NEC Neax2000 Ivs Small Platform System Manual
Have a look at the manual NEC Neax2000 Ivs Small Platform System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
ND-46551 (E) CHAPTER 3 Page 39 Revision 2.0 NAP-200-003 Sheet 9/21 Installation of Main Equipment 3. 19-INCH RACK-MOUNTING INSTALLATION (1) Before mounting the PIM, connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM. The AC CORD-A-U is pre-installed with the BOTTOM COVER. Figure 003-8 Connecting the Covers and AC CORD to the PIM TOP COVER TO PZ-PW86 PIM AC CORD-A-U BOTTOM COVER LOCAL CABLE DUCT
CHAPTER 3 ND -4 6551 ( E) NAP-2 00-0 03 B C A \ \ \ B C FR ONT PIM
ND-46551 (E) CHAPTER 3 Page 41 Revision 2.0 NAP-200-003 Sheet 11/21 Installation of Main Equipment 4. DESK TOP INSTALLATION (1) Connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM. The AC CORD-A-U is pre-installed with the BOTTOM COVER. Figure 003-10 Connecting the Covers and AC CORD to the PIM TOP COVER TO PZ-PW86 PIM AC CORD-A-U BOTTOM COVER LOCAL CABLE DUCT
CHAPTER 3 ND-46551 (E) Pag e 4 2 Revision 2.0 NAP-200-003 Sheet 12/21 Installation of Main Equipment (2) Connect the RUBBER FOOT to the PIM. Figure 003-11 Connecting the RUBBER FOOT to the PIM PUSHPIN RUBBER FOOT BOTTOMPIM
ND-46551 (E) CHAPTER 3 Page 43 Revision 2.0 NAP-200-003 Sheet 13/21 Installation of Main Equipment 5. AC POWER CABLING (1) The cable connections on the PZ-PW86 card are shown below. Figure 003-12 Cable Connection on the PZ-PW86 PZ-PW86 MJ MN ON BATTERY MODE SWITCH GND Note 2 FG -27V PWR CNT CA-A PWR CA-A BATTERY CABLE/PWR CA-A TO PWR 1 TO OT HER AC C ORD -A TO AC MAINS INPUT TO POWER OUTPUT POWER OUTPUT TO PWR0A CONNECTOR TO PWR0B CONNECTOR CABLE (+5V, -27V,E) CABLE (CR, E) CONNECTOR PZ-PW86 TO AUXILIARY BATTERY CONNECTOR (BATT2) ON OFF 100/120V 240V EQUIPMENT TO BATTERY OR OTHER PZ-PW86 GREEN WHITE BLACK AC C ORD -BOR TO THE TERMINAL BLOCK AT BASEFRAME GROUND TERMINAL ON THE CHASSIS CAUTION:Set the appropriate voltage before turning on the SW switch. Note 1:Follow the Label on the front plate of the PZ- PW86(C). Note 2:If GND (Signal GND) has to be separated from FG (Frame GND), remove the link between GND and FG terminals. – O BATTERY CONNECTOR (BATT1) 1 2ON L NNOMINAL AC INPUT TO TERMINAL MARKED: ON BASE TO PWR0D CONNECTOR POWER OUTPUT CABLE (+80V, E) Note 1 • PZ-PW86(C)
CHAPTER 3 ND -4 6551 ( E) NAP-2 00-0 03 PZ- PW 86(D) PW R CNT C A-A AC CORD-B TO THE TER MINAL B LOCK AT BASE N ote 1 :Follo w th e La bel on F ro n t P lat e o f P Z- 1 TE R M INAL O N THE TO P WR0D CONNEC TOR P O WER OUTPUT CAB LE (+ 90 V,E) T O B ATTE R Y O R BAT TE RY CAB LE/ PWR CA-A CHAS SIS (F O R 1-PIM S Y STE MS) L • P Z-P W86 (D) CAU TION :Set the ap p ro p ria te volt-
ND-46551 (E) CHAPTER 3 Page 45 Revision 2.0 NAP-200-003 Sheet 15/21 Installation of Main Equipment (2) Confirm the connection of the PWR CNT CA-A and power output cables (These cables are pre-installed). Figure 003-13 Cable Connection between the PZ-PW86 and the BWB LTC CONNECTOR AREA PIM BWB (Back Wiring Board)PZ-PW86 PWR0BPWR0APWR1 POWER OUTPUTPOWER OUTPUT CARD SLOT AREA PWR0C PWR0D PWR CNT CA-A CABLE (+5V, -27V, E) CABLE (CR, E) POWER OUTPUT CABLE (+80 V, E) FOR MESSAGE WAITING
CHAPTER 3 ND -4 6551 ( E) NAP-2 00-0 03 TO GROUND TERMINAL FR ONT 3P AC PO WER CA BLE PIM AC CORD-B
ND-46551 (E) CHAPTER 3 Page 47 Revision 2.0 NAP-200-003 Sheet 17/21 Installation of Main Equipment (b) Secure the AC CORD-B cables to the FG, NEUTRAL and LINE terminals. The 3P AC Power Cable and the FG Cable are pre-installed with the BASE. Figure 003-15 Screwing the AC CORD-B to the Terminals FG NEUTRAL LINE BASE 3P AC POWER CABLE TO 120/240 V AC SOURCE POWER AC POWER KNOCK OUT HOLE (PROVIDED WITH BASE) FG CABLE (PROVIDED WITH BASE) PIMAC CORD-B PUSH PULL: INSERT THE AC CORD : FIXED THE AC CORD CORD BUSH (PROVIDED WITH BASE) SUPPLEMENTARY GROUND (TO COLD WATER PIPE, ETC.) TO PZ-PW86 IN PIM (PROVIDED WITH PIM)
CHAPTER 3 ND-46551 (E) Pag e 4 8 Revision 2.0 NAP-200-003 Sheet 18/21 Installation of Main Equipment 6. MDFM/BATTM INSTALLATION When installing the MDFM and BATTM, follow the installation below. (1) Connect the RACK PARTS to the rear side of the BASE using the M5 Machine screws (provided). Note :This installation procedure is required when the system is 3 modules (PIM + MDFM + BATTM). Figure 003-16 Connection of RACK PARTS and BASE RACK PARTS BASE REAR M5 MACHINE SCREW-C (X2/JOINT AREA) (PROVIDED WITH RACK PARTS)