Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 141
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-23 Install Off-Premises or Out-of-Building Stations 5 Figure 5-11. Connections for 1 to 8 Out-of-Building Analog Telephones Figure Notes 1. Loc ally Eng ineered Cab les and Eq uip ment 2. Out-of-Build ing Wiring 3. 25-Pair Connec tor 4. Multi-Pair Protec tor Units (Primary Protec tors with Heat Coils or Eq...
Page 142
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-24 Install Off-Premises or Out-of-Building Stations 5 Fi g u re 5 - 1 2 shows the c onnec tions for up to 24 off-p remises analog telep hones. Conc entrations of analog line p airs are used at b oth b uild ing s to minimize the off-p remises wiring req uired . At the MDF, jump ers must b e c onnec ted b etween...
Page 143
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-25 Install Off-Premises or Out-of-Building Stations 5 Carb on b loc k, or eq uivalent p rotec tion is req uired at both b uilding entranc es. Also sneak c urrent p rotec tion is req uired . Protec tion c an b e provid ed b y a 4-typ e p rotec tor or a 3-typ e p rotec tor p lus a sep arate sneak c urrent p rotec...
Page 144
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-26 Install Off-Premises or Out-of-Building Stations 5 The following tab le d etails the p rotec tor ord ering information. Digital Out-of-Building Voice Terminals Protec tion is req uired at b oth b uild ing entranc es for d ig ital out-of-b uilding voic e terminals. There are two d ifferent typ es of p rotec tors...
Page 145
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-27 Install Off-Premises or Out-of-Building Stations 5 When p ossib le, all new and reused wiring installations should use b loc ks that ac c ep t the stand ard 5-p in p lug -in 4C3S-75 p rotec tor. However, there are reused wiring installations where this may not b e c ost effec tive. For these installations,...
Page 146
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-28 Install Emergency Transfer Units and Associated Telephones 5 Install Emergency Transfer Units and Associated Telephones An 808A Emerg enc y Transfer Panel mounted next to the trunk/auxiliary field p rovid es emerg enc y transfer c ap ab ility. You c an use 500- and 2500-series analog telep hones for either emerg...
Page 147
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-29 Install Emergency Transfer Units and Associated Telephones 5 Install the 808A Emergency Transfer Panel Figure 5-13 shows a typ ic al 808A Emerg enc y Transfer Panel. The 808A c onnec ts to the MDF with B25A or A25B c ab le. The following proc ed ures are p rovid ed as a typ ic al installation examp le. Figure 5-13....
Page 148
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-30 Install Emergency Transfer Units and Associated Telephones 5 The p anel c an b e installed on any mounting frame in either a vertic al or horizontal p osition. The housing has ears for sc rew-mounting and c utouts for snap - mounting the unit in an 89-typ e mounting b rac ket. See Fig ure 5-14 . Figure 5-14....
Page 149
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-31 Install Emergency Transfer Units and Associated Telephones 5 3. Connec t a 25-p air c ab le b etween the male RJ21 25-p air c onnec tor on the Emerg enc y Transfer Panel and the yellow field of the Main Distrib ution Frame (MDF). Tab le 5-13 shows the p inouts. 4. Make c ross-c onnec tions for eac h emerg enc y...
Page 150
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-32 Install Emergency Transfer Units and Associated Telephones 5 Table 5-13. Pin Assignments for 25-Pair Connector 26 W-BL TTC1 Tip -PBX Trunk Circ uit 1 1 BL-W RTC1 Ring -PBX Trunk Circ uit 1 27 W-O TTK1 Tip -CO Trunk Circ uit 1 2 O-W RTK1 Ring -CO Trunk Circ uit 1 28 W-G TLC1 Tip -PBX Line Port 1 3 G-W RLC1 Ring -PBX...