Trane Intellipak 2 Service Manual
Have a look at the manual Trane Intellipak 2 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 12 Trane manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Installation RT-SVX24K-EN51 Unit Rigging and Placement 1. To configure the unit Center-of-Gravity, utilize TOPSS or contact the local Trane sales office. 2. Attach adequate strength lifting slings to all lifting lugs.The figures beginning with Figure20, p.51show the minimum distance between the lifting hook and the top of the unit and illustrate the installation of spreader bars to protect the unit and to facilitate a uniform lift. Table 12, p. 44lists typical approximate minimal unit operating weights. To determine additional component weight, see Table13, p. 44 3. Test lift the unit to ensure it is properly rigged and balanced, make any necessary rigging adjustments. 4. Lift the unit and position it over the curb and pedestal. (These units have a continuous base rail around the air handler section which matches the curb. 5. Align the base rail of the unit air handler section with the curb rail while lowering the unit onto the curb. Make sure that the gasket on the curb is not damaged while positioning the unit. (The pedestal simply supports the unit condenser section) A cross section of the juncture between the unit and the roof curb is shown in Figure 19. WARNING Heavy Objects! Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift. Other lifting arrangements could cause equipment or property damage. Failure to follow instructions above or properly lift unit could result in unit dropping and possibly crushing operator/ technician which could result in death or serious injury. Figure 19. Curb cross section Figure 20. Typical unit rigging—one-piece unit with three lifting lugs per side (a) One piece unit with three lifting lugs per side Turnbuckle or Chain Adjustment for each lug
Installation 52RT-SVX24K-EN Figure 21. Typical unit rigging—one piece unit with four lifting lugs per side(a) 15 ft min 20 ft min Turnbuckle or Chain Adjustment for each lug Figure 22. Typical unit rigging—two-piece unit with two lifting lugs per side(a) Turnbuckle or Chain Adjustment for each lug
Installation RT-SVX24K-EN53 Figure 23. Typical unit rigging—two-piece unit with three lifting lugs per air handler side(a) (a) Turnbuckle or Chain Adjustment required for each lifting point 24 ft min Turnbuckle or Chain Adjustment for each lug
Installation 54RT-SVX24K-EN Figure 24. Typical unit rigging—three-piece unit Air-Cooled and Evaporative Condensers— Three-Piece Unit Fit Up 1. Rig and lift outside air section and evaporator section separately. 2. Do not assemble unit on ground and attempt to lift toroof. Unit must be assembled on roof curb. 3. Attach rail guide provided to bottom of the evaporator base rails as shown with screws. 4. Rig and set the evaporator section onto the roof curb (aligned with supply end). 5. Remove and discard shipping protection panels and top block-offs from evaporator section. 6. Remove side panels and roof cap from evaporator section and set aside to be assembled later. 7. Apply gasket to the base channel and butyl tape to the base rail edge of the evaporator section. 8. Remove and discard shipping protection panels and top block off from outside air section. 9. Rig and set outside air section onto roof curb using the rail guides as an alignment aid. Outside air section must be within 2.0 from the evaporator section. 10. Use 0.75 x 24 threaded rod, nuts, washers and bac king plate provided to pull and secure sections together.This must be done using the lifting lugs at the unit split as shown. 11. Use 0.375 bolts, nuts and washers provided to pull and secure the roof rails together. This must be done using the brackets on the roof rails as shown. 12. Attach roof splice plate to bottom side of roof panels at the unit split with ¼ sheet metal screws. 13. Add bullwrap to electrical wiring. 14. Connect power and control wiring at the unit split. Place power wiring connectors inside junction box.
Installation RT-SVX24K-EN55 15. Apply gasket to side panels removed earlier. Attach side panel to unit split. 16. Apply 1.25 butyl tape on top of unit split along the roof seam. 17. Attach roof cap over roof seam and butyl tape with screws Figure 25. Rail guide locations Attach rail guides as shown Figure 26. Evaporator section shipping protection removal Discard shipping protection Figure 27. Evaporator section side panel and roof cap removal Save side panels and roof cap for reassembly Discard s hipping protection
Installation 56RT-SVX24K-EN Figure 28. Evaporator section gasket locations Rail guides Gasket Butyl Tape Figure 29. Outside air section shipping protection removal Discard shipping protection
Installation RT-SVX24K-EN57 Figure 30. Base rail connection Threaded rod Lifting lug Backing Plate Figure 31. Roof rail connection Brackets
Installation 58RT-SVX24K-EN Air-Cooled and Evaporative Condensers— Two-Piece Unit Fit Up 1. Rig the low side unit (Air handler) and the high side unit (Condenser) separately. 2. First, rig and set the low side unit on the roof curb (aligned with return end). 3. Take off and discard the protection boxes. (Do not remo ve wire shields). 4. Remove the rail connector splice brackets and install the brackets on the low side unit base rails. 5. Take off the side panels (these are labeled) and the top co ver of the high side unit and set aside to be assembled later. 6. Rig and set the high side unit on roof curb pedestal, using the rail splice bracket as an alignment aid to connect the Low and high side units.The Low and high side unit rails should be butted together with a maximum 2 separation. 7. Remove the left upper and lower louvered panels and the corner panels on each side to aid in tubing and wiring connections. Figure 32. Roof panel splice plate connection Figure 33. Side panel and roofcap reinstallation Apply s plice plate to bottom of roof panels at unit split Reinstall s ide panels removed earlier Reinstall roof cap removed earlier Apply butyl tape on unit split in roof Figure 34. (1) Protection box removal/(2) rail connector installation position Note: Do not remove the wiring shields (2) Note : Unscrew the rail connector as shown in fig 1(b) and screw back to these locations (1) (a) (b) Rail connector shipping position
Installation RT-SVX24K-EN59 Figure 35. (3) Side and top filler panel removal/(4) high side installation preparation Filler panel shipping position Top cover shipping position Filler panel shipping position Note: Remove the filler panels and top cover before putting the Indoor and Outdoor sections together and screw to both Indoor and Outdoor panels on each side as shown in fig (6). Finally the top cover is assembled in space. (3) Unconnected tubes (4)
Installation 60RT-SVX24K-EN Figure 36. (5) Connected tubes/(6) install panels Connected tubes (5) (6)