NEC Neax 2000 Ivs Wcs System Manual
Have a look at the manual NEC Neax 2000 Ivs Wcs System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
![](/img/blank.gif)
ND-46248 (E) CHAPTER 3Page 31 Revision 2.0 INSTALLATION Figure 3-4 Wiring AC CORD-B to Terminals STEP 3: The AC CORD (A) and the FG Cable are pre-installed with the BASE. WARNING:For configurations with 3 or more PIMs plus one Power Module, secure the additional AC CORD ( A) to th e BA SE as shown in Fig u re 3 -5. AC CORD-B-U TO PW91 CARD IN PWRMAC CORD-B-U TO PW86 CARD IN PIM FGNEUTRALLINE BASE AC CORD (A)
![](/img/blank.gif)
CHAPTER 3 ND-46248 (E) Pag e 32 Revision 2.0 INSTALLATION Figure 3-5 Wiring AC CORD (A) to Terminals FGNEUTRALLINE BASE Additional AC CORD (A) AC CORD (A) (Provided with BASE)
![](/img/blank.gif)
ND-46248 (E) CHAPTER 3Page 33 Revision 2.0 INSTALLATION 4.2 Mounting PWRM/PIM STEP 4: Mount the PWRM on the BASE, and connect them together using three (3) bolts (provided) as shown in Figu re 3 -6. Note:The PWRM must be mounted over the 4 RACK PART screws previously installed. Figure 3-6 Mounting of PWRM STEP 5: Mount and connect the PIM on the PWRM with three bolts provided. When the system is a multiple-PIM configuration, connect PIMs to each other in the same manner. Note:The Battery Module (BATTM) and/or the MDF Module (MDFM) can be installed in the same man- ner as the PWRM. BA SE F R O N T PWRMNote
![](/img/blank.gif)
CHAPTER 3 ND-46248 (E) Pag e 34 Revision 2.0 INSTALLATION4.3 Mounting PWR Card 4.3.1 Mounting PW91 Card Mount t he PW91 ca rd into t h e Pow er Modu le (PWR M) as shown in Fig ure 3- 7. Figure 3-7 Mounting PW91 Card into PWRM (Power Module Unit) PW91 PWRM
![](/img/blank.gif)
ND-46248 (E) CHAPTER 3 Page 35 Revision 2.0 INSTALLATION 4.3.2 Mounting PW00 Card 1. Small Platform System Mount the PW00 card into the LT00-LT10 slot or AP5 slot. A maximum of three PW00 cards can be mounted in one PIM. Figure 3-8 Mounting PW00 Card into PIM (1 of 2) PW00BUILT-IN BATTERY PIM P W R AT T E N T I O NContents Static Sensitive Handling Precautions Required Note:The PW00 card occupies the adjoining left side (smaller number) slot because of its two-stories structure. LT00LT01LT02LT03LT04LT05LT06/AP0LT07/AP1LT08/AP2LT09/AP3LT10/AP4 AP5MP
![](/img/blank.gif)
CHAPTER 3 ND-46248 (E) Pag e 36 Revision 2.0 INSTALLATION 2. NEAX1000 IVS Mount the PW00 card into the LT00-LT08 slot. A maximum of three PW00 cards can be mounted in one PIM. Figure 3-8 Mounting PW00 Card into PIM (2 of 2) PW00BUILT-IN BATTERY PIM P W R LT00LT01LT02LT03LT04/AP0LT05/AP1LT06/AP2LT07/AP3LT08/AP4 MP AT T E N T I O NContents Static Sensitive Handling Precautions Required Note:The PW00 card occupies the adjoining left side (smaller number) slot because of its two-stories structure.
![](/img/blank.gif)
ND-46248 (E) CHAPTER 3 Page 37 Revision 2.0 INSTALLATION 4.3.3 Mounting –48V PWR Unit to NEAX1000 IVS STEP 1: Screw the –48V PWR unit on PWR MOUNT. Figure 3-9 Fixing –48V PWR Unit to PWR MOUNT PWR MOUNT–48V PWR UNIT M3, 20 mm ATTENTIONContents Static Sensitive Handling Precautions Required
![](/img/blank.gif)
CHAPTER 3 ND-46248 (E) Pag e 38 Revision 2.0 INSTALLATION STEP 2: Connect the PWR CA-WK to the –48V PWR unit. Figure 3-10 Connecting PWR CA-WK BLACK BLUE TO P W R 0 C TO PWR0 ATO MAIN POWER SUPPLY CARDWHITERED BLACK WHITE M4, 5 mm M4, 5 mmM3, 6 mm M3-20mm M3-20mm ATTENTIONContents Static Sensitive Handling Precautions Required
![](/img/blank.gif)
ND-46248 (E) CHAPTER 3 Page 39 Revision 2.0 INSTALLATION Figure 3-11 PWR CA-WK 160 (6.3) 120 (4.7) (15.7)400 (3.9)100 Unit: mm (inch)
![](/img/blank.gif)
CHAPTER 3 ND-46248 (E) Pag e 40 Revision 2.0 INSTALLATION STEP 3: Secure the PWR MOUNT to the PIM by two screws. Figure 3-12 Securing PWR MOUNT to PIM AT T E N T I O NContents Static Sensitive Handling Precautions Required MAIN POWER SUPPLY CARD PWR MOUNT INSERT INTO THE SLITS ON THE MAIN POWER CARD GUARD PANEL.M3, 6 mm