Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies GuestWorks Issue 6 Technician Handbook
Lucent Technologies GuestWorks Issue 6 Technician Handbook
Here you can view all the pages of manual Lucent Technologies GuestWorks Issue 6 Technician Handbook. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 201
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 191 INTUITY Lodging-to-PMS Translations PMS Interface for GuestWorks To administer the PMS Interface for GuestWorks, you must do the following: nEnable the feature on the switch nInstall the software on the INTUITY nSet up the system parameters on the INTUITY. To enable the Switch/INTUITY/PMS Link Integration feature (the “PMS Interface for GuestWorks” link), enter a y in the Forward PMS Messages to...
Page 202
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 192 INTUITY Lodging-to-PMS Translations Once the software is installed, use the Lodging Administration, System Parameter Administration command to administer the system parameters for INTUITY Lodging. nAttendant Extensions — Enter 0 for the attendant console, the backup telephone extensions, and any extensions that will be used to retrieve messages for guests. nPrimary Attendant — Enter the attendant...
Page 203
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 193 INTUITY Lodging-to-PMS Translations Stand-alone Interface Link To administer the stand-alone interface link, do the following: nDisable the integrated link feature on the switch nInstall the software on the INTUITY nSet up the link on the INTUITY nSet up the system parameters on the INTUITY. To use the hard-wired link between the INTUITY and the PMS (Figure 10 ), you must first disable the...
Page 204
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 194 INTUITY Lodging-to-PMS Translations Once the software is installed, use this screen on the INTUITY to administer the standard hard-wired link between the INTUITY Lodging and the PMS. Use the Lodging Administration, PMS Parameter Administration command to access this screen. nDevice for Link — This must match the physical por t connected to the Equinox card. Use /dev/ttysac if the connection is on...
Page 205
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 195 INTUITY Lodging-to-PMS Translations nMessage Lamp Controlled By — This should be set to LDG if you want INTUITY Lodging to control the guest room message lamps. If the lamp control is enabled for the PMS, the front desk personnel should take messages for guests when the PMS link is down because the message lamps will not be turned on even when the INTUITY has taken a message....
Page 206
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 196 INTUITY Lodging-to-PMS Translations Testing the INTUITY Lodging-to-PMS Link After the connection is complete and the link is active, the mini-tester should show the following results (see the Note on Pa ge 1 1 ). The leads marked with an aster- isk are controlled by the INTUITY system, and the PMS controls the other leads. !CAUTION: After using a mini-tester to check data leads, you MUST remove the...
Page 207
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 197 INTUITY Lodging-to-PMS Translations Administration, Log Administration, Maintenance Log command to set up which maintenance events will display. Table 12. PMS Event IDs Generated on the INTUITY Alarm Code Event IDs Description Clearing 11 PMS01, PMS02, PMS04, PMS05, PMS06, PMS07The PMS communication link is down.Restart PMS through the command menu. 12 PMS08 An unknown PMS commu- nication link...
Page 208
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 198 INTUITY Lodging-to-PMS Translations Use the following procedure to test the voice mailboxes for the guest rooms: NOTE: When using TCP/IP or X.25 signaling, mailboxes are created automatically for the guest rooms and do not require administration. When using Mode Code signaling, guest mailboxes must be created manually. See “ Mailboxes for Guest Rooms (INTUITY)” on Page 131 for more information. 1. Do...
Page 209
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 199 INTUITY Lodging-to-PMS Translations 4. Display the following screen using the Lodging Administration, Traffic and Space Usage Reports, Mailbox Usage command to verify that the test mailbox was created. 5. After you verify that the guest mailbox was created, remove the test entry by doing a check-out at the PMS terminal. NOTE: The Guest Password and Guest Personal Greeting options are not con- trolled...
Page 210
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 200 Switch-to-Call Accounting Translations Switch-to-Call Accounting Translations You must assign the link between the switch and the INTUITY, administer the CDR parameters, and enable CDR for each incoming and outgoing trunk group that the customer wishes to record. If a stand-alone call accounting system (such as Xiox) is used, the vendor must assist in setting up the call accounting system. Link...