Page 381

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-119 Add a Switch Node Carrier (High or Critical Reliability) 
6
Interconnect Port Networks
1. Behind the PPN cabinet (See Figure 6-37):
a. Connec t the metallic  intrac arrier c ab le b etween slots 1E01 and  
1E02.
b . Connec t the metallic  intrac arrier c ab le b etween slots 1D01 and  
1D02.
2. Behind  switc h nod e c arrier E of PPN c ab inet 1...

Page 382

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-120 Add a Switch Node Carrier (High or Critical Reliability) 
6
Figure 6-43. Critical-Reliability Fiber-Optic Connections through Center Stage Switch
2019 18 17 16 15 14 13 12111098 7654 321PORT CARRIER - J58890BB
CLOCKCONTROL CARRIER - J58890APAUXTERMINAL
CLOCKCONTROL CARRIER - J58890APAUXTERMINAL
FAN FAN FAN
SWITCH NODE CARRIER - J58890SA212019 18...

Page 383

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-121 Add a Switch Node Carrier (High or Critical Reliability) 
6
Reseat DEFINITY LAN Gateway System
1. Reseat the LAN Gateway assemb ly into its b ac kp lane c onnec tors.
Reseat DEFINITY AUDIX System
1. Reseat the AUDIX assemb ly to its b ac kp lane c onnec tors.
Power Up System
1. At eac h EPN, if p resent, set the main c irc uit breaker to ON.
2....

Page 384

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-122 Add a Switch Node Carrier (High or Critical Reliability) 
6
Enable PNC Duplication
All non-d up lic ated  SNIs to SNI fib er links are automatic ally dup lic ated .
1. Type change system-parameters customer-options
 and press 
En te r. On 
sc reen 2, set the PNC Duplication?
 field  to yes
. Press 
En te r.
2. Type change system-parameters...

Page 385

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-123 Add Center Stage Switch 
6
Add Center Stage Switch
Bec ause of the numerous installation p ossib ilities for c enter stag e switc hes, this 
sec tion is intend ed to p rovid e g eneral installation p roc ed ures only. For exac t 
req uirements per site, c ontac t your Luc ent Tec hnolog ies rep resentative.
The c enter stag e switc h (CSS) is c...

Page 386

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-124 Add Center Stage Switch 
6
Figure 6-45 shows 2 SNs used  as a CSS for up  to 23 EPNs. Use this c onfig uration 
when hig h inter-SN traffic  is exp ec ted .
Figure 6-45. 2-Switch Node CSS with High Inter-SN Traffic
Fiber Engineering for 2 SNs
Switc hes with 2 SNs are c onnec ted  b y 1 to 7 fib er links to p rovid e suffic ient 
switc hing  fab...

Page 387

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-125 Add Center Stage Switch 
6
Figure 6-46 shows 2 SNs used  as a CSS for up  to 29 EPNs. Use this c onfig uration 
when low inter-SN traffic  is exp ec ted .
Figure 6-46. 2-SN CSS with Low Inter-SN Traffic
Fiber Engineering for 2 SNs
Switc hes with 2 SNs are c onnec ted  b y 1 to 7 fib er links to p rovid e suffic ient 
switc hing  fab ric  at the...

Page 388

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-126 Add Center Stage Switch 
6
Figure 6-47. 3-SN CSS with High Inter-SN Traffic
Fiber Engineering for 3 SNs
Switc hes with 3 SNs are c onnec ted  b y 1 to 7 fib er links to p rovid e suffic ient 
switc hing  fab ric  at the CSS. The traffic  in all loc ales within a sing le SN d oes not 
req uire eng ineering . Only traffic  that links from loc ales...

Page 389

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-127 Add Center Stage Switch 
6
Figure 6-48 shows 3 SNs used  as a CSS for up  to 43 EPNs. Use this c onfig uration 
when low inter-SN traffic  is exp ec ted .
Figure 6-48. 3-SN CSS with Low Inter-SN Traffic
Fiber Engineering for 3 SNs
Switc hes with 3 SNs are c onnec ted  b y 1 to 7 fib er links to p rovid e suffic ient 
switc hing  fab ric  at the...

Page 390

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-128 Add MCC Port Carriers 
6
Add MCC Port Carriers
A new p ort c arrier c an b e installed when ad d itional features or eq uip ment 
exc eed  the c ap ac ity of the present system. Port c arriers are id entified  as B, C, D, 
a n d  E e xc e p t  f o r  a  PPN c ab inet with the d up lic ation op tion. The “ B”  c arrier is the 
sec ond  c ontrol c...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals