NEC Neax2000 Ivs Small Platform System Manual
Have a look at the manual NEC Neax2000 Ivs Small Platform System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
ND -4 6551 ( E) CHAPTER 3 NAP-200-0 02 3 82 mm 25 0 m m 430 mm PBX B OTT OM P O SIT IO N BO TTO M P OSITI ON
CHAPTER 3 ND-46551 (E) Pag e 3 0 Revision 2.0 NAP-200-002 Sheet 3/3 Marking and Drilling 3. DRILLING • Drilling and installing anchor bolts Figure 002-3 Instruction for Anchor Bolt (1) DRILL A HOLE IN THE CONCRETE WITH A DRILL SUITABLE FOR A PLUG BOLT A LITTLE DEEPER THAN THE PLUG BOLT LENGTH. (2) INSERT THE ANCHOR BOLT INTO THE HOLE. (3) PUSH ANCHOR BOLT UNTIL THE BOLT STAYS PERMANENTLY IN PLACE. (4) TURN BOLT COUNTERCLOCKWISE AND REMOVE.(1) (2) (3) (4)
ND-46551 (E) CHAPTER 3 Page 31 Revision 2.0 NAP-200-003 Sheet 1/21 Installation of Main Equipment Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch Rack-Mounting or Desk Top installation. 1. FLOOR STANDING INSTALLATION (1) Attaching the BASE to the floor. • Position the BASE over the holes drilled as shown in the figure below. • Secure the BASE to the floor using anchor bolts. Figure 003-1 Securing of the BASE BASE FRONT INSTALLATION HOLEANCHOR BOLT
CHAPTER 3 ND-46551 (E) Pag e 3 2 Revision 2.0 NAP-200-003 Sheet 2/21 Installation of Main Equipment (2) Mount the PIM on the BASE, and connect them together using 3 bolts (provided). Figure 003-2 Mounting of the PIM PIM BASE FRONT
ND-46551 (E) CHAPTER 3 Page 33 Revision 2.0 NAP-200-003 Sheet 3/21 Installation of Main Equipment (3) Position the TOP COVER on the PIM, and connect them together with 4 screws (provided). Figure 003-3 Mounting of the TOP COVER TOP COVER PIM FRONT
ND -4 6551 ( E) CHAPTER 3 NAP-200-0 03 SCR EW- A (4 p er PI M) M4 M ACHINE SCRE W-B (4 p er P IM ) (W ALL) 38 2 m m(1 5.0 in ch ) ANCHO R (4 p er PI M) RA CK PA RTS (9 .8 i nch )
CHAPTER 3 ND -4 6551 ( E) NAP-2 00-0 03 (PI M) (RE AR COVER)
ND-46551 (E) CHAPTER 3 Page 37 Revision 2.0 NAP-200-003 Sheet 7/21 Installation of Main Equipment (4) After hanging PIM onto the RACK PARTS, tighten each M4 machine screw using a phillips screw driver. Figure 003-6 Screwing the PIM to the RACK PARTS M4 MACHINE SCREW-B (X4) PIMRACK PARTS
CHAPTER 3 ND-46551 (E) Pag e 3 8 Revision 2.0 NAP-200-003 Sheet 8/21 Installation of Main Equipment (5) Connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM. The AC CORD-A-U is pre-installed with the BOTTOM COVER. Figure 003-7 Connecting the Covers and AC CORD to the PIM TOP COVER TO PZ-PW86 PIM AC CORD-A-U BOTTOM COVER LOCAL CABLE DUCT