Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 281

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-19 Add the Fiber Optic Cable 
6
Figure 6-10. Replace the Fan Cover
13. Connec t the fib er c ab le to the ang led  c onnec tor on the front of the c irc uit 
pack. See Figure 6-11
.
lcda5fop EWS 110398
ENTER
/YES ENTER
/YES NEXT
/NO NEXT
/
NO BACK
BACK
AUDIX
AUDIXBOOT/
SHUTDOWN BOOT/
SHUTDOWN
ALARMS
EMER TR EMERTR 

Page 282

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-20 Add the Fiber Optic Cable 
6
Figure 6-11. Connect Fiber Cable to Circuit Pack
14. Dress the cable using the supplied cable ties and cable tie mounts. See 
Figure 6-12
.
NOTE:
Dress the fiber optic  c able straight down the front of the circuit pack. 
Do not allow the c ab le to c ross in front of another c irc uit p ac k.
scdafo_4 KLC 051298
C12...

Page 283

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-21 Add the Fiber Optic Cable 
6
Figure 6-12. Dress the Cable
15. If a c irc uit p ac k was removed  to ac c ess 2 op en slots (from ‘‘Cabinet 
Preparation’’ on page 6-10), rep lac e the c irc uit p ac k into its orig inal slot.
16. Close the front d oor.
17. Discard the pass-thru tool.
Test the Installation
1. Log in to the manag ement terminal.
2....

Page 284

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-22 Install a New EPN Cabinet in an Existing System 
6
Install a New EPN Cabinet in an 
Existing System
Figure 6-13 shows a typ ic al multic arrier EPN c ab inet. Eac h EPN c ab inet is 
normally p ositioned  ad jac ent to the PPN c abinet b ut may b e loc ated  remotely in 
a d ifferent room or a d ifferent b uild ing .
Figure 6-13. Typical...

Page 285

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-23 Install a New EPN Cabinet in an Existing System 
6
Connect Power and Ground 
1. For an AC- or DC-p owered  system, c onnec t p ower and ground  to the 
c ab inet as instruc ted  in 
DEFINITY Enterp rise Communic ations Server 
Release 8 Installation and  Test for Multic arrier Cab inets
.
2. Connec t the ap p roved  g round  to the new c abinet as...

Page 286

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-24 Install a New EPN Cabinet in an Existing System 
6
1. Install a 9823A lig htwave transc eiver onto Slot 1 on the rear of the PPN 
Control Carrier. See Figure 6-14
.
2. Connec t a 20-foot fib er op tic  c ab le to the TX and  RX c onnec tors on the 
transc eiver. Lab el the c ab le to make the c onnec tions to the EPN c ab inet 
easier. 
3. Route...

Page 287

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-25 Install a New EPN Cabinet in an Existing System 
6
Direct-Connect New EPN to Existing PPN and
EPN (Standard Reliability)
For the following  c onnec tion examp le, the PPN c ab inet is c alled  Cab inet 1, the 
first EPN c ab inet (next to the PPN c ab inet) is c alled  Cab inet 2, and  the last EPN 
c ab inet is c alled  Cab inet 3.
1. At the rear...

Page 288

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-26 Install a New EPN Cabinet in an Existing System 
6
Direct-Connect New EPN to Existing PPN and
EPN (High or Critical Reliability)
For the following  c onnec tion examp le, the PPN c ab inet is c alled  Cab inet 1, the 
first EPN c ab inet (next to the PPN c ab inet) is c alled  Cab inet 2, and  the last EPN 
c ab inet is c alled  Cab inet 3. 
1. At...

Page 289

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-27 Install a New EPN Cabinet in an Existing System 
6
Interconnect Cabling Release 8r 
For more fib er op tic  c ab ling information, refer to DEFINITY Enterp rise 
Communications Server Release 8 Installation and Test for Multicarrier Cabinets
.
Switch-Connect New EPN to Existing PPN and
EPN (Standard Reliability)
For the following  c onnec tion...

Page 290

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-28 Install a New EPN Cabinet in an Existing System 
6
Figure 6-15. Switch-Connected Release 8r with SNC in EPN
Switch-Connect New EPN to Existing PPN and
EPN (High Reliability)
For the following  c onnec tion examp le, the PPN c ab inet is c alled  Cab inet 1, the 
first EPN c ab inet is c alled  Cab inet 2, and  the EPN c ab inet c ontaining  the...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals