Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 161
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-43 Install the 1145B Power Supply 5 Figure 5-18. Expanded Power Distribution Unit Figure Notes 1. Wall-Mounting Plate 2. Sec ond 1146B Power Distrib ution Unit3.“ T” Cab le (H600-347-G7) 4. First 1146B Power Distrib ution Unit 5. 1145B Power Unit 1145 Power Unit 1149 Battery On Battery Reserve Charging Battery...
Page 162
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-44 Install the 1145B Power Supply 5 Power Up and Test The following table describes the meaning of the power supply LEDs when lit. 1. Connec t the AC power c ord to the power sup p ly and route the c ord to an ap p rop riate AC outlet using the c lip s p rovid ed on the unit. NOTE: A maximum of four p ower sup...
Page 163
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-45 Install the 1145B Power Supply 5 Wire the 1146B Power Distribution Unit Wire end points to the 1146B while p ower from the 1145B is on. A red LED lig hts if its assoc iated c irc uit is c onnec ted to shorted wiring or to a shorted terminal. 1. Install c ross-c onnec t jump ers to wire from the unit (the lab...
Page 164
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-46 Install the 1145B Power Supply 5 Reset LEDs on Power Distribution Unit A red LED next to any of the 32 p ower output c onnec tors ind ic ates a short c irc uit in the b uild ing wiring or the terminal eq uip ment. To reset the LED: 1. Disc onnec t the terminal eq uip ment from the wall jac k. 2. If the LED g oes...
Page 165
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-47 1151A1 and 1151A2 Power Supplies 5 nTo red uc e risk of elec tric shoc k, d o not d isassemble these p rod uc ts. Return them for rep air when need ed . Op ening or removing c overs may exp ose you to d angerous voltag es or other risks. Inc orrec t reassemb ly c an c ause elec tric shoc k when the p rod uc ts...
Page 166
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-48 1151A1 and 1151A2 Power Supplies 5 Important Safety Instructions Please read the following helpful tip s. Retain these tip s for later use. When using this p ower sup p ly, the following safety p rec autions should always b e followed to red uc e the risk of fire, elec tric shoc k, and injury to persons. nRead...
Page 167
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-49 1151A1 and 1151A2 Power Supplies 5 The 1151A1 and 1151A2 Power Supplies The 1151A1 and 1151A2 Power Sup p lies c an b e used to sup p ly loc al p ower to ISDN-T 65xx, 74xx, 75xx, 84xx, and 85xx series voic e terminals c onnec ted to a system and to the 302C1 Attend ant Console that req uires auxiliary p ower...
Page 168
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-50 CAMA/E911 Installation 5 Figure 5-20. 1151A1/2 Power Supply — Front CAMA/E911 Installation Configuration The CAMA/E911 feature req uires the TN429C/D CO trunk c irc uit p ac ks (or later suffix). Port Networks (PNs) that inc lud e TN429C c irc uit pac ks used to interfac e to CAMA trunks req uire some CPTR resourc...
Page 169
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-51 CAMA/E911 Installation 5 Administration Setup 1. At the promp t, type add trunk next and press En t e r. Screen 5-1. CAMA Trunk Group form (page 1) 2. On the Trunk Group sc reen (p ag e 1), in the Group Type: field, enter cama . 3. In the Group Name: field , enter the d esired name. 4. In the TAC: field ,...
Page 170
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-52 CAMA/E911 Installation 5 Screen 5-2. Administrable Timers form (page 3) 8. On the Administrable Timers sc reen (page 3), you may need to adjust these field s ac c ord ing to your CO. Sc roll to pag e 5. Screen 5-3. Group Member Assignments form (page 5) 9. On the Group Memb er Assig nments sc reen, in the Port...