Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 381
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-119 Add a Switch Node Carrier (High or Critical Reliability) 6 Interconnect Port Networks 1. Behind the PPN cabinet (See Figure 6-37): a. Connec t the metallic intrac arrier c ab le b etween slots 1E01 and 1E02. b . Connec t the metallic intrac arrier c ab le b etween slots 1D01 and 1D02. 2. Behind switc h nod e c arrier E of PPN c ab inet 1...
Page 382
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-120 Add a Switch Node Carrier (High or Critical Reliability) 6 Figure 6-43. Critical-Reliability Fiber-Optic Connections through Center Stage Switch 2019 18 17 16 15 14 13 12111098 7654 321PORT CARRIER - J58890BB CLOCKCONTROL CARRIER - J58890APAUXTERMINAL CLOCKCONTROL CARRIER - J58890APAUXTERMINAL FAN FAN FAN SWITCH NODE CARRIER - J58890SA212019 18...
Page 383
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-121 Add a Switch Node Carrier (High or Critical Reliability) 6 Reseat DEFINITY LAN Gateway System 1. Reseat the LAN Gateway assemb ly into its b ac kp lane c onnec tors. Reseat DEFINITY AUDIX System 1. Reseat the AUDIX assemb ly to its b ac kp lane c onnec tors. Power Up System 1. At eac h EPN, if p resent, set the main c irc uit breaker to ON. 2....
Page 384
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-122 Add a Switch Node Carrier (High or Critical Reliability) 6 Enable PNC Duplication All non-d up lic ated SNIs to SNI fib er links are automatic ally dup lic ated . 1. Type change system-parameters customer-options and press En te r. On sc reen 2, set the PNC Duplication? field to yes . Press En te r. 2. Type change system-parameters...
Page 385
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-123 Add Center Stage Switch 6 Add Center Stage Switch Bec ause of the numerous installation p ossib ilities for c enter stag e switc hes, this sec tion is intend ed to p rovid e g eneral installation p roc ed ures only. For exac t req uirements per site, c ontac t your Luc ent Tec hnolog ies rep resentative. The c enter stag e switc h (CSS) is c...
Page 386
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-124 Add Center Stage Switch 6 Figure 6-45 shows 2 SNs used as a CSS for up to 23 EPNs. Use this c onfig uration when hig h inter-SN traffic is exp ec ted . Figure 6-45. 2-Switch Node CSS with High Inter-SN Traffic Fiber Engineering for 2 SNs Switc hes with 2 SNs are c onnec ted b y 1 to 7 fib er links to p rovid e suffic ient switc hing fab...
Page 387
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-125 Add Center Stage Switch 6 Figure 6-46 shows 2 SNs used as a CSS for up to 29 EPNs. Use this c onfig uration when low inter-SN traffic is exp ec ted . Figure 6-46. 2-SN CSS with Low Inter-SN Traffic Fiber Engineering for 2 SNs Switc hes with 2 SNs are c onnec ted b y 1 to 7 fib er links to p rovid e suffic ient switc hing fab ric at the...
Page 388
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-126 Add Center Stage Switch 6 Figure 6-47. 3-SN CSS with High Inter-SN Traffic Fiber Engineering for 3 SNs Switc hes with 3 SNs are c onnec ted b y 1 to 7 fib er links to p rovid e suffic ient switc hing fab ric at the CSS. The traffic in all loc ales within a sing le SN d oes not req uire eng ineering . Only traffic that links from loc ales...
Page 389
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-127 Add Center Stage Switch 6 Figure 6-48 shows 3 SNs used as a CSS for up to 43 EPNs. Use this c onfig uration when low inter-SN traffic is exp ec ted . Figure 6-48. 3-SN CSS with Low Inter-SN Traffic Fiber Engineering for 3 SNs Switc hes with 3 SNs are c onnec ted b y 1 to 7 fib er links to p rovid e suffic ient switc hing fab ric at the...
Page 390
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-128 Add MCC Port Carriers 6 Add MCC Port Carriers A new p ort c arrier c an b e installed when ad d itional features or eq uip ment exc eed the c ap ac ity of the present system. Port c arriers are id entified as B, C, D, a n d E e xc e p t f o r a PPN c ab inet with the d up lic ation op tion. The “ B” c arrier is the sec ond c ontrol c...