Siemens Saturn Iie Epabx General Description Manual
Have a look at the manual Siemens Saturn Iie Epabx General Description Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 428 Siemens manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
I - SATURN IIE EPABX A30808-X5130-BllO-l-8928 Installation Procedures Issue 1, May 1986 BASIC SHELF LTU SHELF Figure 5.00 Backplane Connectors 5-2
I - SATURN HE EPABX Installation Procedures A30808-X5130-BllO-l-8928 Issue 1, May 1986 ci f Table 5.0 Signal and Power/Ground CABLE TYPE abling Reference List (Basic Cabinet) , TERMINATION POINTS I I (B) ZONNECTOR EQUIPMENT CONNECTOR (, EQUIPMENT CABLE REF. NO. FIGURE REF. NO. POWER/ GROUND SIGNAL Wl 5.01 X PSU basic J61 ! PSU ! J12 J56 LTUl J46 J63 FDDO basic LTUl 2nd AC W8 GRD E8 J14 GRD E7 FDDO PSU basic X FDD3 J55 LTUl J45 J63 FDDl basic basic w14 X W18 X FDD2 w19 . GRD E8 E2 GRD El 5.01 X PSU Table 5.01 Signal and Power/Ground Cabling Reference List (Expansion Cabinet) I CABLE TYPE I TERMINATION POINTS I POWER/ SIGNAL GROUND --I-- X (A) I (B) I CABLE FIGURE REF. NO. REF. NO. W6 5.02 EQUIPMENT CONNECTOR EQUIPMENT CONNECTOR PSU J5,JB LTUPSl Jl,J2 LTUPS2 Jl,J2 LTUPSl Jl LTUP J42-J43 basic J60 LTU2 J46 5.02 X 5.04 X 5.04 X 5.04 X basic basic J58 LTU2 J45 J59 LTU3 J46 -2z-p-k basic LTUPS2 J57 LTUB J45 Jl LTUB J42-J43 5-3
- SATURN IIE EPABX Installation Procedures A30808-X5130-BllO-l-8928 Issue 1, May 1986 BSK39.1.41186 -. --- - .^ . -. .- - rlgure s.ul rowemurouna Dlstrlbution (Basic Cabinet) 5-4
I I - SATURN IIE EPABX A30808-X5130-BllO-l-8928 Installation Procedures Issue 1, May 1986 EXPANSION CABINET REF. L I ? . LTUS 2 BASIC CABINET REF. Figure 5.02 Power/Ground Distribution (Expansion Cabinet) 5-5
I - SATURN IIE EPABX A30808-X5130-BllO-l-B928 installation Procedures issue 1, May 1986 w3 w13 / 1 / / I , / / LTUS 0 J47 J45 BASS J56 563 J55 J61 w4 w14 3 d I w2 ! Wll 4-f NV14 TO BE -1 ti LII DELETED IF FDD2 IS USED) l.MJ u.l 2 1 0 FDD ? I I , PSU Figure 5.03 Signal Cable Distribution (Basic Cabinet) 5-6
I - SATURN IIE EPABX Installation Procedures A30808-X5130-BllO-l-8928 Issue 1, May 1986 ., EXPANSION CABINET L,rJp. - - -T-------- + BASIC CA&NET Figure 5.04 Signal Cable Distribution (Expansion Cabinet) 5-7 (5-8 blank)
- SATURN IIE EPABX A30808-X5130-8110-l-8928 installation Procedures issue 1, May 1988 SECTION 6.00 MDF CABLING AND TERMINATING ARRANGEMENTS 8.01 General. This section provides the MDF cabling proce- dures and termination arrangements for the SATURN IIE System. 6.02 MDF Cabling. MDF cabling for the SATURN IIE Sys- tem can be accomplished through either the top or bottom of the cabinet (refer to Figures 6.00 and 8.01). The tie-wrap holders at the top and bottom of the cabinet provide the means to easilv form and secure MDF cables into oosition. Each MDF cable connector (system side) should contain a 180° hood (refer to Figure 6.02) to connect into the backplane connec- tor and secured via two captive-type screws. Figure 6.03 pro- vides an overview of the backplane MDF cable connectors and their corresponding card slot allocations on the basic and LTU shelves. Figure 8.04 provides information pertaining to connector/pin numbers for tip/ring and E&M leads. 6.03 MDF Terminating Arrangements. Tables 6.00 through 6.14 provide the necessary information on the terminating ar- rangement at the MDF. Tables 6.00 through 6.06 provides the MDF designations for the T&R leads for the basic shelf . Ta- bles 6.07 through 6.14 provides the MDF designations for the T&R leads for the expansion shelves. For information on MDF cross-connections, refer to SATURN IIE EPABX Installation Test Procedures Practice. 6-1
I - SATURN IIE EPABX A30808-X5130-BllO-l-8928 Installation Procedures Issue 1, May 1986 Rear View 14993.1.4ll7166 Figure 6.00 MDF Cabling via Top of Cabinet Assembly (View of Typical Cabinet) 6-2
I - I - SATURN IIE EPABX A30808-X5130-6110-1-8928 installation Procedures Issue 1, May 1986 Lacil ig Bar I I II O’ II II ‘. II II II II I I Tie-Wrap Holders Figure 6.01 MDF Cabling via Bottom of Cabinet Assembly (View of Typical Cabinet) 6-3
- - SATURN HE EPABX A30808-X5130-8110-l-8928 Installation Procedures Issue 1, May 1966 Caoth re SC Plug AMP N-o. 229940-l C.4976.1.Y26/66 Figure 6.02 Required MDF Cable Connector 6-4