SATURN IIE EPABX Installation Test Procedures A30808-X5130-B120-l-8928 issue 1, May 1986 W23 EXPANSION CABINET I --- --- : ] 1 FDD : , i;wi! i-L--i-- - _-__ -- LiTJ-. - - -r----- * W22 BASIC CA&NET A5040-2.313186 Figure 2.01 Signal Cable Distribution for the SATURN IIE System (Expansion Cabinet) 2-5
SATURN IIE EPABX tnstallation Test Procedures A30808-X5130-8120-1-8928 Issue 1, May 1986 LTUSO LINE TRUNK UNIT SHELF J42 J43 r JP L Jl BASS BASIC SHELF El a---- J46 J47 E2 05039.1..wmG Figure 2.02 Power/Ground Distribution for the SATURN IIE System (Basic Cabinet) 2-6
A30808-X5130-B120-l-8920 Issue 1, May 1986 EXPANSION CABINET REF. L --M--e-- ---- -,-, ------ ----- BASIC‘CABINET REF. A5U38-1-4:3:86 Figure 2.03 Power/Ground Distribution for the SATURN IIE System (Expansion Cabinet) 2-7 (2-8 blank)
SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures issue 1. May 1986 3.01 General. The SATURN HE System must be connected to an earth ground (i.e., metallic cold water pipe or master ground busbar) in addition to the safety ground in the ac power cord. A G-gauge (twisted copper wire) conductor should be connect- ed between the grounding lug E5 located on the bottom of the cabinet frame and the snlccted earth ground (refer to Section 3.00 in the SATURN HE EPABX Installation Procedures prac- tice for details). The following tests must be performed to en- sure that proper earth ground connections have been accomplished, and that ground connections within the cabinet assembly have not been damaged or loosened during shipment. WARNiNG Hazardous voltsgos txkt within the equipment csbinef. Ee extremely ca-ej’Ll when performing t~s%i~g/l’roubiesh~oting procedures with the equipment panel(s) removed. 3.02 System Grcund Test. Before proceeding with the test’ procedures indicated in Table 3.00, check that the earth ground connections are secure and ground conductors are firmly positioned on grounding lug E5 at ihe bottom of the cabinet frame. 3.03 Shelf Ground Continuity Test. Each LTU shelf assem- bly within the cabinet assembly is grounded via two vertical busbars. Beiore proceeding with the test procedures indicat- ed in Table 3.01, check that each shelf backplane is iniercon- netted with the busbar flanges and adequately secured into position. Table 3.00 System Ground Test PROCEDURE VERlFlCATlON IF VERlFlCATION IS NOT OBTAINED .l If connected, remove ac power cord from commercial power outlet. 2 Short digital multimeter tesi leads together and noie resistance of test leads. 3 Set digital multimeter to lowest Resistance measured should be If a reading greater ihan 2 ohms is resistance range and connect its betweem 0 and 2 ohms greater than obtained, the faulty ground con- leads between the U-ground pin of the measured test lead resistance. nection must be isolated and cor- the ac power cord and the U-ground rected befora continuing wi?h the socket in the commercial power installation test procedures outlet (refer to Figure 3.00 for details). 4 Repeat procedure with second ac Same as step 3 above. Same as step 3 above. power cord if optional expansion cabinet is incorporated into system. Table 3.01 Shelf Ground Continuity Test STEP PROCEDURE VERIFICATION IF VERIFICATiON IS NOT OBTAINED 1 If connected, remove ac power cord from commercial power outlet. 2 Set digital multimeter to lowest Resistance measured should be If a reading greator than 1 ohm is resistance range and connect its between 0 and 1 ohm greater than obtained, the faulty ground connec- leads between ground lug E5 located the measured multimeter test lead tion must be corrected before con- at the bottom of the cabinet frame, resistance. tinuing the installation test pro- and one of the busbar/backplane cedures. attaching screws for each existing LTU shelf (refer to Figure 3.01) 3-l
SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1986 BASIC Cabinet GND LUG Fuse Box Facility (ES) , 5, B D Power co PSU f llOVAC~$GOi-fZ El El Neulral Ground hlatn Cabmel (Rear View) Recommended: B-gauge (iwtsted Copper Wire) conductor not exceedmg i26 feet m length. I (Ootlonall I.1 f Master Ground Busbar Earth Ground Note: Single Point Ground (SPG) configuration IS shown Figure 3.00 System Ground Test Connections 3-2
SATURN IIE EPABX Installation Test Procedures A30808-X5130-8120-1-8928 Issue 1, May 1986 Busbar/ Backplane - Attaching Screws GND Lug No. E5 ’ 7 - Recommended: 6 Guage (twisted copper wire) conductor not exceeding 126 feet in length. I(Rear View) Busbar Grounded at Fuse Box Facility I L ---_ -I Power Cord Plug 7 Master Ground Busbar Earth Ground Note: Single Point Ground (SPG) configuration is shown Figure 3.01 Shelf Ground Continuity Test Connections 3-3 (3-4 blank)
I -_ SATURN IIE EPABX installation Test Procedures A30808-X5130-BlZO-l-8928 Issue 1, May 1986 SECTION 4.00 POWER-UP TESTS 4.01 General. The SATURN IIE System makes use of dis- tributed power in the equipment cabinet. Several power sup- plies are used in the system. These power supplies provide +5Vdc, -SVdc, +12Vdc, -12Vdc, -48Vdc, 90Vac-20Hz ringing voltage and message waiting voltage, from a 11OVac 60Hz input power source. After satisfactorily performing the ground tests indicaied in Section 3.00, the following tests must be per- formed to ensure that proper power cable connections have been accomplished and that the power supplies inside the cabinet assembly have not been damaged during shipment. WARNING Hazardous voltages exist within the equipment cabinet. Be extremely careful when performing testin@roubkshootjng’ pmcedures with the equipment panel(s) removed. 4.02 Power-Up/Output Voltage Tests. Before proceeding with the test procedures indicated in Table 4.00, check that all pow- er cable assemblies are properly secured into their correspond- ing locations. Note that the test procedures in Table 4.00 include procedures for testing the optional MSM, when equipped in the system. Table 4.60 Power-Up/Output Voltage Test YiEP PROCEDtJRE f not previously done, extract each ‘CB in the system from its respec- ive backplane connector in basic md LTU shelves. Check that all circuit breakers on the ‘SU are in the off positions and that 311 fuses are inserted in their cor- ,esponding locations. Jsing the digital multimeter (or an 3c polarity indicator), verify that the :ommercial ac power receptacle Jsed for powering the systsm has the Iroper polarity. Connect the ac power cord(s) to the zommercial ac power receptacle(s). ?lace the following circuit breakers on the PSU to the on (up) position: a) Basic PS b) -48PSO c) -48PSl (if equipped) d) LTUPSO (if equipped) e) LTUPSl (if equipped) 9 LTUPS2 (if equipped) If the optional MSM module is equipped in the system, proceed 2s follows: 2) If not previously done, connect and insert battery pack into the MSM assembly. b)Press the BATTERY TEST switch on the PSU and release after verification has been obtained. VERIFICATION ‘olarity indication must coincide with =igures 3.00 and 3.01. The associated green LED should light steadily. IF VERIFICATION IS NOT 08TAlNED if polarity indication does not coin- cide, correct before proceeding with the remainder of test in this lable. If the green LED remains cxtin- guished, the battery pack is below acceptable voltage limits. Let MSM charge battery pack and retry test af- ter 30 minutes have elapsed. If green LED remains extinguished, the bat- tery pack is defective and requires replacement. ‘l-1
SATURN IlE EPABX Installation Test Procedures A30808-X5130-8120-1-8928 issue 1, May 1986 Table 4.00 Power-Up/Output Voltage Test (Continued) SE? PROCEDURE VEfiIFICATION IF VERIFICATION IS NOT OBTAINED c) On the PSU, place the circuit The red LED designated BATTERY If the red LED remains extinguished, breaker designated BASIC PS TEST.should be steadily lit. replace the MSM. in the off (down) position. The red BATTERY TEST LED should 1 d) On the PSU, place the circuit If the red LED remains steadily lit, breaker designated BASIC PS be extinguished. either the cabinet ac power cord is to the on (up) position. not connected to the commercial ac power receptacle or a local ac pow- er failure has occurred. 7 Set digital multimeter to appropriate NOTE dc voltage scale for the following If further troubleshooting information tests. is required during these testing procedures, refer to SATURN IIE EPABX Maintenance and Troubleshooting Practice. 8A To measure the unloaded basic shelf input voltages, proceed as follows: a) On basic backplane shown in Voltage measured should read be- If reading is not within tolerance, ad- Figure 4.00, take reading be- tween +4.5 and +5.5 Vdc. just +5V ADJUST potentiometer on tween terminal El, E2, E3 or PSU. If still out-of-tolerance replace E4 and ground. PSU. b) On basic backplane connector Voltage measured should read bo- If reading is not within to!erance, J46, shown in Figure 4.00, take tween -43 and -53Vdc. check the -48P-BASIC fuse in PSU. readings beiween pins 2 and 3. If fuse is good, replace -48PSO. c) Set digital multimeter to ap- Voltage measured should be be- If the voltage is not present, check propriate Vat scale and take tween 75 and 100 Vat. and replace RGEN fuse or RAC BAS- reading between pins 1 and 2 IC fuse on PSU. If fuses are good, of J46. replace RGEN PCB. If voltage still not present, replace PSU. d) Set digital multimeter to appropri- ate Vdc scale and take readings between the following pins on basic backplane connector J47 (shown in Figure 4.00): 1) Pins 1 and 3. 2) Pins 2 and 3. Voltage measured should be be- If reading is not within tolerance, tween -4.9 and -5.2Vdc replace the PSU. Voltage measured should be be- If reading is not within tolerance, tween -43 and -53Vdc check the -488 BASIC fuse on PSU. If the fuse is good, replace -48PS0. e) On basic backplane connector J48, shown in Figure 4.00, take readings between the following pins: 1) Pins 1 and 4. 2) Pin 2 or 3 and pin 4. 3) Pins 4 and 5. Voltage measured should read be- If reading is not within tolerance, tween -11.3 and -12.7Vdc. replace the PSU. Voltage measured should be be- If reading is not within tolerance, tween +11.3 and +12.7Vdc. replace the PSU. Voltage measured should be be- If reading is not within tolerance, tween 4.85 and 5.15Vdc. check that J16 on the rear panel of the PSU is strapped to the MSM ter- minal. If the strap is in place, replace the MSM.
I - SATURN IIE EPABX Installation Test Procedures A3G808-X5130-B120-1-B928 Issue 1, May 1986 lbb!c 4.00 Power-Up/Output Voltage Test (Continued) STEP FROCEDUEE VERIFICATION IF VERIFICATION IS NOT OBTAINED . f) Connect positive lead of digital Voltage measured should read + If reading is not 0.05 Vdc, adjust +5V multimeter to pin 5 of connec- 0.05Vdc. ADJUST potentiometer on PSU. If tor J48 and negative lead to adjustment is not effective, replace terminal El on basic back- PSU. plane. (Refer to Figure 4.00.) 813 After satisfactorily completing step 8A, proceed as follows to measure the loaded basic shelf input voltages. a) On the PSU, place the circuit The MSM red LED designated BAT- breaker designa?ed BASIC PS TERY TEST should be steadily lit. in the off (down) position. b) Plug all previously extracted PCBs on the basic shelf into their respective backplane connectors. c) On the PSU, place the circuit The MSM red LED designated BAT- breaker designated BASIC PS TERY TEST should be extinguished. in the on (up) position. d) Repeat measuring procedures Same verification as in steps 8A a) on basic backplane connectors through e), except that -t-S!/& at ter- J46, J47, J48 and terminals minal El should read between 4.85 El-E4 as indicated in step 8A. and 5.15Vdc under load. 9A To measure the unloaded LTU shelf input voltages (if applicable), proceed as follows: a) On the LTU backplane con- nector J42,shown in Figure 4.01,take a reading between the following pins: 1) Pins 1 and 3. Voltage measured should be be- If reading is not within to!e:ance, ad- tween +4.5 and +5.5Vdc. just +5V ADJUST potentiometer on LTUPS. If the adjustment does not bring voltage into tolerance,replace LTUPS. 2) Pins 3 and 5. 3) Pins 3 and 4. Voltages measured should be be- If reading is not within tolerance, tween -4.9 and -5.2Vdc. replace appropriate LTUPS. Voltage measured should be be- If reading does not coincide with tween -43 and -53Vdc. verification reading, check the -48P LTU fuse on PSU. If fuse is good, replace -48PS0. 4) Set digital multimeter to read Vat and connect be- tween pins 2 and 3. Voltage measured should be be- If voltage is not present, tween 75 and 1OOVac. check/replace RGEN fuse or RAC LTUO fuse on PSU. If fuses are good, replace PSU. b) Set digital multimeter to ap- propriate Vdc scale. C) On LTU backplane connector J43,shown in Figure 4.01, take a reading between the follow- ing pins: 4-3
SATURN IIE EPABX Installation Test Procedures A30808-X5130-B120-l-6928 Issue 1, May 1986 Table 4.00 Power-Up/Output Voliagc? Test (Continued) STEP PROCEDURE VEFllFlCATlON IF VERIFICATION IS NOT OBTAINED 1) Pins 1 and 3. Voltage measured should read be- If reading is not within tolerance, ad- tween +4.5 and +5.5Vdc. just +5V ADJUST potentiometer on LTUPSO. If adjustment does not bring the voltage into tolerance, replace LTUPSO. 2) Pins 1 and 2. Voltage measured should read be- If reading is not within tolerance, tween -43 and -53Vdc. replace -48PS0. If voltage not present, check -488 LTUO fuse on PSU. If fuse is good, replace 48PS0. 3) Pins 1 and 4. Voltage measured should read be- If reading is not within tolerance, tween +11.3 and +12,7Vdc. replace LTUPSO. 4) Pins 1 and 5. Voltage measured should read be- If reading is not within tolerance, -. ttieen -11.3 and -12.7Vdc. replace LTUPSO. d) On LTU backplane connector Voltage measured should read be- If reading is not within tolerance, J44 shown in Figure 4.01, take tween +4.5 and +55Vdc. check +5V cabling between be- a reading between pins 1 and tween basic shelf and LTU 2 or pins 1 and 3. 98 Repeat steps 9A a) through d) for ex- pansion cabinet LTU shelf voltages (if applicable) substituting -48PSl for 48Vdc power supply and appropriate LTUPS. 9C After satisfactorily completing steps 9A and 96, proceed 2s follows to measure the loaded LTU shelf input voltages: a) On the PSU, place the circuit breakers designated LTUPSO,LTUPSl,and LTUPS2 in the off (down) positions. b) Plug all previously extracted PCBs on the LTU shelves into their respective backplane connectors. c) On the PSU, place the circuit breakers designated LTUPSO, LTUPSl, and LTUPS2 in the on (up) positions. d) Repeat measurements on LTU Voltages measured should be within backplane connectors J42, same tolerances except +5Vdc sup- J43, and J44 per step 9A. ply should read between 4.85 and 5.15 Vdc. 4-4