Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 111
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-5 Test Time Division Multiplexing Bus in Processor Port Network 4 Test Time Division Multiplexing Bus in Processor Port Network 1. Verify the sc reen d isp lays command: 2. Type test tdm port-network 1 and p ress En t e r. 3. Verify the sc reen d isp lays the results of this test. See Sc reen 4-4 . Screen 4-4. Sample Test Results for TDM Bus Port...
Page 112
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-6 Test Tone-Clock Boards 4 Test Tone-Clock Boards Testing the Tone-Clock board also detects problems with the TDM bus cables. 1. Verify the sc reen d isp lays command: 2. Type test tone-clock 1a and p ress En t e r. 3. Verify pag e 1 disp lays the test results similar to Sc reen 4-5 . Screen 4-5. Sample Test Results for Tone-Clock 1A test...
Page 113
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-7 Test Expansion Interface Circuit Packs 4 Test Expansion Interface Circuit Packs Chec k eac h Expansion Interfac e (EI) c irc uit pac k in the system. 1. Verify the sc reen d isp lays command: 2. Type test board xxx where xxx is the c ab inet, c arrier, and slot for an Exp ansion Interfac e (EI) c irc uit p ac k in the system, and p ress En te...
Page 114
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-8 Test Time Division Multiplexing Bus for Each Expansion Port Network 4 Test Time Division Multiplexing Bus for Each Expansion Port Network Check eac h TDM bus for each Expansion Port Network (EPN) in the system. 1. Verify the sc reen d isp lays command: 2. Type test tdm port-network 2 and p ress En t e r. 3. Verify a test results sc reen similar...
Page 115
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-9 Test Tone-Clock for Each Expansion Port Network 4 Test Tone-Clock for Each Expansion Port Network 1. Verify the sc reen d isp lays command: 2. Type test tone-clock 2A where 2A is the c abinet and c arrier numb er for one of the Tone-Cloc ks installed , and p ress En t e r. If any result is FAIL , c hec k the assoc iated TDM b us c ables and...
Page 116
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-10 Test Expansion Interface Exchange for Each Expansion Port Network 4 Test Expansion Interface Exchange for Each Expansion Port Network If the system is c ritic al reliab ility, test the exp ansion interfac e exc hang e for eac h Exp a n si o n Po r t N e t w o rk ( EPN ). 1. Verify the sc reen d isp lays command: 2. Type status system...
Page 117
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-11 Check Circuit Pack Configuration 4 Screen 4-9. Sample of System Status after Expansion Link is Set 6. Verify the MODE s of the exp ansion links have c hang ed . 7. If any prob lems are ind ic ated , c hec k the TDM c ab les and the inter-c ab inet c ab les (ICC) in the assoc iated Exp ansion Port Network (EPN). Check Circuit Pack Configuration...
Page 118
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Test the System 4-12 Next Steps 4 Next Steps 1. Install the telep hones and other equip ment. These p roc ed ures are in Chapter 5, ‘‘Install and Wire Telep hones and Other Eq uip ment’’ . 2. Ad minister the features, telep hones, and other eq uipment ac c ord ing to c ustomer d ata found on the p rovisioning p lan. Use the p roc ed ures in DEFINITY Enterp...
Page 119
Install and Wire Telephones and Other Equipment 5-1 Voice and Data Terminals 5 DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 5 Install and Wire Telephones and Other Equipment The wiring p roc ed ures are the same for most of the DEFINITY System telep hones and other eq uip ment. This sec tion p rovid es wiring examp les of these similar installation p roc ed ures. These are examp les only and ac tual wiring...
Page 120
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-2 Telephone Connection Example 5 The g eneral step s to c onnec t a telep hone are: 1. Choose a d evic e to c onnec t suc h as a 302C1 Attend ant Console. 2. Choose the port circuit pac k and its carrier and slot number, such as c ab inet 1, c arrier C, slot 02. 3. Choose a p ort c irc uit on the p ort c irc uit pac...