Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 341

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-79 Add TTC Japanese 2Mbit Trunks 
6
Add TTC Japanese 2Mbit Trunks
The TN2242 Jap an 2Mb it trunk interc onnec ts DEFINITY with other vend or 
eq uip ment in Jap an as well as to interc onnec t other DEFINITY switc hes throug h 
the Time Division Multip lexor d evice.
Installation
1. Determine the p ort assig nment of the trunk from the Trunk Group...

Page 342

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-80 Add a Control Carrier (Add Duplication) 
6
Add a Control Carrier (Add 
Duplication)
To upg rad e a stand ard -reliability system to a hig h- or c ritic al-reliab ility DEFINITY 
ECS Release 5 system, a sec ond  c ontrol c arrier is add ed  to c arrier p osition “ B”  
of the existing  multic arrier c ab inet PPN.
Service Interruption
1. Sinc e the...

Page 343

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-81 Add a Control Carrier (Add Duplication) 
6
Save Translations
1. Log  in at the manag ement terminal.
2. Type save translation [spe-a] disk
 and press 
En te r. This command 
instruc ts the system write all translation information from memory to d isk.
3. If the PPN or an EPN (where PPN Port Carrier B will b e reloc ated ) c ontains 
a TN750...

Page 344

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-82 Add a Control Carrier (Add Duplication) 
6
3. Select Reset System from the Maintenanc e menu.
4. Select 
Sh u t d o w n from the Res et Sy ste m menu.
5. Unseat the LAN Gateway assemb ly from its b ac kp lane c onnec tors.
Shut Down DEFINITY AUDIX System
1 . I f  a  D EFI N I TY AU D I X re s i d e s in  t h e  PPN  o r  a n  EPN  (w h e re  PPN...

Page 345

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-83 Add a Control Carrier (Add Duplication) 
6
Remove Circuit Packs from Port Carrier B
1.To ensure that c irc uit p ac ks and  p ower units in the “ B”  c arrier are p rop erly 
rep lac ed , lab el eac h c omp onent with its slot numb er.
2. Disc onnec t the p ower c ords from the p ower units in the “ B”  c arrier.
3. Remove all c irc uit p ac ks...

Page 346

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-84 Add a Control Carrier (Add Duplication) 
6
9. Slid e the c arrier forward  1 to 2 inc hes; then, from the b ac k, b e sure that no 
c ab les or wiring  harnesses are c aug ht on the c ab inet/c arrier framework.
!CAUTION:
Cab les and  wiring harnesses c an be d amag ed  if they c atc h on the 
framework and  if too muc h pressure is ap p lied  in...

Page 347

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-85 Add a Control Carrier (Add Duplication) 
6
Figure 6-29. Locations of Ground Jumpers on standard and enhanced fan-unit cabinetsFigure Notes
1. Port Carrier C
2. Port Carrier B
3. Ground  Jump ers
4.Control Carrier “ A”  5. Port Carrier “ D”
6. Port Carrier “ E”
7. Cabinet with standard  fan unit and  c arriers
8. Cabinet with enhanc ed  fan unit...

Page 348

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-86 Add a Control Carrier (Add Duplication) 
6
Prepare New Control Carrier B
1. Visually inspec t the new c arrier for any d amag e. Verify that the b ac kp lane 
pins are not bent.
NOTE:
The enhanc ed  R8r PPN AC c arrier may look d ifferent than the other 
c arriers bec ause it c omes with 16 new g round ing  jumpers and  8 
mounting  sc rews.
2....

Page 349

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-87 Add a Control Carrier (Add Duplication) 
6
6.Connec t the 8 g round  strap s from the “ A”  c arrier to the new “ B”  c arrier 
(See Figure 6-29
). These strap s were left c onnec ted  to the “ A”  c arrier 
when the old “B” c arrier was removed.
7. For a stand ard  AC-p owered  c ontrol c arrier, install the 4 c arrier g round  
strap s. The...

Page 350

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-88 Add a Control Carrier (Add Duplication) 
6
Figure 6-30. Locations of Top and Bottom Ground Straps on Standard and 
Enhanced Carriers
8.Connec t the loose end of the TDM/LAN c ab le (b etween the “ C”  and  “ B”  
c arriers) to the p in-field  b loc k marked “ TDM/LAN”  on the right sid e of the 
“B” carrier (See Figure 6-31
 and Table 6-8). The...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals