    							ND -4 6551 ( E)  CHAPTER 3
    NAP-200-0 02
    3 82 mm
    25 0  m m
    430 mm
    PBX B OTT OM  P O SIT IO N
    BO TTO M P OSITI ON 
    						
    							CHAPTER 3 ND-46551 (E)
    Pag e 3 0
    Revision 2.0
    NAP-200-002
    Sheet 3/3
    Marking and Drilling
    3. DRILLING 
    • Drilling and installing anchor bolts
    Figure 002-3  Instruction for Anchor Bolt
     
    (1) DRILL A HOLE IN THE CONCRETE WITH A 
    DRILL SUITABLE FOR A PLUG BOLT A LITTLE 
    DEEPER THAN THE PLUG BOLT LENGTH.
    (2) INSERT THE ANCHOR BOLT INTO THE HOLE.
    (3) PUSH ANCHOR BOLT UNTIL THE BOLT 
    STAYS PERMANENTLY IN PLACE.
    (4) TURN BOLT COUNTERCLOCKWISE AND 
    REMOVE.(1) (2) (3) (4) 
    						
    							ND-46551 (E) CHAPTER 3
    Page 31
    Revision 2.0
    NAP-200-003
    Sheet 1/21
    Installation of Main Equipment
    Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch
    Rack-Mounting or Desk Top installation.
    1. FLOOR STANDING INSTALLATION
    (1) Attaching the BASE to the floor.
    • Position the BASE over the holes drilled as shown in the figure below.
    • Secure the BASE to the floor using anchor bolts.
    Figure 003-1  Securing of the BASE
    BASE
    FRONT
    INSTALLATION HOLEANCHOR BOLT 
    						
    							CHAPTER 3 ND-46551 (E)
    Pag e 3 2
    Revision 2.0
    NAP-200-003
    Sheet 2/21
    Installation of Main Equipment
    (2) Mount the PIM on the BASE, and connect them together using 3 bolts (provided).
    Figure 003-2  Mounting of the PIM
    PIM
    BASE
    FRONT 
    						
    							ND-46551 (E) CHAPTER 3
    Page 33
    Revision 2.0
    NAP-200-003
    Sheet 3/21
    Installation of Main Equipment
    (3) Position the TOP COVER on the PIM, and connect them together with 4 screws (provided).
    Figure 003-3  Mounting of the TOP COVER
    TOP COVER
    PIM
    FRONT 
    						
    							CHAPTER 3  ND -4 6551 ( E)
    NAP-2 00-0 03 
    						
    							ND -4 6551 ( E)  CHAPTER 3
    NAP-200-0 03
    SCR EW- A (4  p er PI M)
    M4 M ACHINE SCRE W-B  (4 p er  P IM )
    (W ALL)
    38 2 m m(1 5.0  in ch )
    ANCHO R (4  p er PI M)
    RA CK PA RTS
    (9 .8 i nch ) 
    						
    							CHAPTER 3  ND -4 6551 ( E)
    NAP-2 00-0 03
    (PI M)
    (RE AR COVER)
     
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
     
    						
    							ND-46551 (E) CHAPTER 3
    Page 37
    Revision 2.0
    NAP-200-003
    Sheet 7/21
    Installation of Main Equipment
    (4) After hanging PIM onto the RACK PARTS, tighten each M4 machine screw using a phillips screw driver.
    Figure 003-6  Screwing the PIM to the RACK PARTS
    M4 MACHINE SCREW-B (X4)
    PIMRACK PARTS 
    						
    							CHAPTER 3 ND-46551 (E)
    Pag e 3 8
    Revision 2.0
    NAP-200-003
    Sheet 8/21
    Installation of Main Equipment
    (5) Connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM. The AC CORD-A-U is
    pre-installed with the BOTTOM COVER.
    Figure 003-7  Connecting the Covers and AC CORD to the PIM
    TOP COVER
    TO PZ-PW86 PIM
    AC CORD-A-U
    BOTTOM COVER
    LOCAL CABLE DUCT 
    						