Page 51

Installation
RT-SVX24K-EN51
Unit Rigging and Placement
1. To configure the unit Center-of-Gravity, utilize TOPSS
or contact the local Trane sales office.
2. Attach adequate strength lifting slings to all lifting lugs.The figures beginning with Figure20, p.51show the
minimum distance between the lifting hook and the
top
 of the unit and illustrate the installation of spreader
bars to protect the unit and to facilitate a uniform lift.
Table 12, p. 44lists typical approximate minimal unit
operating weights....

Page 52

Installation
52RT-SVX24K-EN
Figure 21. Typical unit rigging—one piece unit with four
lifting lugs per side(a)
15 ft min
20 ft min
Turnbuckle or
Chain Adjustment for each lug
Figure 22. Typical unit rigging—two-piece unit with two lifting lugs per side(a)
Turnbuckle or
Chain Adjustment
for each lug 

Page 53

Installation
RT-SVX24K-EN53
Figure 23. Typical unit rigging—two-piece unit with three lifting lugs per air handler side(a)
(a) Turnbuckle or Chain Adjustment required for each lifting point
     24 ft min
Turnbuckle or
Chain Adjustment for each lug 

Page 54

Installation
54RT-SVX24K-EN
Figure 24. Typical unit rigging—three-piece unit
Air-Cooled and Evaporative Condensers—
Three-Piece Unit Fit Up
1. Rig and lift outside air section and evaporator section
separately.
2. Do not assemble unit on ground and attempt to lift toroof. Unit must be assembled on roof curb.
3. Attach rail guide provided to bottom of the evaporator base
 rails as shown with screws.
4. Rig and set the evaporator section onto the roof curb (aligned
 with supply end).
5. Remove and discard...

Page 55

Installation
RT-SVX24K-EN55
15. Apply gasket to side panels removed earlier. Attach
side panel to unit split.
16. Apply 1.25 butyl tape on top of unit split along the roof seam.
17. Attach roof cap over roof seam and butyl tape with screws
Figure 25. Rail guide locations
Attach rail guides 
as shown
Figure 26. Evaporator section shipping protection removal
Discard shipping
protection
Figure 27. Evaporator section side panel and roof cap removal
Save side  panels 
and roof cap for 
reassembly
Discard s...

Page 56

Installation
56RT-SVX24K-EN
Figure 28. Evaporator section gasket locations
Rail guides
Gasket
Butyl Tape
Figure 29. Outside air section shipping protection removal
Discard shipping
protection 

Page 57

Installation
RT-SVX24K-EN57
Figure 30. Base rail connection
Threaded rod
Lifting lug
Backing Plate
Figure 31. Roof rail connection
Brackets 

Page 58

Installation
58RT-SVX24K-EN
Air-Cooled and Evaporative Condensers—
Two-Piece Unit Fit Up
1. Rig the low side unit (Air handler) and the high side unit
(Condenser) separately.
2. First, rig and set the low side unit on the roof curb (aligned with return end). 3. Take off and discard the protection boxes. (Do not
remo
 ve wire shields).
4. Remove the rail connector splice brackets and install the
 brackets on the low side unit base rails.
5. Take off the side panels (these are labeled) and the top co
 ver...

Page 59

Installation
RT-SVX24K-EN59
Figure 35. (3) Side and top filler panel removal/(4) high side installation preparation
Filler panel 
shipping position
Top cover
shipping position Filler panel 
shipping position
Note: Remove the filler panels and top cover before putting the 
Indoor and Outdoor sections together and screw to both Indoor  and Outdoor panels on each side as shown in fig (6). Finally the top cover is assembled in space.
(3)
Unconnected tubes
(4) 

Page 60

Installation
60RT-SVX24K-EN
Figure 36. (5) Connected tubes/(6) install panels
Connected tubes
(5)
(6) 
Start reading Trane Intellipak 2 Service Manual

Related Manuals for Trane Intellipak 2 Service Manual

All Trane manuals