Page 291
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-29 Install a New EPN Cabinet in an Existing System 6 1. At the rear of the Port Carrier in p osition C in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2 (1C02). See Figure 6-16 . 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to Cab inet...
Page 292
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-30 Install a New EPN Cabinet in an Existing System 6 Figure 6-16. Switch-Connected Release 8r with SNC in EPN Figure Notes: 1. Cab inet 1 (PPN) 2. Cab inet 2, 3, and 5 through 16 (MCC or SCC EPNs)3. Cab inet 4 (MCC EPN with One Switc h Nod e)
Page 293
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-31 Install a New EPN Cabinet in an Existing System 6 Switch-Connect New EPN to Existing PPN and EPN (Critical Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet is c alled Cab inet 2, and the EPN c ab inet c ontaining the Switc h Nod e Carrier is c alled Cab inet 4. NOTE:...
Page 294
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-32 Install a New EPN Cabinet in an Existing System 6 14. At the rear of the Exp ansion Control Carrier in p osition A in Cab inet 2, install a lig htwave transc eiver onto Slot 1 (2A01). 15. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 16. At the rear of the...
Page 295
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-33 Install a New EPN Cabinet in an Existing System 6 Figure 6-17. Switch-Connected Release 8r with SNC in EPN 27. Connec t an H600-278 Metallic Cab le from Slot 2 in the Port Carrier in p osition B in Cab inet 4 (4B02) to Slot 19 on the Switc h Node Carrier in p osition D in Cab inet 4 (4D19). NOTE: Both fib ers from eac h PN must c onnec t to...
Page 296
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-34 Remove an EPN Cabinet from an Existing System 6 Remove an EPN Cabinet from an Existing System All Systems Before starting the EPN removal p roc ess, p erform the following : NOTE: If you d o not d isab le the TTI, the translations c an be c orrup ted . 1. Type change system-parameters features and p ress En te r . Use sc reen 2 to d isab le...
Page 297
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-35 Remove an EPN Cabinet from an Existing System 6 3. Type change fiber link and press En t e r. The Fib er Link Ad ministration sc reen ap p ears. Use this sc reen to unad minister fib er links, eac h of whic h is identified b y a fiber numb er. a. The Is one endpoint remoted via DS1 Converter complex? field must remain administered. b ....
Page 298
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-36 Remove an EPN Cabinet from an Existing System 6 All Installations 1. When the system reset is finished, type status port-network 2 and press En t e r. The Port Network Status sc reen ap p ears. Verify that PNC Ac tive is “ up ” and that the Servic e State is “ in.” 2. A Span LED, on the front of the DS1 Converter circuit pack, must be off...
Page 299
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-37 Remove an EPN Cabinet from an Existing System 6 9. Type change system-parameters features and p ress En t e r. Use this sc reen to c hang e the TTI field b ac k to its p revious setting b efore the up g rad e. 10. When finished , p lac e d ust c overs over all exp osed fib er c oup ling s that remain after the fib er op tic c ab les are...
Page 300
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-38 Remove an EPN Cabinet from an Existing System 6 c . In the DS1CONV Board Location : field, remove the c ab inet, c arrier, and slot that id entifies the physic al loc ation of DS1 Converter c irc uit p ac k in the first end p oint of the d up lic ate fib er link. End p oint-1’s d uplic ate along with Endp oint-2’s d up lic ate make up the...