Page 221
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 211 Switch-to-PMS Link Translations Switch-to-PMS Link Testing with the RS232 Mini-Tester Using the RS232 Mini-Tester (see the Note on Pa ge 1 1), check the status of the PMS link. The leads marked with an asterisk are controlled by the switch, and the PMS controls the other leads. If any switch leads are dark, there is no connection. !CAUTION: After using a mini-tester to check data leads, you MUST...
Page 222
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 212 Switch-to-PMS Link Translations If the link to a PMS is idle, the mini-tester may also show the following. The Physical Link State will be down, and the Protocol State will be down. Possible causes may be that the PMS hardware is powered-up, but the switch is not administered correctly, or the PMS link is busied out at the switch. NOTE: The CTS lead shows green when used with an 8400B. RTS will be...
Page 223
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 213 Switch-to-PMS Link Translations Netcon and Data Module Testing To test the netcon and the data modules, do the following: 1. Use the status data-module XXXX command (where XXXX is the exten- sion of the netcon data module). If the status message shows that the netcon data module is in the in-ser- vice/active state and shows the connected port of the actual data module, this indicates that there was an...
Page 224
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 214 Switch-to-PMS Link Translations PMS Testing and Status Use the test pms command to test the PMS link. If the link is not active, this com- mand sometimes causes the link to be established. The PMS test (Test 215) should PASS before testing can proceed. Use the status pms-link command to display the current status of the PMS link. The following is an example of that screen: The fields are defined as...
Page 225
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 215 Switch-to-PMS Link Translations Database Swap Testing To test database swapping, do the following: 1. Busy-out the PMS link using the busyout pms-link command. 2. Do a check-in or check-out on the test room from the attendant console or backup telephone. This sets the flag for the switch to request a database swap from the PMS. 3. Release the PMS link using the release pms-link command. 4. Use the...
Page 226
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 216 Switch-to-PMS Link Translations Check-In and Check-Out Testing To test check-in and check-out, do the following: 1. Do a check-in for the test room from the PMS terminal. 2. Use the status station XXXX command (where XXXX is the test room number). The status should appear as follows: At check-in, the Room Status field displays occupied, and the User Cntrl Restr field displays none. If an occupied...
Page 227
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 217 Switch-to-PMS Link Translations Message Waiting Testing You must test manual message waiting and voice messaging (if installed). To test manual message waiting, do the following: 1. From the PMS terminal, activate manual message waiting for the test room. 2. Use the status station XXXX command (where XXXX is the test room number). The status should appear as follows: 3. Use the list pms-down command...
Page 228
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 218 Switch-to-PMS Link Translations To test voice messaging by retrieving the message from the test room, do the following: 1. Call the test room. 2. Leave a message after the greeting and tone. 3. Use the status station XXXX command (where XXXX is the test room number). The status should appear as follows: 4. Use the list pms-down command to display any PMS messages that may help you troubleshoot link...
Page 229
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 219 Switch-to-PMS Link Translations To test voice messaging by retrieving the message from the attendant console, do the following: 1. Call the test room. 2. Leave another message after the greeting and tone. 3. Use the status station XXXX command (where XXXX is the test room number). The status should appear as follows: 4. Use the list pms-down command to display any PMS messages that may help you...
Page 230
GuestWorks Issue 6 Technician Handbook 555-231-109 Issue 1 April 2000 Translations and Testing 220 Switch-to-PMS Link Translations Controlled Restrictions Testing To test Controlled Restrictions, do the following: 1. From the PMS terminal, activate Outward Restriction on the test room. 2. Use the status station XXXX command (where XXXX is the test room number). The status should appear as follows: 3. Use the list pms-down command to display any PMS messages that may help you troubleshoot link...