Home > NEC > Communications System > NEC Neax 2000 Ivs Wcs System Manual

NEC Neax 2000 Ivs Wcs System Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2000 Ivs Wcs System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							ND-46248 (E) CHAPTER 3Page 51
    Revision 2.0
    INSTALLATION
    4.4.5 PWR CNT CA-A and PWR CA-WK Connection
    Wh en  the  – 48  PWR  unit  is  e qi upped  f o r  NEAX1000  I V S,  con nect  the  PWR CNT  CA-A cable  a nd  the P W R
    CA -W K as  s h own  in  Figu re 3 -21 .
    Figure 3-21    Connection of PWR CNT CA-A and PWR CA-WK
    MAIN POWER 
    SUPPLY CARD
    BWB (Back Wiring Board)
    PWR0C
    PIM 0,1 PWR1
    PWR0A (SIG)
    CARD SLOTS
    PWR CA-WK –48V PWR UNIT
    PWR CNT CA-A
    Note:“SIG Connector ” is not labeled on the Main Power Supply card. 
    						
    							CHAPTER 3 ND-46248 (E)
    Pag e 52
    Revision 2.0
    INSTALLATION
    4.5 Connection of BUS Cables
    STEP 1: When the system is a multiple-PIM configuration, mount the BS00 card in the BUS slot of PIM0.
    Mount the BS01 card in each BUS slot of PIM1 through PIM7.
    When the system is a single-PIM configuration, neither BS00 nor BS01 card is needed.
    Figure 3-22    Mounting of BUS Cards
    B
    S
    0
    1
    B
    S
    0
    1
    B
    S
    0
    1
    B
    S
    0
    0
    B
    S
    0
    1
    B
    S
    0
    1
    B
    S
    0
    1
    B
    S
    0
    1
    PIM3
    PIM2
    PIM1
    PIM0PIM7
    PIM6
    PIM5
    PIM4
    BUS SLOT 
    						
    							ND-46248 (E) CHAPTER 3Page 53
    Revision 2.0
    INSTALLATION
    STEP 2: When the system is a multiple-PIM configuration, connect all the BUS cards to each other using BU S  ca b les,  as  show n  in  Figu re 3 -23  a nd  Figu re  3-24 .
    Figure 3-23    BUS Cable
    700 mm (27.6 inch)
    48-TW-0.7 CONN CA 
    						
    							CHAPTER 3 ND-46248 (E)
    Pag e 54
    Revision 2.0
    INSTALLATION
    Figure 3-24    Connection of BUS Cables
    PIM7
    PIM6
    PIM5
    PIM4 PIM3
    PIM2
    PIM1
    PIM0BS01
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1BS01
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1
    48-TW-0.7 CONN CA
    BS01
    BS01
    BS00BS01
    BS01
    BS01 
    						
    							ND-46248 (E) CHAPTER 3Page 55
    Revision 2.0
    INSTALLATION
    4.6 Switch Settings of Circuit Cards
    T able  3 -2  sh ows  the  cir cu it  ca rds  to  be e xpl ain ed  in  this  s e c tio n.
    * MB = Make Busy
    For the other circuit cards, refer to the Circuit Card Manual.
    Table 3-2  List of Circuit Cards
    NAME SWITCHES
    X: PROVIDED
    — : NOT PROVIDED LAMPS
    X: PROVIDED
    — : NOT PROVIDED EXTRACTION/INSERTION WITH 
    POWER ON
    X: ALLOWED
    ∆ : ALLOWED AFTER MB*
    — : NOT ALLOWED REFERENCE
    PW91 cardXX—
    Section 4.6.1
    PW00 card
    XX∆ Section 4.6.2
    CSH card
    XX∆ Section 4.6.3
    CSI card
    XX XSection 4.6.4 
    						
    							CHAPTER 3 ND-46248 (E) 
    Pag e 56
    Revision 2.0
    INSTALLATION4.6.1 Switch Settings of PW91 Card
    On the  P W 91 c ard,  set t h e  sw itches  as  sh ow n in  Fi gure  3 -25  and  Ta ble  3-3 .
    T able  3 -4  s hows  la mp  ind ica ti o ns  on  the PW91  ca rd.
    Figure 3-25    Locations of Switches, Lamps and Connectors on PW91 Card
    CAUTION
     When the operating power is being supplied to this circuit card, do not plug/unplug this circuit card
    into/from its mounting slot.
    Set the appropriate voltage by using the AC voltage select switch (slide switch) before powering on.
    FRONT VIEW
    SIDE VIEW SW
    ON
    BAT OPE
    OFFON
    240V AC
    100/120V AC
    1 
    2
    PWR ALM
    BATT2 
    BATT1 
    AC INPUT 
    SIG 
    MODE 
    DCOUT 
    						
    							ND-46248 (E) CHAPTER 3
    Page 57
    Revision 2.0
    INSTALLATION
    The figure in the SWITCH NAME column and the position in   in the SETTING POSITION column
    indicate the standard setting of the switch. When the switch is not set as shown by the figure and  , the
    setting of the switch varies with the system concerned.
    Table 3-3  Switch Settings on PW91 Card
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    BAT OPE
    PRESS
    MOMENTARILYTo start each PIM on battery power, when 
    AC power is not provided (Switch “SW” 
    must be ON).
    MODE
    1Not used
    2Standard setting for equalize battery charg-
    ing (Set to equalize for Gel cell or no bat-
    tery. Typically 54.6V (52.7 ~ 56.5V))
    OFFFor float battery charging
    Typically 51.6V (49.8 ~ 53.5V)
    SW
    ON For turning AC source power on
    OFF For turning AC source power off
    AC INPUT: 90 V - 138 V
    DOWN AC INPUT: 180 V - 276 V
    Table 3-4  Lamp Indications on PW91 Card
    LAMP NAME COLOR FUNCTION
    PWR ALM Red Lights upon occurrence of a major trouble
    ON Green Remains lit while the operating power is being supplied
    1
    2ON
    OFF
    ON
    ON
    OFF
    100/120VAC
    240VACUP 
    						
    							CHAPTER 3 ND-46248 (E) 
    Pag e 58
    Revision 2.0
    INSTALLATION4.6.2 Switch Settings of PW00 Card
    On the  P W 00 c ard,  set t h e  sw itches  as  sh ow n in  Fi gure  3 -26  and  Ta ble  3-5 .
    T able  3 -6  s hows  la mp  ind ica ti o ns  on  the PW00  ca rd.
    Figure 3-26    Locations of Switches, Lamps and Connectors on PW00 Card
    RUN
    MB
    CONN 
    						
    							ND-46248 (E) CHAPTER 3
    Page 59
    Revision 2.0
    INSTALLATION
    The figure in the SWITCH NAME column and the position in   in the SETTING POSITION column
    indicate the standard setting of the switch. When the switch is not set as shown by the figure and  , the
    setting of the switch varies with the system concerned.
    Note:When the power is on, flip the MB switch to ON (UP position) before plugging/unplugging the circuit
    card.
    Table 3-5  Switch Settings on PW00 Card
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    MB (Toggle SW)
    Note
    UPFor make-busy (–48 V power off)
    For normal operation (–48 V power on)
    Table 3-6  Lamp Indication on PW00 Card
    LAMP NAME COLOR FUNCTION
    RUN Green Remains lit while –48 V power is being supplied
    ON
    DOWN 
    						
    							CHAPTER 3 ND-46248 (E) 
    Pag e 60
    Revision 2.0
    INSTALLATION4.6.3 Switch Settings of CSH Card
    On the  CSH ca rd,  se t t h e sw it c hes  as  shown  in  Fig ure  3- 27 and  Tab le  3-7 .
    T able  3 -8  s hows  la mp  ind ica ti o ns  on  the CSH  ca rd .
    Figure 3-27    Locations of Switches and Lamps on CSH Card
    SENSE
    RUN 
    MB 
    DOPE7
    DOPE6 
    DOPE5 
    DOPE4 
    DOPE3 
    DOPE2 
    DOPE1
    DOPE0 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs Wcs System Manual