Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 361
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-99 Add a Switch Node Carrier (Standard Reliability) 6 Prepare New Switch Node Carrier D 1. Visually insp ec t the new J58890SA Switc h Node Carrier for any d amag e. Verify that the bac kp lane p ins are not b ent. NOTE: The enhanc ed R8r PPN AC c arrier may look d ifferent than the other c arriers bec ause it c omes with 16 new g round ing...
Page 362
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-100 Add a Switch Node Carrier (Standard Reliability) 6 Install New Switch Node Carrier 1.Install the switc h nod e c arrier into p osition “ D” b y lining up the p lastic alig nment tip s on the top rear of the c arrier with the sc rew holes in the c ab inet. These alig nment tip s sup p ort the c arrier while the sc rews are b eing rep...
Page 363
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-101 Add a Switch Node Carrier (Standard Reliability) 6 Figure 6-35. Locations of Top and Bottom Ground Straps on Standard and Enhanced Carriers 8.If the switc h nod e c arrier was installed in the “ D” position of the PPN, install the TDM/LAN c able (b etween the “ A” and “ D” c arriers) to the pin-field block labeled “TDM/LAN” on the right...
Page 364
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-102 Add a Switch Node Carrier (Standard Reliability) 6 9.If a switc h node c arrier was installed in the “ D” p osition, verify that the ZAHF4 TDM/LAN b us terminator is installed at slot 02 of the switc h nod e carrier “D”. See Figure 6-36 . If a switc h nod e c arrier is b eing installed in the “ E” p osition, verify that the ZAHF4...
Page 365
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-103 Add a Switch Node Carrier (Standard Reliability) 6 Figure 6-36. TDM/LAN Connections for Standard Reliability R8r EPN Figure Notes 1.Port Carrier (“ C” Position) 2. Port Carrier (“ B” Position) 3. Proc essor Carrier (“ A” Position)4. Switc h Nod e Carrier (“ D” Position) 5. TDM/LAN Bus Terminator (ZAHF4) 6. TDM/LAN Cab le (WP91716 L7)
Page 366
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-104 Add a Switch Node Carrier (Standard Reliability) 6 Install Circuit Packs 1.Install the new c irc uit p ac ks into c arrier “ D.” Use the d ec al and the up g rad e c onfig uration doc ument (p rovid ed with the eq uip ment) as a guide. 2. Install c irc uit p ac k b lanks in slots not eq uip p ed with c irc uit p ac ks. Interconnect Port...
Page 367
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-105 Add a Switch Node Carrier (Standard Reliability) 6 4. Behind p ort c arrier B of eac h EPN c ab inet: a. Install a lig htwave transc eiver on c ab le c onnec tor at slot 1B02. b . Connec t the other end of the fiber op tic c able to the lig htwave transc eiver, just installed . c . Carefully attac h the fib er op tic c ab le (with c ab le...
Page 368
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-106 Add a Switch Node Carrier (Standard Reliability) 6 Reseat DEFINITY LAN Gateway System 1. Reseat the LAN Gateway assemb ly into its b ac kp lane c onnec tors. Reseat DEFINITY AUDIX System 1. Reseat the AUDIX assemb ly to its b ac kp lane c onnec tors. Power Up System 1. At the c ab inet c ontaining the new switc h nod e c arrier, set the main c...
Page 369
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-107 Add a Switch Node Carrier (Standard Reliability) 6 Resolve Alarms and Enable Alarm Origination 1. Examine the alarm log . Resolve any alarms using DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r . 2. If the Alarm Origination Activated f ield ad ministration that you p reviously noted is alread y set to y , be sure...
Page 370
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-108 Add a Switch Node Carrier (High or Critical Reliability) 6 Add a Switch Node Carrier (High or Critical Reliability) To upg rad e to a hig h or c ritic al reliability R8r, a sec ond switc h nod e c arrier is ad d ed either to an emp ty “ E” c arrier p osition of an existing multic arrier p ort network or to the “ D” c arrier p osition (as...