    							SATURN IIE EPABX 
    Installation Test Procedures A30808-X5130-B120-l-8928 
    issue 1, May 1986 
    W23 EXPANSION CABINET 
     
    I 
    --- --- 
    : ] 1 
    FDD : 
    , i;wi! 
    i-L--i-- - _-__ 
    -- 
    LiTJ-. - - 
    -r----- * 
    W22 
    BASIC CA&NET 
    A5040-2.313186 
    Figure 2.01 Signal Cable Distribution for the SATURN IIE System (Expansion Cabinet) 
    2-5  
    						
    							SATURN IIE EPABX 
    tnstallation Test Procedures A30808-X5130-8120-1-8928 
    Issue 1, May 1986 
    LTUSO 
    LINE TRUNK UNIT SHELF J42 
    J43 r JP 
    L 
    Jl 
    BASS 
    BASIC SHELF El a---- 
    J46 
    J47 
    E2 
    05039.1..wmG 
    Figure 2.02 Power/Ground Distribution for the SATURN IIE System (Basic Cabinet) 
    2-6  
    						
    							A30808-X5130-B120-l-8920 
    Issue 1, May 1986 
    EXPANSION CABINET REF. 
    L --M--e-- ---- -,-, 
    ------ 
    ----- 
    BASIC‘CABINET REF. 
    A5U38-1-4:3:86 Figure 2.03 Power/Ground Distribution for the SATURN IIE System (Expansion Cabinet) 
    2-7 (2-8 blank)  
    						
    							SATURN IIE EPABX A30808-X5130-B120-l-8928 
    Installation Test Procedures 
    issue 1. May 1986 
    3.01 General. The SATURN HE System must be connected 
    to an earth ground (i.e., metallic cold water pipe or master ground 
    busbar) in addition to the safety ground in the ac power cord. 
    A G-gauge (twisted copper wire) conductor should be connect- 
    ed between the grounding lug E5 located on the bottom of the 
    cabinet frame and the snlccted earth ground (refer to Section 
    3.00 in the SATURN HE EPABX Installation Procedures prac- 
    tice for details). The following tests must be performed to en- 
    sure that proper earth ground connections have been 
    accomplished, and that ground connections within the cabinet 
    assembly have not been damaged or loosened during shipment. 
    WARNiNG 
    Hazardous voltsgos txkt within the equipment csbinef. Ee extremely ca-ej’Ll when performing t~s%i~g/l’roubiesh~oting 
    procedures with the equipment panel(s) removed. 
    3.02 System Grcund Test. Before proceeding with the test’ 
    procedures indicated in Table 3.00, check that the earth 
    ground connections are secure and ground conductors are 
    firmly positioned on grounding lug E5 at ihe bottom of the 
    cabinet frame. 
    3.03 Shelf Ground Continuity Test. Each LTU shelf assem- 
    bly within the cabinet assembly is grounded via two vertical 
    busbars. Beiore proceeding with the test procedures indicat- 
    ed in Table 3.01, check that each shelf backplane is iniercon- 
    netted with the busbar flanges and adequately secured into 
    position. 
    Table 3.00 System Ground Test 
    PROCEDURE VERlFlCATlON IF VERlFlCATION 
    IS NOT OBTAINED 
    .l 
    If connected, remove ac power cord 
    from commercial power outlet. 
    2 
    Short digital multimeter 
    tesi leads 
    together and noie resistance of test 
    leads. 
    3 
    Set digital multimeter to lowest Resistance measured should be If a reading greater ihan 2 ohms is 
    resistance range and connect its betweem 0 and 2 ohms greater than obtained, the faulty ground con- 
    leads between the U-ground pin of the measured test lead resistance. nection must be isolated and cor- 
    the ac power cord and the U-ground rected befora continuing wi?h the 
    socket in the commercial power installation test procedures 
    outlet (refer to Figure 3.00 for details). 
    4 
    Repeat procedure with second ac Same as step 3 above. Same as step 3 above. 
    power cord if optional expansion 
    cabinet is incorporated into system. 
    Table 3.01 Shelf Ground Continuity Test 
    STEP 
    PROCEDURE VERIFICATION IF VERIFICATiON 
    IS NOT OBTAINED 
    1 
    If connected, remove ac power cord 
    from commercial power outlet. 
    2 
    Set digital multimeter to lowest Resistance measured should be If a reading greator than 1 ohm is 
    resistance range and connect its between 0 and 1 ohm greater than obtained, the faulty ground connec- 
    leads between ground lug E5 located the measured multimeter test lead tion must be corrected before con- 
    at the bottom of the cabinet frame, resistance. tinuing the installation test pro- 
    and one of the busbar/backplane cedures. 
    attaching screws for each existing 
    LTU shelf (refer to Figure 3.01) 
    3-l  
    						
    							SATURN IIE EPABX A30808-X5130-B120-l-8928 
    Installation Test Procedures Issue 1, May 1986 
    BASIC Cabinet 
    GND 
    LUG Fuse Box Facility 
    (ES) , 
    5, B D Power co 
    PSU 
    f llOVAC~$GOi-fZ 
    El El Neulral 
    Ground 
    hlatn Cabmel 
    (Rear View) 
    Recommended: B-gauge 
    (iwtsted Copper Wire) 
    conductor not exceedmg 
    i26 feet m length. 
    I (Ootlonall 
    I.1 
    f Master Ground Busbar 
    Earth Ground Note: Single Point Ground (SPG) configuration IS shown 
    Figure 3.00 System Ground Test Connections 
    3-2  
    						
    							SATURN IIE EPABX 
    Installation Test Procedures A30808-X5130-8120-1-8928 
    Issue 1, May 1986 
    Busbar/ 
    Backplane 
    - 
    Attaching 
    Screws 
    GND 
    Lug 
    No. E5 ’ 
    7 
    - 
    Recommended: 6 Guage 
    (twisted copper wire) conductor 
    not exceeding 126 feet in length. I(Rear View) Busbar Grounded at 
    Fuse Box Facility 
     I 
    L 
    ---_ -I 
    Power 
    Cord Plug 
    7 Master Ground Busbar 
    Earth Ground 
    Note: Single Point Ground (SPG) configuration is shown 
    Figure 3.01 Shelf Ground Continuity Test Connections 
    3-3 (3-4 blank)  
    						
    							I 
    -_ 
    SATURN IIE EPABX 
    installation Test Procedures A30808-X5130-BlZO-l-8928 
    Issue 1, May 1986 
    SECTION 4.00 POWER-UP TESTS 
    4.01 General. The SATURN IIE System makes use of dis- 
    tributed power in the equipment cabinet. Several power sup- 
    plies are used in the system. These power supplies provide 
    +5Vdc, -SVdc, +12Vdc, -12Vdc, -48Vdc, 90Vac-20Hz ringing 
    voltage and message waiting voltage, from a 11OVac 60Hz 
    input power source. After satisfactorily performing the ground 
    tests indicaied in Section 3.00, the following 
    tests must be per- 
    formed to ensure that proper power cable connections have 
    been accomplished and that the power supplies inside the 
    cabinet assembly have not been damaged during shipment. WARNING 
    Hazardous voltages exist within the equipment cabinet. Be 
    extremely careful when performing testin@roubkshootjng’ 
    pmcedures with the equipment panel(s) removed. 
    4.02 Power-Up/Output Voltage Tests. Before proceeding with 
    the test procedures indicated in Table 4.00, check that all pow- 
    er cable assemblies are properly secured into their correspond- 
    ing locations. Note that the test procedures in Table 4.00 include 
    procedures for testing the optional MSM, when equipped in the 
    system. 
    Table 4.60 Power-Up/Output Voltage Test 
    YiEP PROCEDtJRE 
    f not previously done, extract each 
    ‘CB in the system from its respec- 
    ive backplane connector in basic 
    md LTU shelves. 
    Check that 
    all circuit breakers on the 
    ‘SU are in the off positions and that 
    311 fuses are inserted in their cor- 
    ,esponding locations. 
    Jsing the digital multimeter (or an 
    3c polarity indicator), verify that the 
    :ommercial ac power receptacle 
    Jsed for powering the systsm has the 
    Iroper polarity. 
    Connect the 
    ac power cord(s) to the 
    zommercial ac power receptacle(s). 
    ?lace the following circuit breakers 
    on the PSU to the on (up) position: 
    a) Basic PS 
    b) -48PSO 
    c) -48PSl (if equipped) 
    d) LTUPSO (if equipped) 
    e) LTUPSl (if equipped) 
    9 LTUPS2 (if equipped) 
    If the optional MSM module is 
    equipped in the system, proceed 
    2s follows: 
    2) If not previously done, connect 
    and insert battery pack into 
    the MSM assembly. 
    b)Press the BATTERY TEST 
    switch on the PSU and 
    release after verification has 
    been obtained. VERIFICATION 
    ‘olarity indication must coincide with 
    =igures 3.00 and 3.01. 
    The associated green LED should 
    light steadily. IF VERIFICATION 
    IS NOT 08TAlNED 
    if polarity indication does not coin- 
    cide, correct before proceeding with 
    the remainder of test in this lable. 
    If the green LED remains cxtin- 
    guished, the battery pack is below 
    acceptable voltage limits. Let MSM 
    charge battery pack and retry test af- 
    ter 30 minutes have elapsed. If green 
    LED remains extinguished, the bat- 
    tery pack is defective and requires 
    replacement. 
    ‘l-1  
    						
    							SATURN IlE EPABX 
    Installation Test Procedures A30808-X5130-8120-1-8928 
    issue 1, May 1986 
    Table 4.00 Power-Up/Output Voltage 
    Test (Continued) 
    SE? 
    PROCEDURE VEfiIFICATION IF VERIFICATION 
    IS NOT OBTAINED 
    c) On the PSU, place the circuit The red LED designated BATTERY If the red LED remains extinguished, 
    breaker designated BASIC PS TEST.should be steadily lit. replace the MSM. 
    in the off (down) position. 
    The red BATTERY TEST LED should 
    1 d) On the PSU, place the circuit If the red LED remains steadily lit, 
    breaker designated BASIC PS be extinguished. either the cabinet ac power cord is 
    to the on (up) position. not connected to the commercial ac 
    power receptacle or a local ac pow- 
    er failure has occurred. 
    7 Set digital multimeter to appropriate NOTE 
    dc voltage scale for the following If further troubleshooting information 
    tests. 
    is required during these testing 
    procedures, refer to SATURN IIE 
    EPABX Maintenance and 
    Troubleshooting Practice. 
    8A To measure the unloaded basic shelf 
    input voltages, proceed as follows: 
    a) On basic backplane shown in Voltage measured should read be- 
    If reading is not within tolerance, ad- 
    Figure 4.00, take reading be- tween +4.5 and +5.5 Vdc. just +5V ADJUST potentiometer on 
    tween terminal El, E2, E3 or PSU. If still out-of-tolerance replace 
    E4 and ground. PSU. 
    b) On basic backplane connector Voltage measured should read bo- If reading is not within to!erance, 
    J46, shown in Figure 4.00, take tween -43 and -53Vdc. 
    check the -48P-BASIC fuse in PSU. 
    readings beiween pins 2 and 3. If fuse is good, replace -48PSO. 
    c) Set digital multimeter to ap- Voltage measured should be be- If the voltage is not present, check 
    propriate Vat scale and take tween 75 and 100 Vat. 
    and replace RGEN fuse or RAC BAS- 
    reading between pins 1 and 2 IC fuse on PSU. If fuses are good, 
    of J46. replace RGEN PCB. If voltage still not 
    present, replace PSU. 
    d) Set digital multimeter to appropri- 
    ate Vdc scale and take readings 
    between the following pins on 
    basic backplane connector J47 
    (shown in Figure 4.00): 
    1) Pins 1 and 3. 
    2) Pins 2 and 3. Voltage measured should be be- If reading is not within tolerance, 
    tween -4.9 and -5.2Vdc replace the PSU. 
    Voltage measured should be be- If reading is not within tolerance, 
    tween -43 and -53Vdc check the -488 BASIC fuse on PSU. 
    If the fuse is good, replace -48PS0. 
    e) On basic backplane connector 
    J48, shown in Figure 4.00, take 
    readings between the following 
    pins: 
    1) Pins 1 and 4. 
    2) Pin 2 or 3 and pin 4. 
    3) Pins 4 and 5. Voltage measured should read be- If reading is not within tolerance, 
    tween -11.3 and -12.7Vdc. replace the PSU. 
    Voltage measured should be be- If reading is not within tolerance, 
    tween +11.3 and +12.7Vdc. replace the PSU. 
    Voltage measured should be be- If reading is not within tolerance, 
    tween 4.85 and 5.15Vdc. check that J16 on the rear panel of 
    the PSU is strapped to the MSM ter- 
    minal. If the strap is in place, replace 
    the MSM.  
    						
    							I 
    - 
    SATURN IIE EPABX 
    Installation Test Procedures A3G808-X5130-B120-1-B928 
    Issue 1, May 1986 
    lbb!c 4.00 Power-Up/Output Voltage Test (Continued) 
    STEP FROCEDUEE VERIFICATION IF VERIFICATION 
    IS NOT OBTAINED . 
    f) Connect positive lead of digital Voltage measured should read + If reading is not 0.05 Vdc, adjust +5V 
    multimeter to pin 5 of connec- 0.05Vdc. ADJUST potentiometer on PSU. If 
    tor J48 and negative lead to adjustment is not effective, replace 
    terminal El on basic back- PSU. 
    plane. (Refer to Figure 4.00.) 
    813 After satisfactorily completing step 
    8A, proceed as follows to measure 
    the loaded basic shelf input voltages. 
    a) On the PSU, place the circuit The MSM red LED designated BAT- 
    breaker designa?ed BASIC PS TERY TEST should be steadily lit. 
    in the off (down) position. 
    b) Plug all previously extracted 
    PCBs on the basic shelf into 
    their respective backplane 
    connectors. 
    c) On the PSU, place the circuit The MSM red LED designated BAT- 
    breaker designated BASIC PS TERY TEST should be extinguished. 
    in the on (up) position. 
    d) Repeat measuring procedures Same verification as in steps 8A a) 
    on basic backplane connectors through e), except that -t-S!/& at ter- 
    J46, J47, J48 and terminals minal El should read between 4.85 
    El-E4 as indicated in step 8A. and 5.15Vdc under load. 
    9A To measure the unloaded LTU shelf 
    input voltages (if applicable), proceed 
    as follows: 
    a) On the LTU backplane con- 
    nector J42,shown in Figure 
    4.01,take a reading between 
    the following pins: 
    1) Pins 1 and 3. Voltage measured should be be- If reading is not within to!e:ance, ad- 
    tween +4.5 and +5.5Vdc. just +5V ADJUST potentiometer on 
    LTUPS. If the adjustment does not 
    bring voltage into tolerance,replace 
    LTUPS. 
    2) Pins 3 and 5. 
    3) Pins 3 and 4. Voltages measured should be be- If reading is not within tolerance, 
    tween -4.9 and -5.2Vdc. replace appropriate LTUPS. 
    Voltage measured should be be- If reading does not coincide with 
    tween -43 and -53Vdc. verification reading, check the -48P 
    LTU fuse on PSU. If fuse is good, 
    replace -48PS0. 
    4) Set digital multimeter to 
    read Vat and connect be- 
    tween pins 2 and 3. Voltage measured should be be- If voltage is not present, 
    tween 75 and 1OOVac. check/replace RGEN fuse or RAC 
    LTUO fuse on PSU. If fuses are good, 
    replace PSU. 
    b) Set digital multimeter to ap- 
    propriate Vdc scale. 
    C) On LTU backplane connector 
    J43,shown in Figure 4.01, take 
    a reading between the follow- 
    ing pins: 
    4-3  
    						
    							SATURN IIE EPABX 
    Installation Test Procedures A30808-X5130-B120-l-6928 
    Issue 1, May 1986 
    Table 4.00 Power-Up/Output Voliagc? Test (Continued) 
    STEP PROCEDURE VEFllFlCATlON IF VERIFICATION 
    IS NOT OBTAINED 
    1) Pins 1 and 3. Voltage measured should read be- If reading is not within tolerance, ad- 
    tween +4.5 and +5.5Vdc. just +5V ADJUST potentiometer on 
    LTUPSO. If adjustment does not bring 
    the voltage into tolerance, replace 
    LTUPSO. 
    2) Pins 1 and 2. Voltage measured should read be- If reading is not within tolerance, 
    tween -43 and -53Vdc. replace -48PS0. If voltage not 
    present, check -488 LTUO fuse on 
    PSU. If fuse is good, replace 48PS0. 
    3) Pins 1 and 4. 
    Voltage measured should read be- If reading is not within tolerance, 
    tween +11.3 and +12,7Vdc. replace LTUPSO. 
    4) Pins 1 and 5. Voltage measured should read be- If reading is not within tolerance, 
    -. ttieen -11.3 and -12.7Vdc. replace LTUPSO. 
    d) On LTU backplane connector Voltage measured should read be- If reading is not within tolerance, 
    J44 shown in Figure 4.01, take tween +4.5 and +55Vdc. check +5V cabling between be- 
    a reading between pins 1 and tween basic shelf and LTU 
    2 or pins 1 and 3. 
    98 Repeat steps 9A a) through d) for ex- 
    pansion cabinet LTU shelf voltages 
    (if applicable) substituting -48PSl for 
    48Vdc power supply and appropriate 
    LTUPS. 
    9C After satisfactorily completing steps 
    9A and 96, proceed 
    2s follows to 
    measure the loaded LTU shelf input 
    voltages: 
    a) On the PSU, place the circuit 
    breakers designated 
    LTUPSO,LTUPSl,and LTUPS2 
    in the off (down) positions. 
    b) Plug all previously extracted 
    PCBs on the LTU shelves into 
    their respective backplane 
    connectors. 
    c) On the PSU, place the circuit 
    breakers designated LTUPSO, 
    LTUPSl, and LTUPS2 in the 
    on (up) positions. 
    d) Repeat measurements on LTU Voltages measured should be within 
    backplane connectors J42, same tolerances except +5Vdc sup- 
    J43, and J44 per step 9A. ply should read between 4.85 and 
    5.15 Vdc. 
    4-4  
    						