Page 281
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-19 Add the Fiber Optic Cable 6 Figure 6-10. Replace the Fan Cover 13. Connec t the fib er c ab le to the ang led c onnec tor on the front of the c irc uit pack. See Figure 6-11 . lcda5fop EWS 110398 ENTER /YES ENTER /YES NEXT /NO NEXT / NO BACK BACK AUDIX AUDIXBOOT/ SHUTDOWN BOOT/ SHUTDOWN ALARMS EMER TR EMERTR
Page 282
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-20 Add the Fiber Optic Cable 6 Figure 6-11. Connect Fiber Cable to Circuit Pack 14. Dress the cable using the supplied cable ties and cable tie mounts. See Figure 6-12 . NOTE: Dress the fiber optic c able straight down the front of the circuit pack. Do not allow the c ab le to c ross in front of another c irc uit p ac k. scdafo_4 KLC 051298 C12...
Page 283
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-21 Add the Fiber Optic Cable 6 Figure 6-12. Dress the Cable 15. If a c irc uit p ac k was removed to ac c ess 2 op en slots (from ‘‘Cabinet Preparation’’ on page 6-10), rep lac e the c irc uit p ac k into its orig inal slot. 16. Close the front d oor. 17. Discard the pass-thru tool. Test the Installation 1. Log in to the manag ement terminal. 2....
Page 284
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-22 Install a New EPN Cabinet in an Existing System 6 Install a New EPN Cabinet in an Existing System Figure 6-13 shows a typ ic al multic arrier EPN c ab inet. Eac h EPN c ab inet is normally p ositioned ad jac ent to the PPN c abinet b ut may b e loc ated remotely in a d ifferent room or a d ifferent b uild ing . Figure 6-13. Typical...
Page 285
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-23 Install a New EPN Cabinet in an Existing System 6 Connect Power and Ground 1. For an AC- or DC-p owered system, c onnec t p ower and ground to the c ab inet as instruc ted in DEFINITY Enterp rise Communic ations Server Release 8 Installation and Test for Multic arrier Cab inets . 2. Connec t the ap p roved g round to the new c abinet as...
Page 286
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-24 Install a New EPN Cabinet in an Existing System 6 1. Install a 9823A lig htwave transc eiver onto Slot 1 on the rear of the PPN Control Carrier. See Figure 6-14 . 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to the EPN c ab inet easier. 3. Route...
Page 287
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-25 Install a New EPN Cabinet in an Existing System 6 Direct-Connect New EPN to Existing PPN and EPN (Standard Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet (next to the PPN c ab inet) is c alled Cab inet 2, and the last EPN c ab inet is c alled Cab inet 3. 1. At the rear...
Page 288
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-26 Install a New EPN Cabinet in an Existing System 6 Direct-Connect New EPN to Existing PPN and EPN (High or Critical Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet (next to the PPN c ab inet) is c alled Cab inet 2, and the last EPN c ab inet is c alled Cab inet 3. 1. At...
Page 289
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-27 Install a New EPN Cabinet in an Existing System 6 Interconnect Cabling Release 8r For more fib er op tic c ab ling information, refer to DEFINITY Enterp rise Communications Server Release 8 Installation and Test for Multicarrier Cabinets . Switch-Connect New EPN to Existing PPN and EPN (Standard Reliability) For the following c onnec tion...
Page 290
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-28 Install a New EPN Cabinet in an Existing System 6 Figure 6-15. Switch-Connected Release 8r with SNC in EPN Switch-Connect New EPN to Existing PPN and EPN (High Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet is c alled Cab inet 2, and the EPN c ab inet c ontaining the...