DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-29 Install a New EPN Cabinet in an Existing System 
6
1. At the rear of the Port Carrier in p osition C in Cab inet 1, install a 9823A 
lig htwave transc eiver onto Slot 2 (1C02). See Figure 6-16
.
2. Connec t a 20-foot fib er op tic  c ab le to the TX and  RX c onnec tors on the 
transc eiver. Lab el the c ab le to make the c onnec tions to Cab inet...

Page 292

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-30 Install a New EPN Cabinet in an Existing System 
6
Figure 6-16. Switch-Connected Release 8r with SNC in EPN Figure Notes:
1. Cab inet 1 (PPN)
2. Cab inet 2, 3, and  5 through 16 (MCC or SCC EPNs)3. Cab inet 4 (MCC EPN 
with One Switc h Nod e) 

Page 293

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-31 Install a New EPN Cabinet in an Existing System 
6
Switch-Connect New EPN to Existing PPN and
EPN (Critical Reliability)
For the following  c onnec tion examp le, the PPN c ab inet is c alled  Cab inet 1, the 
first EPN c ab inet is c alled  Cab inet 2, and  the EPN c ab inet c ontaining  the Switc h 
Nod e Carrier is c alled  Cab inet 4. 
NOTE:...

Page 294

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-32 Install a New EPN Cabinet in an Existing System 
6
14. At the rear of the Exp ansion Control Carrier in p osition A in Cab inet 2, 
install a lig htwave transc eiver onto Slot 1 (2A01).
15. Connec t a 20-foot (6 m) fib er op tic  c ab le to the TX and  RX c onnec tors on 
the transc eiver. Be sure to lab el the c ab le.
16. At the rear of the...

Page 295

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-33 Install a New EPN Cabinet in an Existing System 
6
Figure 6-17. Switch-Connected Release 8r with SNC in EPN
27. Connec t an H600-278 Metallic  Cab le from Slot 2 in the Port Carrier in 
p osition B in Cab inet 4 (4B02) to Slot 19 on the Switc h Node Carrier in 
p osition D in Cab inet 4 (4D19).
NOTE:
Both fib ers from eac h PN must c onnec t to...

Page 296

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-34 Remove an EPN Cabinet from an Existing System 
6
Remove an EPN Cabinet from an 
Existing System
All Systems
Before starting  the EPN removal p roc ess, p erform the following :
NOTE:
If you d o not d isab le the TTI, the translations c an be c orrup ted .
1. Type change system-parameters features
 and  p ress 
En te r . Use sc reen 2 
to d isab le...

Page 297

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-35 Remove an EPN Cabinet from an Existing System 
6
3. Type change fiber link
 and press En t e r. The Fib er Link Ad ministration 
sc reen ap p ears. Use this sc reen to unad minister fib er links, eac h of whic h 
is identified  b y a fiber numb er. 
a. The Is one endpoint remoted via DS1 Converter 
complex?
 field must remain administered.
b ....

Page 298

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-36 Remove an EPN Cabinet from an Existing System 
6
All Installations
1. When the system reset is finished, type status port-network 2
 and press 
En t e r. The Port Network Status sc reen ap p ears. Verify that PNC Ac tive is 
“ up ”  and that the Servic e State is “ in.”  
2. A Span LED, on the front of the DS1 Converter circuit pack, must be off...

Page 299

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-37 Remove an EPN Cabinet from an Existing System 
6
9. Type change system-parameters features
 and  p ress En t e r. Use this 
sc reen to c hang e the TTI field b ac k to its p revious setting  b efore the 
up g rad e.
10. When finished , p lac e d ust c overs over all exp osed  fib er c oup ling s that 
remain after the fib er op tic  c ab les are...

Page 300

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-38 Remove an EPN Cabinet from an Existing System 
6
c . In the DS1CONV Board Location
: field, remove the c ab inet, 
c arrier, and  slot that id entifies the physic al loc ation of DS1 
Converter c irc uit p ac k in the first end p oint of the d up lic ate fib er link. 
End p oint-1’s d uplic ate along  with Endp oint-2’s d up lic ate make up  
the...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals