Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 181
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-63 Install Multi-point Adapters 5 367A Adapter The 367A is an 8-c onduc tor ad ap ter used at the work loc ation to b ridg e 3 to 7 terminals. See Fig ure 5-25 . Figure 5-25. Wiring Diagram of 367A Adapter Figure Notes 1. Jac k 1 2. Jac k 23. Jac k 8 4. 367A Adap ter 312 88 877 766 655 544 433 322 211 1 4
Page 182
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-64 Install Multi-point Adapters 5 Basic Multi-point Installation Distances Fi g u re 5 - 2 6 p rovid es c ab ling information for fan-out of ISDN-BRI multi-p oint installations. In Fig ure 5-26 , the terminating resistor is loc ated in the satellite c loset. All d istanc es assume 24 AWG (#5) (0.5 mm2) D-Insid e...
Page 183
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-65 Connect Stratum 3 Clock 5 Connect Stratum 3 Clock Set Clock Options 1. There are four sets of op tion switc hes on the c loc k. Set the op tions on the Cloc k Inp ut (CI) c irc uit p ac k p er Tab le 5-15 . 2. Set the options on the Stratum 3 Clock (ST3) circuit pack per Tab le 5-16. NOTE: Only SW 1 and SW2 are...
Page 184
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-66 Connect Stratum 3 Clock 5 NOTE: Set switc hes 1 and 2 ac cording to the d istanc e from the Stratum 3 c loc k to the DEFINITY System. Set switch 3 to ON. Set switc h 4 to OFF. Cabling the Stratum 3 Clock Figure 5-27 shows typ ic al c onnec tions to a Stratum 3 Cloc k c ab inet. Connec tions are mad e throug h the...
Page 185
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-67 Connect Stratum 3 Clock 5 Figure 5-27. Typical Connections to Stratum 3 Clock Figure Notes: 1 . SC C C a b in e t ( PPN ) 2.“A” Position 3. “ B” Position 4. H600-307 Cab le 5. H600-247 G2 Cab le 6. 1300 Feet (396 m) 7. B25A (Male-to-Female) Cable 8. Channel Servic e Unit (Sec ond ary)9. Channel Servic e Unit...
Page 186
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-68 Connect Stratum 3 Clock 5 Stratum 3 Clock Wiring Installation Procedure 1. Connec t the B25A c ab les from the TN780 c onnec tor panel slot on the system c ab inet and the Stratum 3 Cloc k to the c ross-c onnec t mod ule in the yellow field . 2. Connec t the CSU p lug end of the H-600-274 (Y) c ab le to the p...
Page 187
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-69 Connect Stratum 3 Clock 5 Table 5-19. Cross-Connects for Standard Reliability From: Stratum 3 Clock To: Y Cable Clock End (Primary) Lead DesignationLead ColorConnecting Block Te r m i n a lLead DesignationLead ColorConnecting Block Te r m i n a l RREF1 W- BL 1 V- O 4 3 TREF1 B L - W 2 O - V 4 4 To: Y Cable...
Page 188
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-70 Connect Stratum 3 Clock 5 7. The c ommon c ross-c onnec tion from the TN780 in A and B c arriers to the Stratum 3 Cloc k should b e d one b y brid ging the jump er wires. 8. Dress the c ab les d own sid es of the c ab inet and run throug h the Cable Slack Manager, if provided. 9. Ad minister p er DEFINITY...
Page 189
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-71 DEFINITY Wireless Business System 5 DEFINITY Wireless Business System To install and test the hard ware, refer to DEFINITY Wireless Business System Installation and Tests Guid e . To interfac e the Wireless Business System to the system c ab inet, refer to DEFINITY Wireless Business System Interfac e. To operate...
Page 190
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-72 Connect Modem to Telephone Network 5 Connect Modem to Telephone Network 1. Cross-c onnec t the network jac k on the mod em to the network interfac e (via a 103A or mod ular wall jac k). See Table 5-21 for the p inout. Figure 5-28. Network Jack on U.S. Robotics Modem Table 5-21. Pinout of Network Jack Pin Number...