be shown on the monitor as shown. 5.) Select TYPE A - BT09 with BEP4 does not have PRO version available. Figure 8-88 LoadSoftware.bat NOTICE1.If wrong application software installed, the system will not work properly. 2.You will ask confirmation twice as below. If you select wrong system (A or B) , please select N at the confirmation.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-31 8-2-9-1 Installing R8.x.x Application Software (cont’d) 6.) Type Y key. NOTE: Press the N key to cancel this procedures and to power OFF the system. NOTE: When the Information Window appears asking you to select OK, do nothing. This window will disappear automatically. 7.) The installation procedures will start automatically. It will take 10 minutes. 8.) After the installation procedures are completed, the system will power OFF automatically. Figure 8-89 Y NOTICEDo not operate with using mouse or keyboard during installation procedures!!! The system shall be restarted automatically during installation.
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-32Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-10 System Settings After application is successfully installed, various LOGIQ™ 7 system parameters must be properly set. Table 8-7 System Settings ItemMethodProper Value Software Version Utility System About s/w version : R8.x.x Image Part No. : 5305206-3 Regional Preset Utility System About Additional About Information For the system other than “NONE” selected as Regional Preset, resetting MUST be required. Computer Name Utility Connectivity TCP/IP Computer Name Enable DHCP IP Address Subnet Mask Default Gateway Same as Serial Number OFF restore customer setting restore customer setting restore customer setting Patient Database CheckUtility Connectivity DataFlow \ Default Data Flow Press Patient (Keyboard or Touch Panel)Local Archive – Int. HD (n/a – Automatic) LCD Monitor SettingPress ‘Toggle Button’ for few seconds(various) Software OptionUtility Admin System Admin HW NumberSame as Option Dongle ID VCR Utility Peripherals Video Setting VCR PAL/NTSC-depends on region (set accordingly) Language pre-work (For Japanese Only) Utility Regional Option Language (tab) \ Install Files to East Asian Language (Reboot) ON / Apply
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-33 Language (For Japanese Only)Utility System General Language Regional Option Regional Option (tab) Standard and formats Location Language (tab) Details Settings (tab) Installed Service Default Input Language Advanced (tab) Language JPN Japanese Japan Japanese Keyboard Japanese Japanese Language (For Russian/ Greek Only)Utility System General Language Regional Option Regional Option (tab) Standard and formats Location Language (tab) Details Settings (tab) Installed Service Default Input Language Advanced (tab) Language RUS/GRK Russian/Greek Russia/Greece Rus/Grk Keyboard Russian/Greek Russian/Greek Table 8-7 System Settings ItemMethodProper Value
GE HEALTHCARE DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL 8-34Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-2-10-1 Peripheral Device Connection/Setup 1.) Connect all of the peripheral devices to the scanner.2.) Power ON all of the peripheral devices. 3.) Verify that the system boots up with no error. (It will take a few minutes.) 4.) Set up customer data saved at 8-2-6 Pre-installation Procedures. 8-2-10-2 Confirmation of the software version 1.) Touch the Utility button on the Touch Panel. NOTE: The Operator Login window appears. Select adm (Administrator) for the Operator field. Adm (Administrator) will be shown in the Operator field as default. Enter the password which is configured already (or the password might not be necessary). Then click on Log on. Figure 8-90 Utility Figure 8-91 Log on Press Utility button.