Page 231

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-83 Critical Reliability 
5
Figure 5-24. Location of P1 and P2 Connectors
Prepare the New A and B Position Carriers
1. Insp ec t the new c arriers for any d amag e. Verify that the b ac kp lane pins 
are not b ent.
2. Plac e the exp ansion c ontrol c arrier on the floor so that the rear of the 
carrier faces up.
3.Install the CFY1 c urrent...

Page 232

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-84 Critical Reliability 
5
Install the New A and B Position Carriers
1.Install the J58890AF Exp ansion Control Carrier in p osition “ A”  b y lining  up  
the p lastic  alig nment tip s on the top  rear of the c arrier with the sc rew holes 
in the c ab inet. These alig nment tip s will sup port the c arrier while the 
sc rews are b eing  rep...

Page 233

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-85 Critical Reliability 
5
12.Connec t the loose end of the TDM/LAN c ab le (b etween the “ A”  and  “ D”  
c arriers) to the p in-field  b loc k marked “ TDM”  on the rig ht sid e of the “ A”  
c arrier (see Figure 5-26
 and  Table 5-15). The other end  remained  
c onnec ted  to the “ D”  c arrier when the old c arrier was removed .
13....

Page 234

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-86 Critical Reliability 
5
Figure 5-25. TDM/LAN Connections for Critical Reliability Release 8 EPN Figure Notes
1. ZAHF4 TDM/LAN Terminator
2. TDM/LAN Cab le (WP91716 L6)
3. Slot 21
4.Inter-Carrier Cables (“A” and  “B”) 
H600-204, G15. Slot 02
6. TDM/LAN Cable (WP91716 L7)
7. ICCA and  ICCB Connec tors) 

Page 235

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-87 Critical Reliability 
5
16.Install the front trim p lates; first on the “ A”  c arrier, and  then on the “ B”  
carrier.
17. Install the ICC c ab les (H600-204 G1) b etween c arriers “ A”  and  “ B.”  
Connec t the c ab les to the “ ICC”  p in-field  b loc k on b oth c arriers (see 
Figure 5-27
 and  Figure 5-28 and Table 5-16). Install...

Page 236

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-88 Critical Reliability 
5
Figure 5-26. ICC Connections for the Expansion Control Carrier
Table 5-16. Intercarrier Cable Connections
Connect ICC Cables
From To
Carrier Pin-Field  Bloc k Carrier Pin-Field Bloc k
EPN J58890AF ICCA
ICCBJ58890BB ICCA
ICCB
Figure Notes
1. ICCA Connec tors
2. ICCB Connec tors3. CURL (Current Limiter) Connec tors 

Page 237

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-89 Critical Reliability 
5
Figure 5-27. ICC Connections for the Port Carrier Figure Notes
1. ICCA Connec tors 2. ICCB Connec tors 

Page 238

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-90 Critical Reliability 
5
Test the CURL
1. Plug  the c ab inet p ower c ord  into the ap p rop riate rec ep tac le.
2. At the power d istribution unit, set the main c irc uit b reaker to ON.
3.Unp lug  the p ower c ord  from the p ower unit “ B”  (rig ht-hand  side) in the “ A”  
carrier.
4. The fans must b e running . If not, c hec k the...

Page 239

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-91 Critical Reliability 
5
Interconnect Port Networks — Critical Reliability 
Fiber op tic  c abling  terminated  to 9823A lig htwave transc eivers c an interc onnec t 
PNs up  to 4,900 feet (1493 m) ap art. Fib er op tic  c ab ling  terminated to 9823B 
lig htwave transc eivers c an interc onnec t PNs up  to 25,000 feet (7620 m) ap art....

Page 240

DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  555-233-115  Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-92 Critical Reliability 
5
Fiber-Remoted Port Networks
For a c ritic al reliab ility system with 1 fib er-remoted  EPN, use 4 fib er op tic  c ab les, 
4 lig htwave transc eivers, and  4 lig htguid e interc onnec t units (p rovided  b y the 
PSC). For a c ritic al reliab ility system with 2 fib er-remoted  EPNs, use 12 fiber op tic  
c ab...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals