Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 231
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-83 Critical Reliability 5 Figure 5-24. Location of P1 and P2 Connectors Prepare the New A and B Position Carriers 1. Insp ec t the new c arriers for any d amag e. Verify that the b ac kp lane pins are not b ent. 2. Plac e the exp ansion c ontrol c arrier on the floor so that the rear of the carrier faces up. 3.Install the CFY1 c urrent...
Page 232
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-84 Critical Reliability 5 Install the New A and B Position Carriers 1.Install the J58890AF Exp ansion Control Carrier in p osition “ A” b y lining up the p lastic alig nment tip s on the top rear of the c arrier with the sc rew holes in the c ab inet. These alig nment tip s will sup port the c arrier while the sc rews are b eing rep...
Page 233
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-85 Critical Reliability 5 12.Connec t the loose end of the TDM/LAN c ab le (b etween the “ A” and “ D” c arriers) to the p in-field b loc k marked “ TDM” on the rig ht sid e of the “ A” c arrier (see Figure 5-26 and Table 5-15). The other end remained c onnec ted to the “ D” c arrier when the old c arrier was removed . 13....
Page 234
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-86 Critical Reliability 5 Figure 5-25. TDM/LAN Connections for Critical Reliability Release 8 EPN Figure Notes 1. ZAHF4 TDM/LAN Terminator 2. TDM/LAN Cab le (WP91716 L6) 3. Slot 21 4.Inter-Carrier Cables (“A” and “B”) H600-204, G15. Slot 02 6. TDM/LAN Cable (WP91716 L7) 7. ICCA and ICCB Connec tors)
Page 235
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-87 Critical Reliability 5 16.Install the front trim p lates; first on the “ A” c arrier, and then on the “ B” carrier. 17. Install the ICC c ab les (H600-204 G1) b etween c arriers “ A” and “ B.” Connec t the c ab les to the “ ICC” p in-field b loc k on b oth c arriers (see Figure 5-27 and Figure 5-28 and Table 5-16). Install...
Page 236
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-88 Critical Reliability 5 Figure 5-26. ICC Connections for the Expansion Control Carrier Table 5-16. Intercarrier Cable Connections Connect ICC Cables From To Carrier Pin-Field Bloc k Carrier Pin-Field Bloc k EPN J58890AF ICCA ICCBJ58890BB ICCA ICCB Figure Notes 1. ICCA Connec tors 2. ICCB Connec tors3. CURL (Current Limiter) Connec tors
Page 237
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-89 Critical Reliability 5 Figure 5-27. ICC Connections for the Port Carrier Figure Notes 1. ICCA Connec tors 2. ICCB Connec tors
Page 238
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-90 Critical Reliability 5 Test the CURL 1. Plug the c ab inet p ower c ord into the ap p rop riate rec ep tac le. 2. At the power d istribution unit, set the main c irc uit b reaker to ON. 3.Unp lug the p ower c ord from the p ower unit “ B” (rig ht-hand side) in the “ A” carrier. 4. The fans must b e running . If not, c hec k the...
Page 239
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-91 Critical Reliability 5 Interconnect Port Networks — Critical Reliability Fiber op tic c abling terminated to 9823A lig htwave transc eivers c an interc onnec t PNs up to 4,900 feet (1493 m) ap art. Fib er op tic c ab ling terminated to 9823B lig htwave transc eivers c an interc onnec t PNs up to 25,000 feet (7620 m) ap art....
Page 240
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-92 Critical Reliability 5 Fiber-Remoted Port Networks For a c ritic al reliab ility system with 1 fib er-remoted EPN, use 4 fib er op tic c ab les, 4 lig htwave transc eivers, and 4 lig htguid e interc onnec t units (p rovided b y the PSC). For a c ritic al reliab ility system with 2 fib er-remoted EPNs, use 12 fiber op tic c ab...