    							ND-46248 (E) CHAPTER 3Page 91
    Revision 2.0
    INSTALLATION
    Figure 3-43    Battery Connection in BATTM for PW86 Card
    STEP 2: Plug the battery cable connector into the BATT1 connector on the PW86 card in PIM0 or PIM4 as sh ow n in  Fi gure  3 -44 .
    Figure 3-44    Connection to PW86 Card
    TO PW86 CARD IN 
    PIM0/PIM4
    BATTERY CABLE
    BATTM
    Note:External batteries can be connected in the same manner as the batteries in the BATTM.
    Blue Black Red
    24 V DC
    BATTERY CABLE
    PW86 CARDBATT1 CONNECTOR
    PIM0/PIM4 
    						
    							CHAPTER 3 ND-46248 (E) 
    Pag e 92
    Revision 2.0
    INSTALLATION
    STEP 3: When the system is a multiple-PIM configuration, connect the PW86 cards to each other using thePWR CA-A  as s h ow n in  Fig ure  3- 45 .
    Figure 3-45    Connection of PWR CA-A for a Multiple PIM Configuration
    BATT2 
    BATT1
    PW86
    PIM3
    BATT2 
    BATT1
    PW86
    PIM2
    BATT2 
    BATT1
    PW86
    PIM1
    BATT2 
    BATT1
    PW86PIM0
    BATTERY CABLE
    BATT2 
    BATT1
    PW86
    PIM7
    BATT2 
    BATT1
    PW86
    PIM6
    BATT2 
    BATT1
    PW86
    PIM5
    BATT2 
    BATT1
    PW86PIM4
    BATTERY CABLE
    Note:External batteries can be connected in the same manner as the batteries in the BATTM.
    TO BATTM
    TO BATTM
    PWR CA-A PWR CA-APWR CA-A PWR CA-A 
    						
    							ND-46248 (E) CHAPTER 3Page 93
    Revision 2.0
    INSTALLATION
    2. For PW91 card (-48 V DC) 
    STEP 1: Connect the battery cables to the batteries, and mount the battery units (4x12 VDC, 24AH per unit) in to t he Ba tt e ry  M odule  ( B ATTM)  as sh ow n  in  Figure  3 -46  and 3 -47 .
    Figure 3-46    Battery Mounting into BATTM for PW91 Card
    BATTERY CABLE
    BATTM
    BATTERY UNIT (2x12 V DC, 24AH)
    BATTERY UNIT (2x12 V DC, 24AH)
    FRONT
    Recommended Batteries
    GS Portalac PE12V 24ABI 
    Yuasa NP24-12B
    Specifications UL Listed
    12VDC, 24AH 
    Terminal:  bolt/nut type with hole for 5mm bolt 
    Dimensions:
    166 mm L  ×
     175 mm W  ×
     125 mm H
    (6.54 in L  ×
     6.89 in W  ×
     4.92 in H)
    A: 12 mm
    5.5 mm
    B: 2 mm
    (.216 in) (.472 in)
    (.079 in)
    TO PW91 CARD IN PWRM 
    						
    							CHAPTER 3 ND-46248 (E) 
    Pag e 94
    Revision 2.0
    Figure 3-47    Battery Connection in BATTM for PW91 Card
    STEP 2: Plug the battery cable connector into the BATT2 connector on the PW91 card in the PWRM assh ow n in  Fi gure  3 -48 .
    Figure 3-48    Connection to PW91 Card
    TO PW91 CARD IN PWRM
    BATTERY CABLE
    BATTM
    Note:External batteries can be connected in the same manner as the batteries in the BATTM.
    -48 V DC
    Red
    Blue
    BATTERY CABLE
    PW91 CARD
    BATT2 CONNECTOR
    PWRM 
    						
    							ND-46248 (E) CHAPTER 3Page 95
    Revision 2.0
    INSTALLATION
    STEP 3: When the system is equipped with more than two PW91 cards, connect the PW91 cards to each other usin g t he P WR CA-A  as s how n in  Fig ure  3-49 .
    Figure 3-49    Connection of PWR CA-A/BATTERY CABLE
    PWRM
    PW91
    BATT2 
    BATT1PW91
    BATT2 
    BATT1PW91
    BATT2 
    BATT1PW91
    BATT2 
    BATT1
    TO BATTERYTO BATTERYPWR CA-APWR CA-A 
    						
    							CHAPTER 3 ND-46248 (E) 
    Pag e 96
    Revision 2.0
    INSTALLATION
    5. INSTALLATION FOR MULTI-SITE ROAMING
    5.1 Installation Procedure for Multi-Site Roaming
    Perform  th e  in sta lla ti on  pr oce dure  sh ow n in  Fi gure  3- 50 .
    Figure 3-50    Installation Procedure for Multi-Site Roaming
    END
    START
    MOUNTING DTI, DCH AND DBM CARD
    SELECTION OF PLO IN MP CARD
    CABLE CONNECTION VIA MDF SEE SECTION 5.2 
    SEE SECTION 5.3 
    SEE SECTION 5.5
    MOUNTING PLO CARD
    SEE SECTION 5.4 
    Note
    Note:PLO card (PN-CK00) is required when the PBX needs to interface with two clock supply routes 
    with different frequencies, such as 1.544 MHz and 192 KHz. 
    						
    							ND-46248 (E) CHAPTER 3Page 97
    Revision 2.0
    INSTALLATION
    5.2 Mounting DTI, DCH and DBM Card
    STEP 1: On the DTI (PN-24DTA-A/30DTC/30DTC-A) card, DCH (PN-SC01) card and DBM (PN-AP00) car d, s et  the  sw itch es  as  sh ow n in  Fig ure s 3 -51  th rough  3- 53.
    Figure 3-51    Switch Settings on DTI Card (1 of 2)
    SEE  Note.
    JPSJPR1
    JPR0 MB
    SW
    CRC
    PCM FRM
    AIS [RMT] 
    RMT [AIS] BLOFF
    ON
    8
     
    7 
    6 
    5 
    4 
    3 
    2 
    1
    JPS
    JPR0
    SENS RUN
    SW MB
    SET THE KNOB TO MATCH THE  
    AP NO. (04-15) TO BE SET BY 
    CM05.
    : POSITION TO  
      BE SET
    NEUTRAL GROUNDING ON  
    THE TRANSMIT LINE: 
    RIGHT :  NOT PROVIDED (OPEN) 
    LEFT :  PROVIDED (GROUND)
    NEUTRAL GROUNDING ON  
    THE RECEIVE LINE: 
    RIGHT : PROVIDED (GROUND) 
    LEFT :  NOT PROVIDED (OPEN) SW-5 
    ON  
    ON 
    ON 
    ON 
    OFF 
    OFF SW-6 
    ON 
    ON 
    OFF 
    OFF  ON 
    OFF SW-7 
    ON 
    OFF  ON 
    OFF  ON 
    OFF CABLE LENGTH
    :  POSITION TO BE SET
    SIGNAL IS NOT SENT 
    0-40 m (0-131 ft.)  
    40-80 m (131-262 ft.) 
    80-120 m (262-393 ft.)  
    120-160 m (393-524 ft.)  
    160-200 m (524-656 ft.)
    UP
    JPR1
    LINE IMPEDANCE: 
    RIGHT : NOT USED 
    LEFT : 100 OHMS
     PN-24DTA-A
    RIGHT : FACTORY TESTING 
    LEFT : NORMAL OPERATIONMAS
    AISSAIS SIGNAL SENDING 
    WHEN MAKE-BUSY OR POWER ON: 
    RIGHT :  SENT OUT 
    LEFT :  NOT SENT OUT
    AISS
    MAS
    [  ]: ON CARD ISSUE No. 5A OR MORE SMALLER SENS 
    						
    							CHAPTER 3 ND-46248 (E)
    Pag e 98
    Revision 2.0
    INSTALLATION
    Figure 3-51  Switch Settings on DTI Card (2 of 2)
    LINE IMPEDANCE:
    RIGHT :  75 OHMS (FOR COAXIAL CABLE)
    LEFT :  120 OHMS (FOR TWISTED-PAIR CABLE)
    JP
    MB
    UP
    SENS
    RUN
    MB
    SW
    PCM
    FRM
    FMRM
    RMT
    MRMT
    AIS
    SW
    ONOFF
    SET THE KNOB TO MATCH THE 
    AP NO. (04-15) TO BE SET BY 
    CM05.SENS
    : POSITION 
    TO BE SET
    8
    7
    6
    5
    1 2 3 4
    SEE 
    Note.
    : POSITION TO BE SET
    JPS
    BALANCED TRANSMISSION
    (FOR TWISTED-PAIR CABLE)
    TA GROUNDING ON THE TRANSMIT 
    LINE IS PROVIDED
    (FOR COAXIAL CABLE)
    JPS
    JP
    JPR
    JPR
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    DOWN :UP  :
    BALANCED TRANSMISSION
    (FOR TWISTED-PAIR CABLE)
    RA GROUNDING ON THE RECEIVE 
    LINE IS PROVIDED
    (FOR COAXIAL CABLE)
    DOWN :UP  :
    ON : COAXIAL CABLE
    OFF : TWISTED-PAIR CABLE
    BL
    PN-30DTC/30DTC-A Card: 
    						
    							ND-46248 (E) CHAPTER 3
    Page 99
    Revision 2.0
    INSTALLATION
    Note:
    When only one DTI is provided, the clock signals are supplied to the PLO through DTI 0. The DTI 0
    card must be mounted in PIM 0 and the SW settings are:
    .
    When multiple number of DTIs are provided, the system can supply the clock signals from DTI 0 or DTI
    1. The system is synchronized to the DTI 0 clock signals normally, and if the DTI 0 clock supply route
    is failed, the DTI 1 takes over. Both DTI 0 and DTI 1 cards must be mounted in PIM 0. The SW settings
    of DTI cards are:
    The SW settings of the DTI which is not a clock supply route are:DTI 0 
    SW-1 SW-2
    ON OFF
    DTI 0 DTI 1
    SW-1 SW-2 SW-1 SW-2
    ON OFF OFF ON
    DTI 2 DTI 3
    SW-1 SW-2 SW-1 SW-2
    OFF OFF OFF OFF 
    						
    							CHAPTER 3 ND-46248 (E)
    Pag e 10 0
    Revision 2.0
    INSTALLATION
    Figure 3-52    Switch Settings on DCH Card
    MB
    UP
    SW0
    ONOFF
    SET THE KNOB TO MATCH 
    THE AP NO. (04-15) TO BE SET 
    BY CM05.SENS
    : POSITION TO BE SET 4
    : POSITION TO BE SET.
    3
    1
    12345678 ON
    SW1
    SENS
    RUN
    MB
    SW0
    LC
    LPB
    ATTENTIONContents
    Static Sensitive
    Handling
    Precautions Required
    ON
    OFF: NORTHERN TELECOM INTERFACE
    : AT&T INTERFACE
    2 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs Wcs System Manual